Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 Excavate to repair conduit at the front of 719 euclid st nw. Sq 2884, in nw bounded by georgia av, 9th st, and fairmont st in accordance with tcp 4 for job 7a00472a. This work is for fios, use the fios drawdown account. Hours permitted to work are between 9: am to 5: pm monday thru friday. Date: April 16, 2010 Contractor: Verizon Washington Dc Inc Permit type: Excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: July 25, 2010 | Permit id: Pa54963 | |||||
SCORE 100 Construction staging area Date: June 21, 2010 Contractor: Verizon Washington Dc Permit status: Expired | Expiration date: June 28, 2010 | Permit id: Pa10006512 | |||||
SCORE 50 Moving storage container Contractor: Jacquelin Magby Permit status: Withdrawn | Expiration date: December 16, 2011 | Permit id: 0 | |||||
SCORE 84 Excavation; telecom ml conduits (trench) Contractor: Verizon Washington Dc Inc Permit status: 8 | Expiration date: July 25, 2010 | Permit id: Pa54963 | |||||
SCORE 50 Moving storage container Contractor: Jacquelin Magby Permit status: Withdrawn | Expiration date: December 16, 2011 | Permit id: 0 |