Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Rhew mh lot 25 ![]() Permit status: Closed | Permit id: 09-06138 | |||||
SCORE 100 Rhew mh lot 25 Client: Rhew Mh Lot 25 | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 09-06138 | Parcel: 21982 | |||||
SCORE 99 Rhew mh lot 25 Client: Rhew Mh Lot 25 | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 09-06138 | Parcel: 21982 | |||||
December 3, 2009 1:02:45 pm kneel. Rhew - used mh to lot 25. Location: new liecester hwy to theo on right, before eliada home rd.; january 8, 20 11:49: am jfortner. Premise # redacted phone number4; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do n Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 09-06138 | Parcel: 21982 | |||||
Rhew mh lot 25 ![]() ![]() Permit type: Residential | Permit status: Closed | Permit id: 09-06138 | |||||
December 3, 2009 1:02:45 pm kneel. Rhew - used mh to lot 25. Location: new liecester hwy to theo on right, before eliada home rd.; january 8, 20 11:49: am jfortner. Premise # redacted phone number4; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do n ![]() Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 09-06138 | Parcel: 21982 |