Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Tear-off reroof of sfd, 18. 33 squares on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Date: July 5, 2011 Contractor: Onsite Production Srvs Client: Living Bond | Applicant: Onsite Production Srvs/ | Permit type: Roofing | Permit status: Cmp | Completion date: January 15, 2014 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount 6. 12 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Structural modifications required. Contractor to maintain min. 12inch of space between the ridge and panels parallel to ridge along the length of the ridge and on either side of the ridge. A 30inch min. Pathway must be provided at the edge of the roof, perpendicular to the ridge on one side only. Client: Living Bond | Applicant: Solarcity Corporation | Permit type: Building, photovolta | Permit status: Iss | Current use: Single family d | |||||
SCORE 95 Replacement water heater Client: Charles Bond | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-20203 | |||||
SCORE 95 Replacement comfort cooling Client: Charles Bond | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-20218 | |||||
SCORE 86 Tear-off reroof of sfd, 18. 33 squares on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Client: Living Bond | Permit type: Roofing | Permit status: Cmp | Completion date: January 15, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02809 | |||||
SCORE 95 Installation of a flush mount 6. 12 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Structural modifications required. Contractor to maintain min. 12inch of space between the ridge and panels parallel to ridge along the length of the ridge and on either side of the ridge. A 30inch min. Pathway must be provided at the edge of the roof, perpendicular to the ridge on one side only. Client: Living Bond | Permit type: Building, photovoltaic | Permit status: Cmp | Completion date: November 17, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-02294 | |||||
SCORE 96 Total tear-off and reroof with asphalt shingles. 16. 5 squares. Contractor indicates a roof pitch of 4 12 Client: Charles Bond | Permit type: Roofing | Permit status: Cmp | Completion date: November 3, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-04740 |