Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Hvac Date: August 15, 2011 Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 11044-20000-092 | |||||
SCORE 100 Hvac Date: September 14, 2011 Contractor: Ricardo Fonseca Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 11044-20001-092 | |||||
13-6" x 29-5" addition to (e) sfd: add 2 bedrooms and bathroom. In Date: August 17, 2011 Value: $42,000 Permit type: Bldg-addition | Permit status: Cofo issued | Current use: 1 or 2 family dwelling | Permit id: 11014-20000-029 | |||||
SCORE 100 Remodel the bathroom and bedroom in (e) sfd. Convert a portion of the Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 11016-20000-145 | |||||
Pv1 sfd. Total system size 3. 6kw dc/ 6kw max ac. Using transformerless Date: January 20, 2015 Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-013 | |||||
SCORE 59 Pv1 sfd. Total system size 3. 6kw dc/ 6kw max ac. Using transformerless Date: January 20, 2015 Contractor: Tigran Teravetisyan Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-013 | |||||
SCORE 59 Pv1 sfd. Total system size 3. 6kw dc 6kw max ac. Using transformerless Date: January 20, 2015 Contractor: Tigran Teravetisyan Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-013 |