Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit ![]() Client: Isabella Teresa Isabella Victoria | Permit status: Expired | Permit id: 75378 | |||||
Electrical permit ![]() Client: Isabella Teresa Isabella Victoria | Permit status: Expired | Permit id: 75758 | |||||
Plumbing permit ![]() Client: Isabella Teresa Isabella Victoria | Permit status: Completed | Permit id: 82850 | |||||
Electrical permit ![]() Client: Isabella Teresa Isabella Victoria | Permit status: Expired | Permit id: 75758 | |||||
Plumbing permit ![]() Client: Isabella Teresa Isabella Victoria | Permit status: Completed | Permit id: 82850 | |||||
Alteration permit ![]() Client: Isabella Teresa Isabella Victoria | Permit status: Expired | Permit id: 75378 | |||||
SCORE 100 Replace water distribution pipe from curb to inside basement at water meter, 3 4" k copper. ![]() ![]() Client: Sabella Teresa Isabella Victoria | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 13, 2008 | Permit id: 82850 | |||||
Repair rebuild rear 2nd and 3rd floor bay, apply gwb to existing interior walls and ceilings. No new walls. Open existing cellar steps and install door. Replace lintel front. Replace front steps. ![]() Client: Sabella Teresa Isabella Victoria | Permit type: Alteration permit | Permit status: Expired | Completion date: January 14, 2009 | Permit id: 75378 | |||||
SCORE 100 Change of contractor work existing. Shelton electric will be continuing to complete existing electrical work. Installing 48 outlets, sws, 8 lts - recess lts are existing. 110v line for heater. Amp line for ac. (south dist) ![]() ![]() Client: Sabella Teresa Isabella Victoria | Permit type: Electrical permit | Permit status: Expired | Completion date: May 14, 2007 | Permit id: 75758 |