Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: November 27, 2017 Contractor: Vyatcheslav Kobrin Client: Trustar Real Estate Solut | Permit type: Mechanical permit | Permit status: Active | Completion date: November 27, 2017 | Permit id: 834708 | |||||
For the erection of a semi-detached structure with roof deck accessed from the third story rear and basement with one (1) accessory interior parking space, for use as a single family household living, size and location as shown in the application plan, Date: August 2, 2017 Client: Trustar Real Estate Solut | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 2, 2017 | Permit id: 793211 | |||||
For the new construction of a semi-detached three (3) story single family dwelling with roof deck accessed from the third story rear, and basement with one (1) accessory interior parking space and the placement of underpinning, as per plans, Date: August 2, 2017 Client: Trustar Real Estate Solut | Permit type: New construction permit | Permit status: Active | Completion date: October 6, 2017 | Permit id: 793212 | |||||
SCORE 89 Install new wiring throughout,new 200amp service,new switches,outlets,gfcis and light fixtures per 2008 nec (sfd) Date: September 25, 2017 Contractor: Green Team Electric Inc Client: Trustar Real Estate Solut | Permit type: Electrical permit | Permit status: Active | Completion date: September 25, 2017 | Permit id: 818771 | |||||
SCORE 89 The installation of a one (1) inch combined service line for a fire & domestic supply line. Multipurpose residential fire sprinkler system designed in accordance with nfpa 13d. All work shall be accordance with approved plans, hydraulic calculations, an dapproved building permit. Any deviation will require a seperate permit. Date: October 3, 2017 Contractor: Aqueduct Fire Protection Client: Trustar Real Estate Solut | Permit type: Suppression permit | Permit status: Active | Completion date: October 3, 2017 | Permit id: 820105 | |||||
SCORE 90 Install 1" water combo,curb trap and fai pa20172842296 (sfd( "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: October 19, 2017 Contractor: Coffelt Contracting Client: Trustar Real Estate Solut | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 25, 2017 | Permit id: 825432 | |||||
SCORE 89 Install drain and water lines from basement to 3 toilets,3 sinks,3 shower tubs,laundry and 1 kitchen sink (sfd)the installation will comply with the philadelphia plumbing code 2004 Date: December 13, 2017 Contractor: Reliance Star Plumbing And Heat Client: Trustar Real Estate Solut | Permit type: Plumbing permit | Permit status: Active | Completion date: December 15, 2017 | Permit id: 839014 |