Content |
---|
SCORE 71 Construction staging area ![]() ![]() Permit status: Expired | Expiration date: July 22, 2014 | Permit id: Pa10144675 |
SCORE 71 Steel plate- single location ![]() ![]() Permit status: Permit expired | Expiration date: June 20, 2014 | Permit id: Pa10145408 |
SCORE 62 2nd street: water 3 new tee connections to existing 8 line, one for domestic water service, one for a fire service lateral and one for a new fire hydrant. Sanitary sewer 2 lateral connections to existing 26 combined sewer, one is a lateral and one is an 8 lateral. Each connection will be made at a new manhole locations and a new cleanout will be installed between the existing line and the building. G street: sanitary sewer one 8 lateral connection to existing 15 combined sewer. The connection will be made at a new manhole and a new cleanout will be installed between the existing line and the building. Public alley: a new 15 combined sewer will run the length of the public alley. This sewer will be approximately 318 linear feet of pvc sdr-35 pipe. The new line will connect to an existing manhole located in g street. ![]() ![]() Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: August 11, 2014 | Permit id: Pa89339-R1 |
SCORE 71 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: May 21, 2014 | Permit id: Pa10135742 |
SCORE 62 2nd street: water 3 new tee connections to existing 8 line, one for domestic water service, one for a fire service lateral and one for a new fire hydrant. Sanitary sewer 2 lateral connections to existing 26 combined sewer, one is a lateral and one is an 8 lateral. Each connection will be made at a new manhole locations and a new cleanout will be installed between the existing line and the building. G street: sanitary sewer one 8 lateral connection to existing 15 combined sewer. The connection will be made at a new manhole and a new cleanout will be installed between the existing line and the building. Public alley: a new 15 combined sewer will run the length of the public alley. This sewer will be approximately 318 linear feet of pvc sdr-35 pipe. The new line will connect to an existing manhole located in g street. ![]() ![]() Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: June 12, 2014 | Permit id: Pa89339 |
SCORE 100 Construction staging area ![]() ![]() Permit status: Expired | Expiration date: April 5, 2014 | Permit id: Pa10115618 |
SCORE 95 Build 1 tap hole and 26 of mainline condduit to connect 725-t 2nd street, n. E. With temporary underground service; sidewalk of 2nd street north of "g" street, n. E. As indicated on the attached prints. Wr #3402828 tcp-custom cut #27965 stephen j. Park (202) 388-2573 sjpark@pepco. Com (c dallas) ![]() ![]() Permit status: Permit expired | Expiration date: September 12, 2013 | Permit id: Pa84204 |
SCORE 95 Build 1 tap hole and 26 of mainline condduit to connect 725-t 2nd street, n. E. With temporary underground service; sidewalk of 2nd street north of "g" street, n. E. As indicated on the attached prints. Wr #3402828 tcp-custom cut #27965 stephen j. Park (202) 388-2573 sjpark@pepco. Com (c dallas) ![]() ![]() Permit type: Excavation; electric ml conduit (trench), excavation; manhole installation | Permit status: Permit expired | Expiration date: September 12, 2013 | Permit id: Pa84204 |
SCORE 100 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: August 12, 2013 | Permit id: Pa10086888 |
SCORE 95 Build 26 of mainline to to connect 725-t 2nd street, n. E. With temporary underground service; sidewalk of 2nd street north of "g" street, n. E. As indicated on the attached prints. Wr #3402828 tcp-custom cut #27965 stephen j. Park (202) 388-2573 sjpark@pepco. Com (c. Dallas) ![]() ![]() Permit status: Permit expired | Expiration date: April 25, 2013 | Permit id: Pa79231 |