Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Direction drill & install (2) 1. 25 sdr-11 hdpe duct w/tracer wire - minimum bury depth 48 george huf ![]() ![]() Client: Tube Processing Corp | Permit type: Right of way | Permit status: Issued | Permit id: Row14-06589 | |||||
SCORE 86 Direction drill & install (2) 1. 25 sdr-11 hdpe duct w/tracer wire - minimum bury depth 48 george huf ![]() ![]() Client: Tube Processing Corp | Permit type: Right of way | Permit status: Issued | Permit id: Row14-06589 |