Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plbg to change from elec to lgp gasline for existing sfd Date: April 1, 2010 Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2010-1011-20 | Parcel: 187-560-01-00 | |||||
SCORE 87 Hra: heat pump replacement, like-for-like Date: August 29, 2006 Contractor: Alessio Heating And Air Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 187-560-01-00 | |||||
SCORE 100 Solar water heater system no. Of tanks: 1 per section 46 (i) of the zoning ordinance, roof mounted solar water heater systems shall not extend more than 5 above the highest point of the existing roof. Date: August 2, 2012 Contractor: Cleantech Energy Solutions Inc Permit type: Solar water heater (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 187-560-01-00 |