RENOVATION HISTORY
Based on the information received from building department, associated with 677 Huntington Av Boston MA 02115 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
Office fitout of approx. 4 800 sf of shell space on the ground level including mep fp fa partitioms and finishes.
Date:  November 14, 2014
Value:   $200,000
Contractor: Adam Gordon

Client: D.B.A: Facilities & Operations | Permit type: Fast track applicati | Current use: Comm | Permit id: Alt420289 | Parcel: 401882000
2014/11/14200000100677 Huntington Av Boston Ma 02115Adam Gordon
SCORE
96
Harvard university - school of public health - kresge bldg - lower level -construct new steel platform above existing unlevel floor surface.; infill pour a new leveling slab; as per plans.; all work will be in full compliance with 780cmr 521cmr. No changes to egress no changes to life safety syst
Date:  November 21, 2014

Client: D.B.A: Facilities & Operations | Permit type: Other | Current use: Comm | Permit id: Alt415526 | Parcel: 401882000
2014/11/21096677 Huntington Av Boston Ma 02115Christopher Scarvalas
Replace existing elec. Fire pump with new pump to be of same size and rating of existing. Bfd paid detail; 1-officer &; 4-firefighters with pumper required ;
Date:  June 3, 2014

Permit status: Na | Permit id: Sprk359312 | Parcel: 0401882000
2014/06/03095677 Huntington Av Boston Ma 02115
The ground floor shall not be occupied during the sprinkler impairment. The heat detector shall be witness test by bfd prior to impairing the sprinkler system. Only one;zone shall be impaired at any given time.
Date:  January 22, 2015

Permit status: Na | Permit id: Sprk433277 | Parcel: 0401882000
2015/01/22095677 Huntington Av Boston Ma 02115
SCORE
82
Duct smoke detectors and dampers lower level notification devices 1st floor
Date:  February 6, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf437289 | Parcel: 0401882000
2015/02/06082677 Huntington Av Boston Ma 02115Erica Burgos J And M Brown Company
Relocate sprinkler heads to accommodate new wall and ceiling configuration 8th floor
Date:  October 4, 2010

Permit status: Na | Permit id: Sprk43433 | Parcel: 0401882000
2010/10/04095677 Huntington Av Boston Ma 02115
To conduct the following: erect temporary tents to be used for commencement activities at harvard school of public health total cubic feet of project: 269792 total number of people: 172-20x tent 1291 main tent bfd paid detail required
Date:  May 1, 2014

Permit status: Na | Permit id: Ta356837 | Parcel: 0401882000
2014/05/01095677 Huntington Av Boston Ma 02115
Harvard school of public health bfd paid detail required
Date:  July 31, 2014

Permit status: Na | Permit id: Cbw390142
2014/07/31095677 Huntington Av Boston Ma 02115
Installation of pane
Date:  October 8, 2014

Permit status: Na | Permit id: Chm410514 | Parcel: 0401882000
2014/10/08095677 Huntington Av Boston Ma 02115
Sprinkler system;shall be restored each day prior to the start of regular;office hours installation shall comply with the requirements of 7 cmr and nfpa 13.
Date:  January 30, 2015

Permit status: Na | Permit id: Sprk440152 | Parcel: 0401882000
2015/01/30095677 Huntington Av Boston Ma 02115
Installation of drap
Date:  June 15, 2015

Permit status: Na | Permit id: Chm481849 | Parcel: 0401882000
2015/06/15095677 Huntington Av Boston Ma 02115
Date:  May 21, 2013

Permit status: Na | Permit id: Ta244418 | Parcel: 0401882000
2013/05/21095677 Huntington Av Boston Ma 02115
Impair the floor sprinkler system during abatement work beginning on sunday 82414 between the hours of 18 - 0600.; work is expected to be completed on 93014 work to be done per nfpa stands one floor zone at a time. No occupancy in impaired zone. Follow harvard impairment letter dated aug. 19 2014.
Date:  August 22, 2014

Permit status: Na | Permit id: Sprk399726 | Parcel: 0401882000
2014/08/22095677 Huntington Av Boston Ma 02115
Cutting burning welding for installation of steel beams to support new concrete slab in existing building bfd paid detail required ; 1 ff required
Date:  October 30, 2014

Permit status: Na | Permit id: Cbw418800 | Parcel: 0401882000
2014/10/30095677 Huntington Av Boston Ma 02115
Coordinate impairment with building management so that no other zone is impaired within the building during this scheduled impairment.
Date:  May 14, 2015

Permit status: Na | Permit id: Sprk465696 | Parcel: 0401882000
2015/05/14095677 Huntington Av Boston Ma 02115
Welding for installation of steel support members (dpl) bfd paid detail required
Date:  August 26, 2010

Permit status: Na | Permit id: Cbw39924 | Parcel: 0401882000
2010/08/26095677 Huntington Av Boston Ma 02115
Relocate (10) sprinklers for new ceiling work 10th floor
Date:  September 7, 2010

Permit status: Na | Permit id: Sprk38613 | Parcel: 0401882000
2010/09/07095677 Huntington Av Boston Ma 02115
Only one;zone shall be impaired at any given time..... Coordinate impairment with building management
Date:  January 5, 2015

Permit status: Na | Permit id: Sprk433273 | Parcel: 0401882000
2015/01/05095677 Huntington Av Boston Ma 02115
Repair leak by replacing a shortsection of pipe ahead of fire pump bfd paid detail required
Date:  May 13, 2013

Permit status: Na | Permit id: Sprk238492
2013/05/13095677 Huntington Av Boston Ma 02115
Cutting / burning / welding of steel and copper piping to support the installation of hvac ahu equipment; (dpl) bfd paid detail required
Date:  October 1, 2015

Permit status: Na | Permit id: Cbw523438 | Parcel: 0401882000
2015/10/01095677 Huntington Av Boston Ma 02115
Date:  April 3, 2015

Permit status: Na | Permit id: Asb431915
2015/04/03095677 Huntington Av Boston Ma 02115
Removal of asbestos
Date:  March 19, 2013

Permit status: Na | Permit id: Asb227987
2013/03/19095677 Huntington Av Boston Ma 02115
Installation of pane
Date:  January 6, 2015

Permit status: Na | Permit id: Chm437865 | Parcel: 0401882000
2015/01/06095677 Huntington Av Boston Ma 02115
Date:  December 30, 2013

Permit status: Na | Permit id: Asb315916
2013/12/30095677 Huntington Av Boston Ma 02115
Pipe insulation and sheetrock and sealant
Date:  August 28, 2015

Permit status: Na | Permit id: Asb513898 | Parcel: 0401882000
2015/08/28095677 Huntington Av Boston Ma 02115
To remove asbestos from the 1st floor in building # 1
Date:  January 15, 2010

Permit status: Na | Permit id: Asb11324 | Parcel: 0401882000
2010/01/15095677 Huntington Av Boston Ma 02115
Installation of upho
Date:  June 25, 2012

Permit status: Na | Permit id: Chm156748 | Parcel: 0401882000
2012/06/25095677 Huntington Av Boston Ma 02115
To remove asbestos
Date:  November 29, 2010

Permit status: Na | Permit id: Asb53358 | Parcel: 0401882000
2010/11/29095677 Huntington Av Boston Ma 02115
Asbestos removal pipe insulation
Date:  November 12, 2013

Permit status: Na | Permit id: Asb303022
2013/11/12095677 Huntington Av Boston Ma 02115
To remove asbestos
Date:  March 15, 2012

Permit status: Na | Permit id: Asb125020 | Parcel: 0401882000
2012/03/15095677 Huntington Av Boston Ma 02115
Installation of inte
Date:  December 31, 2014

Permit status: Na | Permit id: Chm437018 | Parcel: 0401882000
2014/12/31095677 Huntington Av Boston Ma 02115
SCORE
63
Temporary bagging of smoke detectors
Date:  November 21, 2014

Permit status: Na | Permit id: Bsd427319 | Parcel: 0401882000
2014/11/21063677 Huntington Av Boston Ma 02115Matthew Consigli Constructions Co
General
Date:  May 21, 2012

Permit status: Expired | Permit id: Occu-143801 | Parcel: 0401882000
2012/05/21095677 Huntington Av Boston Ma 02115
Pipe insulation spray-on fireproofing and duct seam sealant
Date:  July 18, 2014

Permit status: Na | Permit id: Asb385270 | Parcel: 0401882000
2014/07/18095677 Huntington Av Boston Ma 02115
To remove asbestos from kresge building #3
Date:  February 11, 2011

Permit status: Na | Permit id: Asb63741 | Parcel: 0401882000
2011/02/11095677 Huntington Av Boston Ma 02115
Spray on fire proofing/ joint compound
Date:  June 10, 2015

Permit status: Na | Permit id: Asb481660 | Parcel: 0401882000
2015/06/10095677 Huntington Av Boston Ma 02115
Harvard school of public health- building 3-mechanical room/ 300lf of pipe insulation;&; 7 sq ft spray on fireproofing on the ceiling &; 1000sq ft debris on floor
Date:  June 13, 2014

Permit status: Na | Permit id: Asb373107 | Parcel: 0401882000
2014/06/13095677 Huntington Av Boston Ma 02115
Cutting &; welding of piping &; ductwork for to install replacement air handling unit (dpl); bfd paid detail required
Date:  July 15, 2014

Permit status: Na | Permit id: Cbw380016 | Parcel: 0401882000
2014/07/15095677 Huntington Av Boston Ma 02115
To remove asbestos from 677 huntington ave
Date:  March 15, 2011

Permit status: Na | Permit id: Asb67876 | Parcel: 0401882000
2011/03/15095677 Huntington Av Boston Ma 02115
000sf of walls and sheetrock
Date:  February 4, 2015

Permit status: Na | Permit id: Asb445735 | Parcel: 0401882000
2015/02/04095677 Huntington Av Boston Ma 02115
Certificate number expired on date of this permit 4/25/15. Harvard school of public health. Cleaning/disposal of asbestos containing debris from room 403 404 405 407 &; 408.
Date:  April 30, 2015

Permit status: Na | Permit id: Asb467571 | Parcel: 0401882000
2015/04/30095677 Huntington Av Boston Ma 02115
To remove asbestos from the 9th floor
Date:  August 10, 2010

Permit status: Na | Permit id: Asb37575 | Parcel: 0401882000
2010/08/10095677 Huntington Av Boston Ma 02115
Harvard university
Date:  March 25, 2014

Permit status: Na | Permit id: Asb346273 | Parcel: 0401882000
2014/03/25095677 Huntington Av Boston Ma 02115
Pipe insulation duct seal joint compound spray on fire proofing
Date:  May 18, 2015

Permit status: Na | Permit id: Asb473797 | Parcel: 0401882000
2015/05/18095677 Huntington Av Boston Ma 02115
Harvard school of public health (building 3). 500sq ft of debris(the floor) 2000sq ft of spray on fireproofing and 250lf of pipe insulation to be removed from auditorium basement under stairway
Date:  June 17, 2014

Permit status: Na | Permit id: Asb374371 | Parcel: 0401882000
2014/06/17095677 Huntington Av Boston Ma 02115
Sph3. Gypsum board
Date:  December 3, 2014

Permit status: Na | Permit id: Asb431678 | Parcel: 0401882000
2014/12/03095677 Huntington Av Boston Ma 02115
SCORE
94
Proposed work: installation of an inergen fire suppression system and a vesda smoke detection system. Last action: ready to issue
Date:  July 15, 2013
Contractor: Fire Equipment Inc

Permit type: From timematters-pz | Permit status: Expired | Current use: Comm | Permit id: Alt7778
2013/07/15094677 Huntington Av Boston Ma 02115Fire Equipment Inc
Welding only for removal/replacment of 2-corroded vent connections on the chilled water supply &; return piping mains bfd paid detail required
Date:  March 28, 2013

Permit status: Na | Permit id: Cbw229986
2013/03/28095677 Huntington Av Boston Ma 02115
Harvard school of public health
Date:  January 23, 2014

Permit status: Na | Permit id: Asb321235 | Parcel: 0401882000
2014/01/23095677 Huntington Av Boston Ma 02115
Asbestos removal spray-on fireproofing
Date:  November 12, 2013

Permit status: Na | Permit id: Asb303020
2013/11/12095677 Huntington Av Boston Ma 02115
Pipe insulation spray on fire proofing sheetrock ceiling tiles and sealant
Date:  June 24, 2015

Permit status: Na | Permit id: Asb487026 | Parcel: 0401882000
2015/06/24095677 Huntington Av Boston Ma 02115
Spray on fireproofing
Date:  September 1, 2015

Permit status: Na | Permit id: Asb515190 | Parcel: 0401882000
2015/09/01095677 Huntington Av Boston Ma 02115
Asbestos removal debries basement
Date:  November 12, 2013

Permit status: Na | Permit id: Asb303041
2013/11/12095677 Huntington Av Boston Ma 02115
Cutting / burning / welding for chilled water re-piping installation (dpl) bfd paid detail required
Date:  March 29, 2011

Permit status: Na | Permit id: Cbw68670 | Parcel: 0401882000
2011/03/29095677 Huntington Av Boston Ma 02115
Asbestos removalspray-on fire proofing and pipe insulation
Date:  November 12, 2013

Permit status: Na | Permit id: Asb303025
2013/11/12095677 Huntington Av Boston Ma 02115
Proposed work: installation of an inergen fire suppression system and a vesda smoke detection system. Last action: ready to issue
Date:  July 15, 2013

Permit type: From timematters-pz | Permit status: Expired | Current use: Comm | Permit id: Alt7778
2013/07/15095677 Huntington Av Boston Ma 02115
Welding for reconfiguration of kitchen exhaust duct in kitchen prep area bfd paid detail required
Date:  October 19, 2011

Permit status: Na | Permit id: Cbw100792 | Parcel: 0401882000
2011/10/19095677 Huntington Av Boston Ma 02115
Asbestos removal vermicolite
Date:  November 12, 2013

Permit status: Na | Permit id: Asb303015 | Parcel: 0401882000
2013/11/12095677 Huntington Av Boston Ma 02115
Welding of existing 2" steel pipe fuel lines;for installation of a new emergency generator bfd paid detail required
Date:  May 20, 2014

Permit status: Na | Permit id: Cbw361243 | Parcel: 0401882000
2014/05/20095677 Huntington Av Boston Ma 02115
Pipe insulation spray on fire proofing insulating cement transite panels and caulking
Date:  May 27, 2015

Permit status: Na | Permit id: Asb477050 | Parcel: 0401882000
2015/05/27095677 Huntington Av Boston Ma 02115
Date:  April 28, 2014

Permit status: Na | Permit id: Aspce356273 | Parcel: 0401882000
2014/04/28095677 Huntington Av Boston Ma 02115
Harvard school of public health. Joint compound and spray -on fireproofing.
Date:  July 18, 2014

Permit status: Na | Permit id: Asb385202 | Parcel: 0401882000
2014/07/18095677 Huntington Av Boston Ma 02115
To remove asbestos from the 1st floor
Date:  April 14, 2010

Permit status: Na | Permit id: Asb21721 | Parcel: 0401882000
2010/04/14095677 Huntington Av Boston Ma 02115
Monor select demo &; renovations to include drywall to buildout new kitchen offices &; computer classroom.
Date:  December 11, 2014

Permit status: Na | Permit id: Fdc433985 | Parcel: 0401882000
2014/12/11095677 Huntington Av Boston Ma 02115
Welding only of kitchen exhaust hood (dpl) bfd paid detail required
Date:  May 5, 2011

Permit status: Na | Permit id: Cbw75541 | Parcel: 0401882000
2011/05/05095677 Huntington Av Boston Ma 02115
Cutting / burning / welding of kitchen hood and exhaust hood and associated ductwork for re-configuration (dpl) bfd paid detail required
Date:  April 4, 2011

Permit status: Na | Permit id: Cbw70076 | Parcel: 0401882000
2011/04/04095677 Huntington Av Boston Ma 02115
Place of assembly for 7 persons as follows: set-up 1 - table &; chairs-74-persons; standing-636-persons; set-up 2- table &; chairs only-3 persons
Date:  November 13, 2012

Permit status: Na | Permit id: Tpla199844
2012/11/13095677 Huntington Av Boston Ma 02115
Replacement of five (5) existing signs with new signs.
Date:  April 21, 2015
Value:   $13,000

Permit type: Signs | Permit status: Expired | Current use: Comm | Permit id: Alt464100 | Parcel: 0401882000
2015/04/211300095677 Huntington Av Boston Ma 02115
Long form/alteration permit
Date:  April 21, 2015
Value:   $13,000

Permit type: Signs | Current use: Comm | Permit id: Alt464100
2015/04/211300095677 Huntington Av Boston Ma 02115
SCORE
100
Hsph - rm502 - lighting retrofit 59 light fixtures - led retrofits - ap 164089
Date:  December 27, 2016
Value:   $14,900
Contractor: Paul Guarracino

Client: Harvard College | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E668253 | Parcel: 0401882000
2016/12/2714900100677 Huntington Av Boston Ma 02115Paul Guarracino
Long form alteration permit
Date:  April 21, 2015
Value:   $13,000

Client: Harvard College | Permit type: Signs | Current use: Comm | Permit id: Alt464100
2015/04/211300095677 Huntington Av Boston Ma 02115
SCORE
88
Provide 1 amp panel for temporary power to tent. Install 8 exit signs. Install power for 4 air conditioners.
Date:  May 10, 2017
Value:   $1,500
Contractor: Paul F Dunphy Jr

Client: Harvard College | Permit type: Temporary service | Permit status: Open | Current use: Comm | Permit id: Ets705103 | Parcel: 0401882000
2017/05/10150088677 Huntington Av Boston Ma 02115Paul F Dunphy Jr
SCORE
95
Temporary power for lighting and sound under tent for graduation ceremony
Date:  May 15, 2017
Value:   $500
Contractor: Louis Pearson

Client: Harvard College | Permit type: Temporary service | Permit status: Open | Current use: Comm | Permit id: Ets708262 | Parcel: 0401882000
2017/05/1550095677 Huntington Av Boston Ma 02115Louis Pearson
SCORE
79
Annual electrical maintenance permit
Date:  June 7, 2017
Value:   $10,000

Client: Harvard College | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E715421 | Parcel: 0401882000
2017/06/071000079677 Huntington Av Boston Ma 02115Donald Fess Cfps Set
SCORE
99
Electrical permit
Date:  September 8, 2016
Value:   $30,000
Contractor: Angela Noenickx

Client: Harvard College | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E634801 | Parcel: 0401882000
2016/09/083000099677 Huntington Av Boston Ma 02115Angela Noenickx
SCORE
100
Hsph bldgs 1 3 and fxb misc. Low voltage hvac control wiring - pag 174390
Date:  March 22, 2017
Value:   $15,000
Contractor: Paul Guarracino

Client: Harvard College | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv689675 | Parcel: 0401882000
2017/03/2215000100677 Huntington Av Boston Ma 02115Paul Guarracino
SCORE
100
Electrical low voltage
Date:  August 17, 2010
Value:   $3,280

Client: D.B.A: Facilities & Operations | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv38589 | Parcel: 0401882000
2010/08/173280100677 Huntington Av Boston Ma 02115Advanced Information Technologies
SCORE
100
Electrical fire alarms
Date:  November 26, 2014
Value:   $6,000
Contractor: Karen Sykes

Client: D.B.A: Facilities & Operations | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa430313 | Parcel: 0401882000
2014/11/266000100677 Huntington Av Boston Ma 02115Karen Sykes
SCORE
100
Complete low voltage control wiring for 2 new fan coil units
Date:  September 20, 2016
Value:   $3,000
Contractor: William Pearson

Client: Harvard College | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv638158 | Parcel: 0401882000
2016/09/203000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Disconnect reconnect existing power to ac unit. New power feed for 2 water pumps - hsph ac1-18 - ap 163119
Date:  March 28, 2016
Value:   $12,500
Contractor: Paul Guarracino

Client: Harvard College | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E574887 | Parcel: 0401882000
2016/03/2812500100677 Huntington Av Boston Ma 02115Paul Guarracino
SCORE
100
Provide 1 amp panel for temporary power to tent. Install 8 exit signs and power for 4 air conditioners.
Date:  April 27, 2016
Value:   $1,500
Contractor: Paul Dunphy

Client: Harvard College | Permit type: Temporary service | Permit status: Expired | Current use: Comm | Permit id: Ets584380 | Parcel: 0401882000
2016/04/271500100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
100
Temporary cord connected power for lighting and receptacles under tent for commencement
Date:  May 20, 2016
Value:   $700
Contractor: William Pearson

Client: Harvard College | Permit type: Temporary service | Permit status: Expired | Current use: Other | Permit id: Ets592009 | Parcel: 0401882000
2016/05/20700100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Erect two (2) temporary tents 80x140 & 20x70 & four (4) canopies 9x20 9x30 9x40 & 14x54 in the countrway library courtyard of harvard school of public health to be used for commencement activities. Install saturday may 25 2013. Remove saturday june 1 2013.
Date:  May 15, 2013
Value:   $15,500
Contractor: Keith Wauters

Client: D.B.A: Facilities & Operations | Permit type: Canopy | Permit status: Expired | Current use: Other | Permit id: Sf238328 | Parcel: 0401882000
2013/05/1515500100677 Huntington Av Boston Ma 02115Keith Wauters
SCORE
100
Annual electrical maintenance
Date:  June 17, 2015
Value:   $5,000
Contractor: Paul Dunphy

Client: Harvard College | Permit type: Annual maintenance | Permit status: Expired | Current use: Comm | Permit id: E483892 | Parcel: 0401882000
2015/06/175000100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
100
Erect temporary tents 80x140 & 20x30 to be used for a vendor show on wednesday & thursday september 22nd & september 23rd 2010. Install sat sun 9 18 & 9 19 2010. Remove sat sun 9 25 & 9 26 2010. Occupancy 500
Date:  September 14, 2010
Value:   $10,525
Contractor: Keith Wauters

Client: D.B.A: Facilities & Operations | Permit type: Canopy | Permit status: Expired | Current use: Other | Permit id: Sf41682 | Parcel: 0401882000
2010/09/1410525100677 Huntington Av Boston Ma 02115Keith Wauters
SCORE
64
Perform work identified in drawings prepared by janovsky hurley architects dated 7/21/ sph-3 tenth floor relocate existing modular partitions install new partitions where indicated. Repair ceilings install flooring and paint where necessary. Reuse exisiting electric as is. Milwork and office furniture as per plan. All fire sprinkler electric plumbing and hvac to remain the same.
Date:  July 29, 2010
Value:   $125,400
Contractor: Robert H Bray

Client: D.B.A: Facilities & Operations | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf36090 | Parcel: 0401882000
2010/07/2912540064677 Huntington Av Boston Ma 02115Robert H Bray
SCORE
100
Renovation of 2nd floor classroom area
Date:  April 3, 2015
Value:   $35,000
Contractor: Joseph Mccluskey

Client: Harvard College | Permit type: Fire alarm | Permit status: Expired | Current use: Other | Permit id: Efa459446 | Parcel: 0401882000
2015/04/0335000100677 Huntington Av Boston Ma 02115Joseph Mccluskey
SCORE
100
Wire new controls for heating and cooling to include 4 reheat coils 4 thermostats and 4 vav boxes
Date:  October 5, 2015
Value:   $5,000
Contractor: William Pearson

Client: Harvard College | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv525424 | Parcel: 0401882000
2015/10/055000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
84
Fitout of imaging lab at harvard school of public health
Date:  July 15, 2016
Value:   $25,600
Contractor: Chris Oconnor

Client: Harvard College | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl611042 | Parcel: 0401882000
2016/07/152560084677 Huntington Av Boston Ma 02115Chris Oconnor
SCORE
100
Annual electrical maintenance permit
Date:  June 23, 2016
Value:   $5,000
Contractor: Paul Dunphy

Client: Harvard College | Permit type: Annual maintenance | Permit status: Expired | Current use: Comm | Permit id: E603918 | Parcel: 0401882000
2016/06/235000100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
100
Set up of temporary lights and power under tent for harvard commencement.
Date:  May 18, 2015
Value:   $500
Contractor: William Pearson

Client: Harvard College | Permit type: Temporary service | Permit status: Expired | Current use: Other | Permit id: Ets473703 | Parcel: 0401882000
2015/05/18500100677 Huntington Av Boston Ma 02115William Pearson
SCORE
74
Reroof; remove 2 layers of existing roofing and install new single-ply membrane.
Date:  September 9, 2010
Value:   $269,420

Client: D.B.A: Facilities & Operations | Permit type: Roofing | Current use: Comm | Permit id: Sf41720 | Parcel: 401882000
2010/09/0926942074677 Huntington Av Boston Ma 02115John P Mcanespie Iii
SCORE
100
Renovation of lower level @ ground level
Date:  November 26, 2014
Value:   $85,000
Contractor: Karen Sykes

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Current use: Comm | Permit id: E430311 | Parcel: 401882000
2014/11/2685000100677 Huntington Av Boston Ma 02115Karen Sykes
SCORE
100
Wire new low voltage controls for vav boxes with 8 thermostats
Date:  May 7, 2015
Value:   $7,000
Contractor: William Pearson

Client: Harvard College | Permit type: Low voltage | Permit status: Expired | Current use: Other | Permit id: Elv468208 | Parcel: 0401882000
2015/05/077000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Installation and maintenance of harvard university buildings.
Date:  June 24, 2010
Value:   $310
Contractor: Paul Dunphy

Client: D.B.A: Facilities & Operations | Permit type: Annual maintenance | Current use: Comm | Permit id: E31323 | Parcel: 401882000
2010/06/24310100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
100
Install two new 100 amp 3phase panels. Wire power and lighting for new conference room run conduits for av &; it reroute existing services in corridor.; demo offices &; conference rooms.
Date:  August 18, 2010
Value:   $10,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E38316 | Parcel: 0401882000
2010/08/1810000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
59
Perform demolition of non-structural partitions casework and disposal of all materials as detailed in drawings by janovsky hurley architects. Cslic# 84316 (781)-603-9046; bond bros. Is to file longform for renovation work.
Date:  December 29, 2009
Value:   $22,000
Contractor: Richard J Bradley

Client: D.B.A: Facilities & Operations | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf2781 | Parcel: 0401882000
2009/12/292200059677 Huntington Av Boston Ma 02115Richard J Bradley
SCORE
92
Office fitout of approx. 4 8 sf of shell space on the ground level including mep/fp/fa partitioms and finishes.
Date:  November 14, 2014
Value:   $200,000
Contractor: Michael Haynes

Client: Harvard College | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt420289 | Parcel: 0401882000
2014/11/1420000092677 Huntington Av Boston Ma 02115Michael Haynes
SCORE
100
Erect two (2) tents an 80x140 and a 20x70 and four (4)canopies a 9x20 9x30 a 9x40 and a 14 x 54 in the countway library courtyard of harvard school of public health to be used for commencement activities. Install saturday may 14 2011. Remove saturday may 28 2011.
Date:  May 9, 2011
Value:   $15,500
Contractor: Keith Wauters

Client: D.B.A: Facilities & Operations | Permit type: Canopy | Permit status: Expired | Current use: Other | Permit id: Sf74428 | Parcel: 0401882000
2011/05/0915500100677 Huntington Av Boston Ma 02115Keith Wauters
SCORE
66
Increase occupancy load from 200 persons to 710 persons. (in school cafeteria)
Date:  March 20, 2013
Contractor: James Devito

Client: D.B.A: Facilities & Operations | Permit type: Change occupancy | Permit status: Expired | Current use: Comm | Permit id: Alt223046 | Parcel: 0401882000
2013/03/20066677 Huntington Av Boston Ma 02115James Devito
SCORE
100
35032p harvard school of public health-kresge classrooms-renovation of existing building
Date:  April 13, 2015
Value:   $15,900
Contractor: John Shaughnessy

Client: Harvard College | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl461950 | Parcel: 0401882000
2015/04/1315900100677 Huntington Av Boston Ma 02115John Shaughnessy
SCORE
100
Run temporary 200 amp 3 phase feeder from building # 2 basement disconnect to building #1 basement disconnect .
Date:  July 25, 2014
Value:   $6,500
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Temporary service | Permit status: Expired | Current use: Comm | Permit id: Ets386987 | Parcel: 0401882000
2014/07/256500100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Erect an 80x140 tent and a 20x50 tent in the countway library courtyard of harvard school of public health to be used for commencement activities. Install saturday may 15 2010. Remove sunday may 30 2010.
Date:  May 10, 2010
Value:   $15,500
Contractor: Keith Wauters

Client: D.B.A: Facilities & Operations | Permit type: Canopy | Permit status: Expired | Current use: Other | Permit id: Sf23473 | Parcel: 0401882000
2010/05/1015500100677 Huntington Av Boston Ma 02115Keith Wauters
SCORE
100
8th floor telecommunications renovation work.
Date:  October 26, 2010
Value:   $3,900

Client: D.B.A: Facilities & Operations | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Elv48804 | Parcel: 401882000
2010/10/263900100677 Huntington Av Boston Ma 02115Advanced Information Technologies
SCORE
100
Demo existing power and lighting. Wire new power and lighting for new office space
Date:  September 27, 2010
Value:   $13,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: E44484 | Parcel: 401882000
2010/09/2713000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Replace 6 - 100 amp breaker panels in kind.
Date:  November 25, 2013
Value:   $5,000
Contractor: Paul Dunphy

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E307342 | Parcel: 0401882000
2013/11/255000100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
100
Annual electrical maintenance
Date:  May 20, 2011
Value:   $2,000
Contractor: Paul Dunphy

Client: D.B.A: Facilities & Operations | Permit type: Annual maintenance | Current use: Comm | Permit id: E77590 | Parcel: 401882000
2011/05/202000100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
100
Installation of temp lighting paddle fans and sound under large tent for commencement
Date:  May 3, 2013
Value:   $1,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Temporary change of use & occ | Current use: Comm | Permit id: Ets240878 | Parcel: 401882000
2013/05/031000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
95
Tie in temp. Lines from temp. Generator being brought to site for equipment change out being done by another electrical contractor
Date:  September 9, 2014
Value:   $2,000
Contractor: Louis Pearson

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Current use: Comm | Permit id: E405428 | Parcel: 401882000
2014/09/09200095677 Huntington Av Boston Ma 02115Louis Pearson
SCORE
100
Wire and install controls for 2 fan coil units and 12 vav boxes
Date:  January 9, 2015
Value:   $9,000
Contractor: William Pearson

Client: Harvard College | Permit type: Low voltage | Permit status: Expired | Current use: Other | Permit id: Elv439863 | Parcel: 0401882000
2015/01/099000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
68
Reconfiguration of existing walls. No fire no plumbing.
Date:  October 28, 2014
Value:   $12,000
Contractor: Robert Bray

Client: D.B.A: Facilities & Operations | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf419580 | Parcel: 401882000
2014/10/281200068677 Huntington Av Boston Ma 02115Robert Bray
SCORE
100
Provide 100 amp panel for temp power to tent. Install 8 exit signs. Install power for 4 air conditioners.
Date:  May 12, 2014
Value:   $2,500
Contractor: Paul Dunphy

Client: D.B.A: Facilities & Operations | Permit type: Temporary service | Permit status: Expired | Current use: Comm | Permit id: Ets359110 | Parcel: 0401882000
2014/05/122500100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
92
Remove and replace existing rubber roof.
Date:  November 4, 2011
Value:   $444,000
Contractor: Robin Stearns

Client: D.B.A: Facilities & Operations | Permit type: Roofing | Current use: Comm | Permit id: Sf104389 | Parcel: 401882000
2011/11/0444400092677 Huntington Av Boston Ma 02115Robin Stearns
SCORE
64
Relocate existing modular partitions repair ceilings install flooring paint where necessary and millwork office furniture as per plan.
Date:  June 21, 2010
Value:   $109,000
Contractor: Robert H Bray

Client: D.B.A: Facilities & Operations | Permit type: Renovations -interior nsc | Current use: Other | Permit id: Sf30586 | Parcel: 401882000
2010/06/2110900064677 Huntington Av Boston Ma 02115Robert H Bray
SCORE
68
Removal of existing walls and replacement with doors. No new fire plumbing or electrical. Repair ceiling.
Date:  August 13, 2012
Value:   $30,000
Contractor: Robert Bray

Client: D.B.A: Facilities & Operations | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf169518 | Parcel: 401882000
2012/08/133000068677 Huntington Av Boston Ma 02115Robert Bray
SCORE
100
Low voltage hvac control wiring ~ hsph ac1-18 ~ job #16-3188 (pag)
Date:  February 29, 2016
Value:   $20,000
Contractor: Paul Guarracino

Client: Harvard College | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv564917 | Parcel: 0401882000
2016/02/2920000100677 Huntington Av Boston Ma 02115Paul Guarracino
SCORE
100
Erect two (2) temporary tents 80x140 & 20x90 and four (4) canopies 9x20 9x30 9x40 & 14x54 in the countway library courtyard of harvard school of public health to be used for commencement activities. Install wednesday may 21 2014. Remove saturday may 31 2014.
Date:  April 28, 2014
Value:   $17,000
Contractor: Keith Wauters

Client: D.B.A: Facilities & Operations | Permit type: Canopy | Permit status: Expired | Current use: Other | Permit id: Sf353177 | Parcel: 0401882000
2014/04/2817000100677 Huntington Av Boston Ma 02115Keith Wauters
SCORE
100
Complete wiring of new valves damper actuators and sensors for bldg automation system in bld.-4(fxb).
Date:  February 20, 2013
Value:   $77,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Low voltage | Current use: Comm | Permit id: Elv218871 | Parcel: 401882000
2013/02/2077000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
93
Sediment carbon water filtration system
Date:  October 19, 2011
Value:   $500
Contractor: Mark St. Hilaire

Client: D.B.A: Facilities & Operations | Permit type: Plumbing | Current use: Comm | Permit id: Pl99880 | Parcel: 401882000
2011/10/1950093677 Huntington Av Boston Ma 02115Mark St. Hilaire
SCORE
100
34116p harvard school of health-kresge fit-out-renovation of existing building
Date:  December 3, 2014
Value:   $43,000
Contractor: John Shaughnessy

Client: D.B.A: Facilities & Operations | Permit type: Plumbing | Current use: Comm | Permit id: Pl431582 | Parcel: 401882000
2014/12/0343000100677 Huntington Av Boston Ma 02115John Shaughnessy
SCORE
100
Renovation of 2nd floor classroom area
Date:  April 3, 2015
Value:   $200,000
Contractor: Joseph Mccluskey

Client: Harvard College | Permit type: Electrical | Permit status: Expired | Current use: Other | Permit id: E459433 | Parcel: 0401882000
2015/04/03200000100677 Huntington Av Boston Ma 02115Joseph Mccluskey
SCORE
100
Install temporary cords to power lighting exit signs video and sound equipment under tent in courtyard for harvard school of public health commencement. All temporary wiring to be plug in with gfi protection .
Date:  May 22, 2014
Value:   $500
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Current use: Other | Permit id: Ets365687 | Parcel: 401882000
2014/05/22500100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Install temp power lighting and exit signs under tent for commencement
Date:  May 18, 2012
Value:   $700
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Current use: Other | Permit id: E143110 | Parcel: 401882000
2012/05/18700100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Install 2- new siemens control panels one panel located on 2nd floor and one located on 4th floor. Wire new thermostats heating valves cooling valves and tec controllers on 2nd and 4th floor .
Date:  July 2, 2014
Value:   $7,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Low voltage | Current use: Other | Permit id: Elv377355 | Parcel: 401882000
2014/07/027000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Misc renovation to existing building harvard chan
Date:  October 6, 2015
Value:   $7,500
Contractor: Francis Averill

Client: Harvard College | Permit type: Fire alarm | Permit status: Open | Current use: Comm | Permit id: Efa523253 | Parcel: 0401882000
2015/10/067500100677 Huntington Av Boston Ma 02115Francis Averill
SCORE
100
Annual electrical maintenance
Date:  August 11, 2014
Contractor: Paul Dunphy

Client: D.B.A: Facilities & Operations | Permit type: Annual maintenance | Current use: Comm | Permit id: E388771 | Parcel: 401882000
2014/08/110100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
100
Renovation to existing building.
Date:  October 6, 2015
Value:   $49,570
Contractor: Francis Averill

Client: Harvard College | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E523241 | Parcel: 0401882000
2015/10/0649570100677 Huntington Av Boston Ma 02115Francis Averill
SCORE
100
Annual electrical maintenance
Date:  June 26, 2013
Value:   $5,000
Contractor: Paul Dunphy

Client: D.B.A: Facilities & Operations | Permit type: Annual maintenance | Current use: Comm | Permit id: E258044 | Parcel: 401882000
2013/06/265000100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
88
Install a new 3000a service and a new 1000kw generator
Date:  October 30, 2013
Value:   $2,500,000
Contractor: Gregory Sapochetti

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Current use: Comm | Permit id: E299543 | Parcel: 401882000
2013/10/30250000088677 Huntington Av Boston Ma 02115Gregory Sapochetti
SCORE
87
Install 1 new water filtration on 1st floor.
Date:  February 17, 2010
Contractor: Michael Mccready

Client: D.B.A: Facilities & Operations | Permit type: Plumbing | Current use: Comm | Permit id: Pl14663 | Parcel: 401882000
2010/02/17087677 Huntington Av Boston Ma 02115Michael Mccready
SCORE
100
Connect 200amp feed to temporary panel for temporary lighting and sound in large tent for commencement. Install cord connected plug in exit signs with battery backup as required by building and fire departments for exits.
Date:  May 3, 2011
Value:   $2,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Temporary service | Current use: Comm | Permit id: Ets75074 | Parcel: 401882000
2011/05/032000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Temporary electrical service for outside commencement tent lighting
Date:  May 27, 2010
Value:   $5,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Current use: Other | Permit id: Ets27534 | Parcel: 401882000
2010/05/275000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Temporary wiring of supply fans pumps transformers and panels fed from emergency mcc that will be shutdown during transfer switch upgrade . Remove all temp wiring after upgrade completion .
Date:  July 2, 2014
Value:   $6,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Current use: Other | Permit id: Ets377338 | Parcel: 401882000
2014/07/026000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Complete wiring of new sensors valves and actuators for automation system in bdg-1
Date:  September 27, 2012
Value:   $79,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Low voltage | Current use: Comm | Permit id: Elv186856 | Parcel: 401882000
2012/09/2779000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Complete wire of new sensors and valves for bldg automation system in bldg #2
Date:  June 19, 2012
Value:   $75,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Low voltage | Current use: Comm | Permit id: Elv152602 | Parcel: 401882000
2012/06/1975000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Renovations to existing classroom on floor 2 harvard school of public health. Fast track- all work will be in full compliance with 780cmr 527cmr 521cmr. No changes to egress.
Date:  February 19, 2015
Value:   $1,150,000
Contractor: Jack Moriarty

Client: Harvard College | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt446312 | Parcel: 0401882000
2015/02/191150000100677 Huntington Av Boston Ma 02115Jack Moriarty
SCORE
100
Offices laboratory and school coo for classrooms (2nd floor) alt446312 issued 2/19/2015
Date:  January 29, 2016
Value:   $1,150,000
Contractor: Jack Moriarty

Client: Harvard College | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo555414 | Parcel: 0401882000
2016/01/291150000100677 Huntington Av Boston Ma 02115Jack Moriarty
SCORE
100
Provide 100 amd temp power to tent. Install 8 exit signs in tent.
Date:  April 25, 2013
Value:   $1,000
Contractor: Paul Dunphy

Client: D.B.A: Facilities & Operations | Permit type: Temporary service | Permit status: Expired | Current use: Comm | Permit id: Ets238486 | Parcel: 0401882000
2013/04/251000100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
100
Hsph - kresge - ac-2 replacement - new panel and new feeds ap 152679
Date:  November 2, 2015
Value:   $22,400
Contractor: Paul Guarracino

Client: Harvard College | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E533571 | Parcel: 0401882000
2015/11/0222400100677 Huntington Av Boston Ma 02115Paul Guarracino
SCORE
88
Offices laboratory and school certificate of; occupancy;for office;- ground level - only alt420289 issued 11/14/14
Date:  April 29, 2015
Value:   $200,000
Contractor: Sal Motta

Client: Harvard College | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo453458 | Parcel: 0401882000
2015/04/2920000088677 Huntington Av Boston Ma 02115Sal Motta
SCORE
100
Complete wiring of low voltage controls for 8 variable terminal boxes and 8 thermostats
Date:  September 22, 2015
Value:   $6,500
Contractor: William Pearson

Client: Harvard College | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Other | Permit id: Elv522047 | Parcel: 0401882000
2015/09/226500100677 Huntington Av Boston Ma 02115William Pearson
SCORE
89
Offices laboratory and school coo for computer room (l06) alt415526 issued: 11/21/2014
Date:  January 26, 2015
Contractor: Salvatore Motta

Client: Harvard College | Permit type: Other | Permit status: Expired | Current use: Comm | Permit id: Coo442158 | Parcel: 0401882000
2015/01/26089677 Huntington Av Boston Ma 02115Salvatore Motta
SCORE
100
Annual electrical maintenance
Date:  June 25, 2012
Value:   $5,000
Contractor: Paul Dunphy

Client: D.B.A: Facilities & Operations | Permit type: Annual maintenance | Current use: Comm | Permit id: E156110 | Parcel: 401882000
2012/06/255000100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
92
Harvard university - school of public health - kresge bldg - lower level -construct new steel platform above existing unlevel floor surface.; infill / pour a new leveling slab; as per plans.; all work will be in full compliance with 780cmr 521cmr. No changes to egress no changes to life safety systems. No changes to far.; modify existing mep / fa/ sprinklers; appl cost ?? Changed from sf400743.; already paid for sf application.
Date:  November 21, 2014
Contractor: Michael Haynes

Client: Harvard College | Permit type: Other | Permit status: Expired | Current use: Comm | Permit id: Alt415526 | Parcel: 0401882000
2014/11/21092677 Huntington Av Boston Ma 02115Michael Haynes
SCORE
100
Erect two (2) tents 80x140 & 20x70 & four (4) canopies a 9x20 a 9x30 a 9x40 & a 14x54 in the countway library courtyard of harvard school of public health to be used for commencement activities. Install saturday may 19 2012. Remove saturday may 26 2012.
Date:  April 30, 2012
Value:   $15,500
Contractor: Keith Wauters

Client: D.B.A: Facilities & Operations | Permit type: Other | Permit status: Expired | Current use: Other | Permit id: Sf134635 | Parcel: 0401882000
2012/04/3015500100677 Huntington Av Boston Ma 02115Keith Wauters
SCORE
100
Provide 1 amp panel for temporary power to tent. Install 8 exit signs. Install power for 4 air conditioners.
Date:  April 27, 2015
Value:   $2,000
Contractor: Paul Dunphy

Client: Harvard College | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: Ets465636 | Parcel: 0401882000
2015/04/272000100677 Huntington Av Boston Ma 02115Paul Dunphy
SCORE
96
Infill atrium floor as pre plans. All work will be in full compliance with 780cmr 521cmr. No changes to egress no changes to life safety systems. No changes to far. No mechanical plumbing hvac work.
Date:  August 26, 2014
Value:   $200,000

Client: D.B.A: Facilities & Operations | Permit type: Other | Current use: Comm | Permit id: Sf400743 | Parcel: 401882000
2014/08/2620000096677 Huntington Av Boston Ma 02115Christopher Scarvalas
SCORE
100
Remove 2962 existing light fixtures install 3642 new led fixtures in corridors offices and classrooms
Date:  April 4, 2011
Value:   $183,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Current use: Comm | Permit id: E70712 | Parcel: 401882000
2011/04/04183000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Upgrade existing 100 amp panel to new 225 amp panel. Pipe and wire new 125 amp sub panel. Pipe and wire 20 new recepticles. Wire new rtu and controls. Pipe and wire 40 freezer alarms. Wire new exhaust fan and control.
Date:  July 6, 2011
Value:   $35,000
Contractor: William Pearson

Client: D.B.A: Facilities & Operations | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E84498 | Parcel: 0401882000
2011/07/0635000100677 Huntington Av Boston Ma 02115William Pearson
SCORE
100
Complete wiring of building automation controls for new air handler 3-2
Date:  November 5, 2015
Value:   $7,700
Contractor: William Pearson

Client: Harvard College | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv536525 | Parcel: 0401882000
2015/11/057700100677 Huntington Av Boston Ma 02115William Pearson
Replace existing elec. Fire pump with new pump to be of same size and rating of existing. Bfd paid detail; 1-officer &; 4-firefighters with pumper required ;
Date:  June 3, 2014

Permit type: Bfd sprinkler system | Permit id: Sprk359312 | Parcel: 0401882000
2014/06/03095677 Huntington Av Boston Ma
The ground floor shall not be occupied during the sprinkler impairment. The heat detector shall be witness test by bfd prior to impairing the sprinkler system. Only one;zone shall be impaired at any given time.
Date:  January 22, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk433277 | Parcel: 0401882000
2015/01/22095677 Huntington Av Boston Ma
SCORE
100
1 st floor
Date:  November 26, 2014
Value:   $6,000
Contractor: Karen Sykes

Permit type: Electrical fire alarms | Expiration date: May 26, 2015 | Current use: Comm | Permit id: Efa430313 | Parcel: 0401882000
2014/11/266000100677 Huntington Av Boston MaKaren Sykes
SCORE
82
Duct smoke detectors and dampers lower level notification devices 1st floor
Date:  February 6, 2015

Permit type: Bfd fire alarm installations | Permit id: Bfdf437289 | Parcel: 0401882000
2015/02/06082677 Huntington Av Boston MaErica Burgos J And M Brown Company
Relocate sprinkler heads to accommodate new wall and ceiling configuration 8th floor
Date:  October 4, 2010

Permit type: Bfd sprinkler system | Permit id: Sprk43433 | Parcel: 0401882000
2010/10/04095677 Huntington Av Boston Ma
To conduct the following: erect temporary tents to be used for commencement activities at harvard school of public health total cubic feet of project: 269792 total number of people: 172-20x tent 1291 main tent bfd paid detail required
Date:  May 1, 2014

Permit type: Bfd tent with assembly | Permit id: Ta356837 | Parcel: 0401882000
2014/05/01095677 Huntington Av Boston Ma
SCORE
95
Tie in temp. Lines from temp. Generator being brought to site for equipment change out being done by another electrical contractor
Date:  September 9, 2014
Value:   $2,000
Contractor: Louis Pearson

Permit type: Electrical permit | Expiration date: March 9, 2015 | Current use: Comm | Permit id: E405428 | Parcel: 0401882000
2014/09/09200095677 Huntington Av Boston MaLouis Pearson
SCORE
100
Complete wiring of new sensors valves and actuators for automation system in bdg-1
Date:  September 27, 2012
Value:   $79,000
Contractor: William Pearson

Permit type: Electrical low voltage | Expiration date: March 27, 2013 | Current use: Comm | Permit id: Elv186856 | Parcel: 0401882000
2012/09/2779000100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
Install two new 1 amp 3phase panels. Wire power and lighting for new conference room run conduits for av &; it reroute existing services in corridor.; demo offices &; conference rooms.
Date:  August 18, 2010
Value:   $10,000
Contractor: William Pearson

Permit type: Electrical permit | Expiration date: February 18, 2011 | Current use: Comm | Permit id: E38316 | Parcel: 0401882000
2010/08/1810000100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
Low voltage wiring
Date:  August 17, 2010
Value:   $3,280

Permit type: Electrical low voltage | Expiration date: February 17, 2011 | Current use: Comm | Permit id: Elv38589 | Parcel: 0401882000
2010/08/173280100677 Huntington Av Boston MaAdvanced Information Technologies
SCORE
100
Complete wire of new sensors and valves for bldg automation system in bldg #2
Date:  June 19, 2012
Value:   $75,000
Contractor: William Pearson

Permit type: Electrical low voltage | Expiration date: December 19, 2012 | Current use: Comm | Permit id: Elv152602 | Parcel: 0401882000
2012/06/1975000100677 Huntington Av Boston MaWilliam Pearson
Harvard school of public health bfd paid detail required
Date:  July 31, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw390142
2014/07/31095677 Huntington Av Boston Ma
Bfd chemist certificate proces
Date:  October 8, 2014

Permit id: Chm410514 | Parcel: 0401882000
2014/10/08095677 Huntington Av Boston Ma
SCORE
100
Complete wiring of new valves damper actuators and sensors for bldg automation system in bld.-4(fxb).
Date:  February 20, 2013
Value:   $77,000
Contractor: William Pearson

Permit type: Electrical low voltage | Expiration date: August 20, 2013 | Current use: Comm | Permit id: Elv218871 | Parcel: 0401882000
2013/02/2077000100677 Huntington Av Boston MaWilliam Pearson
Sprinkler system;shall be restored each day prior to the start of regular;office hours installation shall comply with the requirements of 7 cmr and nfpa 13.
Date:  January 30, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk440152 | Parcel: 0401882000
2015/01/30095677 Huntington Av Boston Ma
SCORE
100
Run temporary 2 amp 3 phase feeder from building # 2 basement disconnect to building #1 basement disconnect .
Date:  July 25, 2014
Value:   $6,500
Contractor: William Pearson

Permit type: Electrical temporary service | Expiration date: January 25, 2015 | Current use: Comm | Permit id: Ets386987 | Parcel: 0401882000
2014/07/256500100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
Install 2- new siemens control panels one panel located on 2nd floor and one located on 4th floor. Wire new thermostats heating valves cooling valves and tec controllers on 2nd and 4th floor .
Date:  July 2, 2014
Value:   $7,000
Contractor: William Pearson

Permit type: Electrical low voltage | Expiration date: January 2, 2015 | Current use: Other | Permit id: Elv377355 | Parcel: 0401882000
2014/07/027000100677 Huntington Av Boston MaWilliam Pearson
Replacement of five (5) existing signs with new signs.
Date:  April 21, 2015
Value:   $13,000

Permit type: Long form/alteration permit | Expiration date: October 21, 2015 | Current use: Comm | Permit id: Alt464100 | Parcel: 0401882000
2015/04/211300095677 Huntington Av Boston Ma
Bfd chemist certificate proces
Date:  October 21, 2015

Permit id: Chm530160 | Parcel: 0401882000
2015/10/21095677 Huntington Av Boston Ma
SCORE
100
Modification of existing fa system due to renovations
Date:  October 26, 2015
Contractor: Joseph Mccluskey

Permit type: Bfd fire alarm installations | Permit id: Bfdf479853
2015/10/260100677 Huntington Av Boston MaJoseph Mccluskey
SCORE
100
Provide 1 amp panel for temporary power to tent. Install 8 exit signs. Install power for 4 air conditioners.
Date:  April 27, 2015
Value:   $2,000
Contractor: Paul Dunphy

Permit type: Electrical temporary service | Expiration date: October 27, 2015 | Current use: Comm | Permit id: Ets465636 | Parcel: 0401882000
2015/04/272000100677 Huntington Av Boston MaPaul Dunphy
SCORE
100
34116p harvard school of health-kresge fit-out-renovation of existing building
Date:  December 3, 2014
Value:   $43,000
Contractor: John Shaughnessy

Permit type: Plumbing permit | Expiration date: June 3, 2015 | Current use: Comm | Permit id: Pl431582 | Parcel: 0401882000
2014/12/0343000100677 Huntington Av Boston MaJohn Shaughnessy
SCORE
100
35032p harvard school of public health-kresge classrooms-renovation of existing building
Date:  April 13, 2015
Value:   $15,900
Contractor: John Shaughnessy

Permit type: Plumbing permit | Expiration date: October 13, 2015 | Current use: Comm | Permit id: Pl461950 | Parcel: 0401882000
2015/04/1315900100677 Huntington Av Boston MaJohn Shaughnessy
SCORE
100
Hsph - kresge - ac-2 replacement - new panel and new feeds ap 152679
Date:  November 2, 2015
Value:   $22,400
Contractor: Paul Guarracino

Permit type: Electrical permit | Expiration date: May 2, 2016 | Current use: Comm | Permit id: E533571 | Parcel: 0401882000
2015/11/0222400100677 Huntington Av Boston MaPaul Guarracino
SCORE
100
Complete wiring of building automation controls for new air handler 3-2
Date:  November 5, 2015
Value:   $7,700
Contractor: William Pearson

Permit type: Electrical low voltage | Expiration date: May 5, 2016 | Current use: Comm | Permit id: Elv536525 | Parcel: 0401882000
2015/11/057700100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
Wire new low voltage controls for vav boxes with 8 thermostats
Date:  May 7, 2015
Value:   $7,000
Contractor: William Pearson

Permit type: Electrical low voltage | Expiration date: November 7, 2015 | Current use: Other | Permit id: Elv468208 | Parcel: 0401882000
2015/05/077000100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
Set up of temporary lights and power under tent for harvard commencement.
Date:  May 18, 2015
Value:   $500
Contractor: William Pearson

Permit type: Electrical temporary service | Expiration date: November 18, 2015 | Current use: Other | Permit id: Ets473703 | Parcel: 0401882000
2015/05/18500100677 Huntington Av Boston MaWilliam Pearson
Welding for installation of new metal fence functioning as guardrail to accommodate replacement of existing aluminum guardrails also replace casters on planters for repairs to metal stairs
Date:  November 20, 2015

Permit type: Bfd cutting-burning-welding | Permit id: Cbw539589 | Parcel: 0401882000
2015/11/20095677 Huntington Av Boston Ma
SCORE
100
Annual electrical maintenance
Date:  June 17, 2015
Value:   $5,000
Contractor: Paul Dunphy

Permit type: Electrical permit | Expiration date: December 17, 2015 | Current use: Comm | Permit id: E483892 | Parcel: 0401882000
2015/06/175000100677 Huntington Av Boston MaPaul Dunphy
Bfd chemist certificate proces
Date:  June 15, 2015

Permit id: Chm481849 | Parcel: 0401882000
2015/06/15095677 Huntington Av Boston Ma
SCORE
100
Upgrade existing 1 amp panel to new 225 amp panel. Pipe and wire new 125 amp sub panel. Pipe and wire new recepticles. Wire new rtu and controls. Pipe and wire freezer alarms. Wire new exhaust fan and control.
Date:  July 6, 2011
Value:   $35,000
Contractor: William Pearson

Permit type: Electrical permit | Expiration date: January 6, 2012 | Current use: Comm | Permit id: E84498 | Parcel: 0401882000
2011/07/0635000100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
8th floor telecommunications renovation work.
Date:  October 26, 2010
Value:   $3,900

Permit type: Electrical low voltage | Expiration date: April 26, 2011 | Current use: Comm | Permit id: Elv48804 | Parcel: 0401882000
2010/10/263900100677 Huntington Av Boston MaAdvanced Information Technologies
Bfd tent with assembly
Date:  May 21, 2013

Permit id: Ta244418 | Parcel: 0401882000
2013/05/21095677 Huntington Av Boston Ma
Impair the floor sprinkler system during abatement work beginning on sunday 8/24/14 between the hours of 18 - 0600.; work is expected to be completed on 9/30/14 work to be done per nfpa stands one floor zone at a time. No occupancy in impaired zone. Follow harvard impairment letter dated aug. 19 2014.
Date:  August 22, 2014

Permit type: Bfd sprinkler system | Permit id: Sprk399726 | Parcel: 0401882000
2014/08/22095677 Huntington Av Boston Ma
Cutting / burning / welding for installation of steel beams to support new concrete slab in existing building bfd paid detail required ; 1 ff required
Date:  October 30, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw418800 | Parcel: 0401882000
2014/10/30095677 Huntington Av Boston Ma
SCORE
92
Remove and replace existing rubber roof.
Date:  November 4, 2011
Value:   $444,000
Contractor: Robin Stearns

Permit type: Short form bldg permit | Expiration date: May 4, 2012 | Current use: Comm | Permit id: Sf104389 | Parcel: 0401882000
2011/11/0444400092677 Huntington Av Boston MaRobin Stearns
Coordinate impairment with building management so that no other zone is impaired within the building during this scheduled impairment.
Date:  May 14, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk465696 | Parcel: 0401882000
2015/05/14095677 Huntington Av Boston Ma
Welding for installation of steel support members (dpl) bfd paid detail required
Date:  August 26, 2010

Permit type: Bfd cutting-burning-welding | Permit id: Cbw39924 | Parcel: 0401882000
2010/08/26095677 Huntington Av Boston Ma
Relocate (10) sprinklers for new ceiling work 10th floor
Date:  September 7, 2010

Permit type: Bfd sprinkler system | Permit id: Sprk38613 | Parcel: 0401882000
2010/09/07095677 Huntington Av Boston Ma
Only one;zone shall be impaired at any given time..... Coordinate impairment with building management
Date:  January 5, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk433273 | Parcel: 0401882000
2015/01/05095677 Huntington Av Boston Ma
Repair leak by replacing a shortsection of pipe ahead of fire pump bfd paid detail required
Date:  May 13, 2013

Permit type: Bfd sprinkler system | Permit id: Sprk238492
2013/05/13095677 Huntington Av Boston Ma
SCORE
100
Complete wiring of low voltage controls for 8 variable terminal boxes and 8 thermostats
Date:  September 22, 2015
Value:   $6,500
Contractor: William Pearson

Permit type: Electrical low voltage | Expiration date: March 22, 2016 | Current use: Other | Permit id: Elv522047 | Parcel: 0401882000
2015/09/226500100677 Huntington Av Boston MaWilliam Pearson
Cutting / burning / welding of steel and copper piping to support the installation of hvac ahu equipment; (dpl) bfd paid detail required
Date:  October 1, 2015

Permit type: Bfd cutting-burning-welding | Permit id: Cbw523438 | Parcel: 0401882000
2015/10/01095677 Huntington Av Boston Ma
SCORE
68
Removal of existing walls and replacement with doors. No new fire plumbing or electrical. Repair ceiling.
Date:  August 13, 2012
Value:   $30,000
Contractor: Robert Bray

Permit type: Short form bldg permit | Expiration date: February 13, 2013 | Current use: Comm | Permit id: Sf169518 | Parcel: 0401882000
2012/08/133000068677 Huntington Av Boston MaRobert Bray
Bfd asbestos removal
Date:  April 3, 2015

Permit id: Asb431915
2015/04/03095677 Huntington Av Boston Ma
SCORE
93
Sediment carbon water filtration system
Date:  October 19, 2011
Value:   $500
Contractor: Mark St. Hilaire

Permit type: Plumbing permit | Expiration date: April 19, 2012 | Current use: Comm | Permit id: Pl99880 | Parcel: 0401882000
2011/10/1950093677 Huntington Av Boston MaMark St. Hilaire
Removal of asbestos
Date:  March 19, 2013

Permit type: Bfd asbestos removal | Permit id: Asb227987
2013/03/19095677 Huntington Av Boston Ma
SCORE
100
Temporary wiring of supply fans pumps transformers and panels fed from emergency mcc that will be shutdown during transfer switch upgrade . Remove all temp wiring after upgrade completion .
Date:  July 2, 2014
Value:   $6,000
Contractor: William Pearson

Permit type: Electrical temporary service | Expiration date: January 2, 2015 | Current use: Other | Permit id: Ets377338 | Parcel: 0401882000
2014/07/026000100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
Install temp power lighting and exit signs under tent for commencement
Date:  May 18, 2012
Value:   $700
Contractor: William Pearson

Permit type: Electrical permit | Expiration date: November 18, 2012 | Current use: Other | Permit id: E143110 | Parcel: 0401882000
2012/05/18700100677 Huntington Av Boston MaWilliam Pearson
Bfd asbestos removal
Date:  December 30, 2013

Permit id: Asb315916
2013/12/30095677 Huntington Av Boston Ma
SCORE
100
Erect an 80x1 tent and a 20x tent in the countway library courtyard of harvard school of public health to be used for commencement activities. Install saturday may 15 2010. Remove sunday may 2010.
Date:  May 10, 2010
Value:   $15,500
Contractor: Keith Wauters

Permit type: Short form bldg permit | Expiration date: November 10, 2010 | Current use: Other | Permit id: Sf23473 | Parcel: 0401882000
2010/05/1015500100677 Huntington Av Boston MaKeith Wauters
Pipe insulation and sheetrock and sealant
Date:  August 28, 2015

Permit type: Bfd asbestos removal | Permit id: Asb513898 | Parcel: 0401882000
2015/08/28095677 Huntington Av Boston Ma
To remove asbestos from the 1st floor in building # 1
Date:  January 15, 2010

Permit type: Bfd asbestos removal | Permit id: Asb11324 | Parcel: 0401882000
2010/01/15095677 Huntington Av Boston Ma
Bfd chemist certificate proces
Date:  June 25, 2012

Permit id: Chm156748 | Parcel: 0401882000
2012/06/25095677 Huntington Av Boston Ma
To remove asbestos
Date:  November 29, 2010

Permit type: Bfd asbestos removal | Permit id: Asb53358 | Parcel: 0401882000
2010/11/29095677 Huntington Av Boston Ma
SCORE
100
Installation of temp lighting paddle fans and sound under large tent for commencement
Date:  May 3, 2013
Value:   $1,000
Contractor: William Pearson

Permit type: Electrical temporary service | Expiration date: November 3, 2013 | Current use: Comm | Permit id: Ets240878 | Parcel: 0401882000
2013/05/031000100677 Huntington Av Boston MaWilliam Pearson
Asbestos removal pipe insulation
Date:  November 12, 2013

Permit type: Bfd asbestos removal | Permit id: Asb303022
2013/11/12095677 Huntington Av Boston Ma
To remove asbestos
Date:  March 15, 2012

Permit type: Bfd asbestos removal | Permit id: Asb125020 | Parcel: 0401882000
2012/03/15095677 Huntington Av Boston Ma
Bfd chemist certificate proces
Date:  December 31, 2014

Permit id: Chm437018 | Parcel: 0401882000
2014/12/31095677 Huntington Av Boston Ma
SCORE
100
Temporary electrical service for outside commencement tent lighting
Date:  May 27, 2010
Value:   $5,000
Contractor: William Pearson

Permit type: Electrical temporary service | Expiration date: November 27, 2010 | Current use: Other | Permit id: Ets27534 | Parcel: 0401882000
2010/05/275000100677 Huntington Av Boston MaWilliam Pearson
SCORE
63
Temporary bagging of smoke detectors
Date:  November 21, 2014

Permit type: Bfd bag smoke detectors | Permit id: Bsd427319 | Parcel: 0401882000
2014/11/21063677 Huntington Av Boston MaMatthew Consigli Constructions Co
Street occupancy permit
Date:  May 21, 2012

Expiration date: January 13, 2013 | Permit id: Occu-143801 | Parcel: 0401882000
2012/05/21095677 Huntington Av Boston Ma
Pipe insulation spray-on fireproofing and duct seam sealant
Date:  July 18, 2014

Permit type: Bfd asbestos removal | Permit id: Asb385270 | Parcel: 0401882000
2014/07/18095677 Huntington Av Boston Ma
To remove asbestos from kresge building #3
Date:  February 11, 2011

Permit type: Bfd asbestos removal | Permit id: Asb63741 | Parcel: 0401882000
2011/02/11095677 Huntington Av Boston Ma
Spray on fire proofing/ joint compound
Date:  June 10, 2015

Permit type: Bfd asbestos removal | Permit id: Asb481660 | Parcel: 0401882000
2015/06/10095677 Huntington Av Boston Ma
Harvard school of public health- building 3-mechanical room/ 300lf of pipe insulation;&; 7 sq ft spray on fireproofing on the ceiling &; 1000sq ft debris on floor
Date:  June 13, 2014

Permit type: Bfd asbestos removal | Permit id: Asb373107 | Parcel: 0401882000
2014/06/13095677 Huntington Av Boston Ma
SCORE
100
Remove 2962 existing light fixtures install 3642 new led fixtures in corridors offices and classrooms
Date:  April 4, 2011
Value:   $183,000
Contractor: William Pearson

Permit type: Electrical permit | Expiration date: October 4, 2011 | Current use: Comm | Permit id: E70712 | Parcel: 0401882000
2011/04/04183000100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
Erect two (2) tents an 80x1 and a 20x and four (4)canopies a 9x 9x a 9x and a 14 x 54 in the countway library courtyard of harvard school of public health to be used for commencement activities. Install saturday may 14 2011. Remove saturday may 28 2011.
Date:  May 9, 2011
Value:   $15,500
Contractor: Keith Wauters

Permit type: Short form bldg permit | Expiration date: November 9, 2011 | Current use: Other | Permit id: Sf74428 | Parcel: 0401882000
2011/05/0915500100677 Huntington Av Boston MaKeith Wauters
Cutting &; welding of piping &; ductwork for to install replacement air handling unit (dpl); bfd paid detail required
Date:  July 15, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw380016 | Parcel: 0401882000
2014/07/15095677 Huntington Av Boston Ma
To remove asbestos from 677 huntington ave
Date:  March 15, 2011

Permit type: Bfd asbestos removal | Permit id: Asb67876 | Parcel: 0401882000
2011/03/15095677 Huntington Av Boston Ma
SCORE
100
Installation and maintenance of harvard university buildings.
Date:  June 24, 2010
Value:   $310
Contractor: Paul Dunphy

Permit type: Electrical permit | Expiration date: December 24, 2010 | Current use: Comm | Permit id: E31323 | Parcel: 0401882000
2010/06/24310100677 Huntington Av Boston MaPaul Dunphy
000sf of walls and sheetrock
Date:  February 4, 2015

Permit type: Bfd asbestos removal | Permit id: Asb445735 | Parcel: 0401882000
2015/02/04095677 Huntington Av Boston Ma
Certificate number expired on date of this permit 4/25/15. Harvard school of public health. Cleaning/disposal of asbestos containing debris from room 403 404 405 407 &; 408.
Date:  April 30, 2015

Permit type: Bfd asbestos removal | Permit id: Asb467571 | Parcel: 0401882000
2015/04/30095677 Huntington Av Boston Ma
To remove asbestos from the 9th floor
Date:  August 10, 2010

Permit type: Bfd asbestos removal | Permit id: Asb37575 | Parcel: 0401882000
2010/08/10095677 Huntington Av Boston Ma
Harvard university
Date:  March 25, 2014

Permit type: Bfd asbestos removal | Permit id: Asb346273 | Parcel: 0401882000
2014/03/25095677 Huntington Av Boston Ma
SCORE
100
Renovations to existing classroom on floor 2 harvard school of public health. Fast track- all work will be in full compliance with 780cmr 527cmr 521cmr. No changes to egress.
Date:  February 19, 2015
Value:   $1,150,000
Contractor: Jack Moriarty

Permit type: Long form/alteration permit | Expiration date: August 19, 2015 | Current use: Comm | Permit id: Alt446312 | Parcel: 0401882000
2015/02/191150000100677 Huntington Av Boston MaJack Moriarty
SCORE
100
Wire new controls for heating and cooling to include 4 reheat coils 4 thermostats and 4 vav boxes
Date:  October 5, 2015
Value:   $5,000
Contractor: William Pearson

Permit type: Electrical low voltage | Expiration date: April 5, 2016 | Current use: Comm | Permit id: Elv525424 | Parcel: 0401882000
2015/10/055000100677 Huntington Av Boston MaWilliam Pearson
Pipe insulation duct seal joint compound spray on fire proofing
Date:  May 18, 2015

Permit type: Bfd asbestos removal | Permit id: Asb473797 | Parcel: 0401882000
2015/05/18095677 Huntington Av Boston Ma
SCORE
100
Erect two (2) temporary tents 80x1 & 20x & four (4) canopies 9x 9x 9x & 14x54 in the countrway library courtyard of harvard school of public health to be used for commencement activities. Install saturday may 25 2013. Remove saturday june 1 2013.
Date:  May 15, 2013
Value:   $15,500
Contractor: Keith Wauters

Permit type: Short form bldg permit | Expiration date: November 15, 2013 | Current use: Other | Permit id: Sf238328 | Parcel: 0401882000
2013/05/1515500100677 Huntington Av Boston MaKeith Wauters
Harvard school of public health (building 3). 500sq ft of debris(the floor) 2000sq ft of spray on fireproofing and 250lf of pipe insulation to be removed from auditorium basement under stairway
Date:  June 17, 2014

Permit type: Bfd asbestos removal | Permit id: Asb374371 | Parcel: 0401882000
2014/06/17095677 Huntington Av Boston Ma
SCORE
100
Replace 6 - 1 amp breaker panels in kind.
Date:  November 25, 2013
Value:   $5,000
Contractor: Paul Dunphy

Permit type: Electrical permit | Expiration date: May 25, 2014 | Current use: Comm | Permit id: E307342 | Parcel: 0401882000
2013/11/255000100677 Huntington Av Boston MaPaul Dunphy
SCORE
100
Install temporary cords to power lighting exit signs video and sound equipment under tent in courtyard for harvard school of public health commencement. All temporary wiring to be plug in with gfi protection .
Date:  May 22, 2014
Value:   $500
Contractor: William Pearson

Permit type: Electrical temporary service | Expiration date: November 22, 2014 | Current use: Other | Permit id: Ets365687 | Parcel: 0401882000
2014/05/22500100677 Huntington Av Boston MaWilliam Pearson
Sph3. Gypsum board
Date:  December 3, 2014

Permit type: Bfd asbestos removal | Permit id: Asb431678 | Parcel: 0401882000
2014/12/03095677 Huntington Av Boston Ma
SCORE
94
Proposed work: installation of an inergen fire suppression system and a vesda smoke detection system. Last action: ready to issue
Date:  July 15, 2013
Contractor: Fire Equipment Inc

Permit type: Long form/alteration permit | Expiration date: January 15, 2014 | Current use: Comm | Permit id: Alt7778
2013/07/15094677 Huntington Av Boston MaFire Equipment Inc
Welding only for removal/replacment of 2-corroded vent connections on the chilled water supply &; return piping mains bfd paid detail required
Date:  March 28, 2013

Permit type: Bfd cutting-burning-welding | Permit id: Cbw229986
2013/03/28095677 Huntington Av Boston Ma
SCORE
87
Install 1 new water filtration on 1st floor.
Date:  February 17, 2010
Contractor: Michael Mccready

Permit type: Plumbing permit | Expiration date: August 17, 2010 | Current use: Comm | Permit id: Pl14663 | Parcel: 0401882000
2010/02/17087677 Huntington Av Boston MaMichael Mccready
Harvard school of public health
Date:  January 23, 2014

Permit type: Bfd asbestos removal | Permit id: Asb321235 | Parcel: 0401882000
2014/01/23095677 Huntington Av Boston Ma
SCORE
100
Renovation of 2nd floor classroom area
Date:  April 3, 2015
Value:   $200,000
Contractor: Joseph Mccluskey

Permit type: Electrical permit | Expiration date: October 3, 2015 | Current use: Other | Permit id: E459433 | Parcel: 0401882000
2015/04/03200000100677 Huntington Av Boston MaJoseph Mccluskey
Asbestos removal spray-on fireproofing
Date:  November 12, 2013

Permit type: Bfd asbestos removal | Permit id: Asb303020
2013/11/12095677 Huntington Av Boston Ma
SCORE
100
Annual electrical maintenance
Date:  June 26, 2013
Value:   $5,000
Contractor: Paul Dunphy

Permit type: Electrical permit | Expiration date: December 26, 2013 | Current use: Comm | Permit id: E258044 | Parcel: 0401882000
2013/06/265000100677 Huntington Av Boston MaPaul Dunphy
Pipe insulation spray on fire proofing sheetrock ceiling tiles and sealant
Date:  June 24, 2015

Permit type: Bfd asbestos removal | Permit id: Asb487026 | Parcel: 0401882000
2015/06/24095677 Huntington Av Boston Ma
SCORE
100
Annual electrical maintenance
Date:  August 11, 2014
Contractor: Paul Dunphy

Permit type: Electrical permit | Expiration date: February 11, 2015 | Current use: Comm | Permit id: E388771 | Parcel: 0401882000
2014/08/110100677 Huntington Av Boston MaPaul Dunphy
Spray on fireproofing
Date:  September 1, 2015

Permit type: Bfd asbestos removal | Permit id: Asb515190 | Parcel: 0401882000
2015/09/01095677 Huntington Av Boston Ma
Asbestos removal debries basement
Date:  November 12, 2013

Permit type: Bfd asbestos removal | Permit id: Asb303041
2013/11/12095677 Huntington Av Boston Ma
Cutting / burning / welding for chilled water re-piping installation (dpl) bfd paid detail required
Date:  March 29, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw68670 | Parcel: 0401882000
2011/03/29095677 Huntington Av Boston Ma
SCORE
100
Annual electrical maintenance
Date:  June 25, 2012
Value:   $5,000
Contractor: Paul Dunphy

Permit type: Electrical permit | Expiration date: December 25, 2012 | Current use: Comm | Permit id: E156110 | Parcel: 0401882000
2012/06/255000100677 Huntington Av Boston MaPaul Dunphy
SCORE
100
Provide 1 amd temp power to tent. Install 8 exit signs in tent.
Date:  April 25, 2013
Value:   $1,000
Contractor: Paul Dunphy

Permit type: Electrical temporary service | Expiration date: October 25, 2013 | Current use: Comm | Permit id: Ets238486 | Parcel: 0401882000
2013/04/251000100677 Huntington Av Boston MaPaul Dunphy
Asbestos removalspray-on fire proofing and pipe insulation
Date:  November 12, 2013

Permit type: Bfd asbestos removal | Permit id: Asb303025
2013/11/12095677 Huntington Av Boston Ma
SCORE
66
Increase occupancy load from 2 persons to 7 persons. (in school cafeteria)
Date:  March 20, 2013
Contractor: James Devito

Permit type: Long form/alteration permit | Expiration date: September 20, 2013 | Current use: Comm | Permit id: Alt223046 | Parcel: 0401882000
2013/03/20066677 Huntington Av Boston MaJames Devito
SCORE
100
Connect 200amp feed to temporary panel for temporary lighting and sound in large tent for commencement. Install cord connected plug in exit signs with battery backup as required by building and fire departments for exits.
Date:  May 3, 2011
Value:   $2,000
Contractor: William Pearson

Permit type: Electrical temporary service | Expiration date: November 3, 2011 | Current use: Comm | Permit id: Ets75074 | Parcel: 0401882000
2011/05/032000100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
Erect two (2) tents 80x1 & 20x & four (4) canopies a 9x a 9x a 9x & a 14x54 in the countway library courtyard of harvard school of public health to be used for commencement activities. Install saturday may 19 2012. Remove saturday may 26 2012.
Date:  April 30, 2012
Value:   $15,500
Contractor: Keith Wauters

Permit type: Short form bldg permit | Expiration date: October 30, 2012 | Current use: Other | Permit id: Sf134635 | Parcel: 0401882000
2012/04/3015500100677 Huntington Av Boston MaKeith Wauters
SCORE
100
Provide 1 amp panel for temp power to tent. Install 8 exit signs. Install power for 4 air conditioners.
Date:  May 12, 2014
Value:   $2,500
Contractor: Paul Dunphy

Permit type: Electrical temporary service | Expiration date: November 12, 2014 | Current use: Comm | Permit id: Ets359110 | Parcel: 0401882000
2014/05/122500100677 Huntington Av Boston MaPaul Dunphy
SCORE
74
Reroof; remove 2 layers of existing roofing and install new single-ply membrane.
Date:  September 9, 2010
Value:   $269,420

Permit type: Short form bldg permit | Expiration date: March 9, 2011 | Current use: Comm | Permit id: Sf41720 | Parcel: 0401882000
2010/09/0926942074677 Huntington Av Boston MaJohn P Mcanespie Iii
Proposed work: installation of an inergen fire suppression system and a vesda smoke detection system. Last action: ready to issue
Date:  July 15, 2013

Permit type: Long form/alteration permit | Expiration date: January 15, 2014 | Current use: Comm | Permit id: Alt7778
2013/07/15095677 Huntington Av Boston Ma
Welding for reconfiguration of kitchen exhaust duct in kitchen prep area bfd paid detail required
Date:  October 19, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw100792 | Parcel: 0401882000
2011/10/19095677 Huntington Av Boston Ma
Asbestos removal vermicolite
Date:  November 12, 2013

Permit type: Bfd asbestos removal | Permit id: Asb303015 | Parcel: 0401882000
2013/11/12095677 Huntington Av Boston Ma
Welding of existing 2" steel pipe fuel lines;for installation of a new emergency generator bfd paid detail required
Date:  May 20, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw361243 | Parcel: 0401882000
2014/05/20095677 Huntington Av Boston Ma
SCORE
100
Renovation of lower level @ ground level
Date:  November 26, 2014
Value:   $85,000
Contractor: Karen Sykes

Permit type: Electrical permit | Expiration date: May 26, 2015 | Current use: Comm | Permit id: E430311 | Parcel: 0401882000
2014/11/2685000100677 Huntington Av Boston MaKaren Sykes
SCORE
100
Annual electrical maintenance
Date:  May 20, 2011
Value:   $2,000
Contractor: Paul Dunphy

Permit type: Electrical permit | Expiration date: November 20, 2011 | Current use: Comm | Permit id: E77590 | Parcel: 0401882000
2011/05/202000100677 Huntington Av Boston MaPaul Dunphy
SCORE
96
Infill atrium floor as pre plans. All work will be in full compliance with 780cmr 521cmr. No changes to egress no changes to life safety systems. No changes to far. No mechanical plumbing hvac work.
Date:  August 26, 2014
Value:   $200,000

Permit type: Short form bldg permit | Expiration date: February 26, 2015 | Current use: Comm | Permit id: Sf400743 | Parcel: 0401882000
2014/08/2620000096677 Huntington Av Boston MaChristopher Scarvalas
SCORE
100
Demo existing power and lighting. Wire new power and lighting for new office space
Date:  September 27, 2010
Value:   $13,000
Contractor: William Pearson

Permit type: Electrical permit | Expiration date: March 27, 2011 | Current use: Comm | Permit id: E44484 | Parcel: 0401882000
2010/09/2713000100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
Wire and install controls for 2 fan coil units and 12 vav boxes
Date:  January 9, 2015
Value:   $9,000
Contractor: William Pearson

Permit type: Electrical low voltage | Expiration date: July 9, 2015 | Current use: Other | Permit id: Elv439863 | Parcel: 0401882000
2015/01/099000100677 Huntington Av Boston MaWilliam Pearson
SCORE
64
Relocate existing modular partitions repair ceilings install flooring paint where necessary and millwork office furniture as per plan.
Date:  June 21, 2010
Value:   $109,000
Contractor: Robert H Bray

Permit type: Short form bldg permit | Expiration date: December 21, 2010 | Current use: Other | Permit id: Sf30586 | Parcel: 0401882000
2010/06/2110900064677 Huntington Av Boston MaRobert H Bray
SCORE
100
Renovation of 2nd floor classroom area
Date:  April 3, 2015
Value:   $35,000
Contractor: Joseph Mccluskey

Permit type: Electrical fire alarms | Expiration date: October 3, 2015 | Current use: Other | Permit id: Efa459446 | Parcel: 0401882000
2015/04/0335000100677 Huntington Av Boston MaJoseph Mccluskey
Pipe insulation spray on fire proofing insulating cement transite panels and caulking
Date:  May 27, 2015

Permit type: Bfd asbestos removal | Permit id: Asb477050 | Parcel: 0401882000
2015/05/27095677 Huntington Av Boston Ma
Bfd alter stationary portable
Date:  April 28, 2014

Permit id: Aspce356273 | Parcel: 0401882000
2014/04/28095677 Huntington Av Boston Ma
Harvard school of public health. Joint compound and spray -on fireproofing.
Date:  July 18, 2014

Permit type: Bfd asbestos removal | Permit id: Asb385202 | Parcel: 0401882000
2014/07/18095677 Huntington Av Boston Ma
To remove asbestos from the 1st floor
Date:  April 14, 2010

Permit type: Bfd asbestos removal | Permit id: Asb21721 | Parcel: 0401882000
2010/04/14095677 Huntington Av Boston Ma
Monor select demo &; renovations to include drywall to buildout new kitchen offices &; computer classroom.
Date:  December 11, 2014

Permit type: Bfd construction demo reno | Permit id: Fdc433985 | Parcel: 0401882000
2014/12/11095677 Huntington Av Boston Ma
Welding only of kitchen exhaust hood (dpl) bfd paid detail required
Date:  May 5, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw75541 | Parcel: 0401882000
2011/05/05095677 Huntington Av Boston Ma
Cutting / burning / welding of kitchen hood and exhaust hood and associated ductwork for re-configuration (dpl) bfd paid detail required
Date:  April 4, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw70076 | Parcel: 0401882000
2011/04/04095677 Huntington Av Boston Ma
SCORE
100
Erect two (2) temporary tents 80x1 & 20x and four (4) canopies 9x 9x 9x & 14x54 in the countway library courtyard of harvard school of public health to be used for commencement activities. Install wednesday may 21 2014. Remove saturday may 31 2014.
Date:  April 28, 2014
Value:   $17,000
Contractor: Keith Wauters

Permit type: Short form bldg permit | Expiration date: October 28, 2014 | Current use: Other | Permit id: Sf353177 | Parcel: 0401882000
2014/04/2817000100677 Huntington Av Boston MaKeith Wauters
Place of assembly for 7 persons as follows: set-up 1 - table &; chairs-74-persons; standing-636-persons; set-up 2- table &; chairs only-3 persons
Date:  November 13, 2012

Permit type: Bfdtemporary place of assembly | Permit id: Tpla199844
2012/11/13095677 Huntington Av Boston Ma
SCORE
68
Reconfiguration of existing walls. No fire no plumbing.
Date:  October 28, 2014
Value:   $12,000
Contractor: Robert Bray

Permit type: Short form bldg permit | Expiration date: April 28, 2015 | Current use: Comm | Permit id: Sf419580 | Parcel: 0401882000
2014/10/281200068677 Huntington Av Boston MaRobert Bray
SCORE
88
Install a new 3000a service and a new 1000kw generator
Date:  October 30, 2013
Value:   $2,500,000
Contractor: Gregory Sapochetti

Permit type: Electrical permit | Expiration date: April 30, 2014 | Current use: Comm | Permit id: E299543 | Parcel: 0401882000
2013/10/30250000088677 Huntington Av Boston MaGregory Sapochetti
SCORE
100
Renovation to existing building.
Date:  October 6, 2015
Value:   $49,570
Contractor: Francis Averill

Permit type: Electrical permit | Expiration date: April 6, 2016 | Current use: Comm | Permit id: E523241 | Parcel: 0401882000
2015/10/0649570100677 Huntington Av Boston MaFrancis Averill
SCORE
100
Misc renovation to existing building harvard chan
Date:  October 6, 2015
Value:   $7,500
Contractor: Francis Averill

Permit type: Electrical fire alarms | Expiration date: April 6, 2016 | Current use: Comm | Permit id: Efa523253 | Parcel: 0401882000
2015/10/067500100677 Huntington Av Boston MaFrancis Averill
SCORE
100
Complete low voltage control wiring for 2 new fan coil units
Date:  September 20, 2016
Value:   $3,000
Contractor: William Pearson

Client: Harvard College | Permit type: Electrical low voltage | Expiration date: March 20, 2017 | Current use: Comm | Permit id: Elv638158 | Parcel: 0401882000
2016/09/203000100677 Huntington Av Boston MaWilliam Pearson
SCORE
100
Disconnect reconnect existing power to ac unit. New power feed for 2 water pumps - hsph ac1-18 - ap 163119
Date:  March 28, 2016
Value:   $12,500
Contractor: Paul Guarracino

Client: Harvard College | Permit type: Electrical permit | Expiration date: September 28, 2016 | Current use: Comm | Permit id: E574887 | Parcel: 0401882000
2016/03/2812500100677 Huntington Av Boston MaPaul Guarracino
SCORE
100
Provide 1 amp panel for temporary power to tent. Install 8 exit signs and power for 4 air conditioners.
Date:  April 27, 2016
Value:   $1,500
Contractor: Paul Dunphy

Client: Harvard College | Permit type: Electrical temporary service | Expiration date: October 27, 2016 | Current use: Comm | Permit id: Ets584380 | Parcel: 0401882000
2016/04/271500100677 Huntington Av Boston MaPaul Dunphy
Harvard school of public health- building 3-mechanical room 300lf of pipe insulation;&; 7 sq ft spray on fireproofing on the ceiling &; 1000sq ft debris on floor
Date:  June 13, 2014

Client: Harvard College | Permit type: Bfd asbestos removal | Permit id: Asb373107 | Parcel: 0401882000
2014/06/13095677 Huntington Av Boston Ma
Rooms 502 &; 504
Date:  March 22, 2016

Client: Harvard College | Permit type: Bfd asbestos removal | Permit id: Asb573186 | Parcel: 0401882000
2016/03/22095677 Huntington Av Boston Ma
SCORE
86
Duct smoke detectors and dampers lower level notification devices 1st floor
Date:  February 6, 2015
Contractor: Erica Burgos

Client: Harvard College | Permit type: Bfd fire alarm installations | Permit id: Bfdf437289 | Parcel: 0401882000
2015/02/06086677 Huntington Av Boston MaErica Burgos
SCORE
100
Annual electrical maintenance permit
Date:  June 23, 2016
Value:   $5,000
Contractor: Paul Dunphy

Client: Harvard College | Permit type: Electrical permit | Expiration date: December 23, 2016 | Current use: Comm | Permit id: E603918 | Parcel: 0401882000
2016/06/235000100677 Huntington Av Boston MaPaul Dunphy
Rooms 603 &; 604a
Date:  February 19, 2016

Client: Harvard College | Permit type: Bfd asbestos removal | Permit id: Asb563588 | Parcel: 0401882000
2016/02/19095677 Huntington Av Boston Ma
Cutting burning welding of kitchen hood and exhaust hood and associated ductwork for re-configuration (dpl) bfd paid detail required
Date:  April 4, 2011

Client: Harvard College | Permit type: Bfd cutting-burning-welding | Permit id: Cbw70076 | Parcel: 0401882000
2011/04/04095677 Huntington Av Boston Ma
Bfd asbestos removal
Date:  July 14, 2016

Client: Harvard College | Permit id: Asb611967 | Parcel: 0401882000
2016/07/14095677 Huntington Av Boston Ma
Welding only for removal replacment of 2-corroded vent connections on the chilled water supply &; return piping mains bfd paid detail required
Date:  March 28, 2013

Permit type: Bfd cutting-burning-welding | Permit id: Cbw229986
2013/03/28095677 Huntington Av Boston Ma
SCORE
84
Fitout of imaging lab at harvard school of public health
Date:  July 15, 2016
Value:   $25,600
Contractor: Chris Oconnor

Client: Harvard College | Permit type: Plumbing permit | Expiration date: January 15, 2017 | Current use: Comm | Permit id: Pl611042 | Parcel: 0401882000
2016/07/152560084677 Huntington Av Boston MaChris Oconnor
Cutting burning welding for installation of steel beams to support new concrete slab in existing building bfd paid detail required ; 1 ff required
Date:  October 30, 2014

Client: Harvard College | Permit type: Bfd cutting-burning-welding | Permit id: Cbw418800 | Parcel: 0401882000
2014/10/30095677 Huntington Av Boston Ma
Certificate number expired on date of this permit 4 25 15. Harvard school of public health. Cleaning disposal of asbestos containing debris from room 403 404 405 407 &; 408.
Date:  April 30, 2015

Client: Harvard College | Permit type: Bfd asbestos removal | Permit id: Asb467571 | Parcel: 0401882000
2015/04/30095677 Huntington Av Boston Ma
Cutting burning welding of steel and copper piping to support the installation of hvac ahu equipment; (dpl) bfd paid detail required
Date:  October 1, 2015

Client: Harvard College | Permit type: Bfd cutting-burning-welding | Permit id: Cbw523438 | Parcel: 0401882000
2015/10/01095677 Huntington Av Boston Ma
Spray on fire proofing joint compound
Date:  June 10, 2015

Client: Harvard College | Permit type: Bfd asbestos removal | Permit id: Asb481660 | Parcel: 0401882000
2015/06/10095677 Huntington Av Boston Ma
SCORE
100
Temporary cord connected power for lighting and receptacles under tent for commencement
Date:  May 20, 2016
Value:   $700
Contractor: William Pearson

Client: Harvard College | Permit type: Electrical temporary service | Expiration date: November 20, 2016 | Current use: Other | Permit id: Ets592009 | Parcel: 0401882000
2016/05/20700100677 Huntington Av Boston MaWilliam Pearson
Room 1005b
Date:  August 30, 2016

Client: Harvard College | Permit type: Bfd asbestos removal | Permit id: Asb632067 | Parcel: 0401882000
2016/08/30095677 Huntington Av Boston Ma
Cutting burning welding for chilled water re-piping installation (dpl) bfd paid detail required
Date:  March 29, 2011

Client: Harvard College | Permit type: Bfd cutting-burning-welding | Permit id: Cbw68670 | Parcel: 0401882000
2011/03/29095677 Huntington Av Boston Ma
Welding only for installation of new metal fence functioning as a guardrail to replace old aluminuim guardrails on top of retaining wall
Date:  August 26, 2016

Client: Harvard College | Permit type: Bfd cutting-burning-welding | Permit id: Cbw625196 | Parcel: 0401882000
2016/08/26095677 Huntington Av Boston Ma
Impair the floor sprinkler system during abatement work beginning on sunday 8 24 14 between the hours of 18 - 0600.; work is expected to be completed on 9 30 14 work to be done per nfpa stands one floor zone at a time. No occupancy in impaired zone. Follow harvard impairment letter dated aug. 19 2014.
Date:  August 22, 2014

Client: Harvard College | Permit type: Bfd sprinkler system | Permit id: Sprk399726 | Parcel: 0401882000
2014/08/22095677 Huntington Av Boston Ma
SCORE
99
Remodeling
Date:  September 8, 2016
Value:   $30,000
Contractor: Angela Noenickx

Client: Harvard College | Permit type: Electrical permit | Expiration date: March 8, 2017 | Current use: Comm | Permit id: E634801 | Parcel: 0401882000
2016/09/083000099677 Huntington Av Boston MaAngela Noenickx
SCORE
100
Low voltage hvac control wiring ~ hsph ac1-18 ~ job #16-3188 (pag)
Date:  February 29, 2016
Value:   $20,000
Contractor: Paul Guarracino

Client: Harvard College | Permit type: Electrical low voltage | Expiration date: August 29, 2016 | Current use: Comm | Permit id: Elv564917 | Parcel: 0401882000
2016/02/2920000100677 Huntington Av Boston MaPaul Guarracino
SCORE
88
Provide 1 amp panel for temporary power to tent. Install 8 exit signs. Install power for 4 air conditioners.
Date:  May 10, 2017
Value:   $1,500
Contractor: Paul F Dunphy Jr

Client: Harvard College | Permit type: Electrical temporary service | Expiration date: November 10, 2017 | Current use: Comm | Permit id: Ets705103 | Parcel: 0401882000
2017/05/10150088677 Huntington Av Boston MaPaul F Dunphy Jr
SCORE
95
Temporary power for lighting and sound under tent for graduation ceremony
Date:  May 15, 2017
Value:   $500
Contractor: Louis Pearson

Client: Harvard College | Permit type: Electrical temporary service | Expiration date: November 15, 2017 | Current use: Comm | Permit id: Ets708262 | Parcel: 0401882000
2017/05/1550095677 Huntington Av Boston MaLouis Pearson
SCORE
79
Annual electrical maintenance permit
Date:  June 7, 2017
Value:   $10,000

Client: Harvard College | Permit type: Electrical permit | Expiration date: December 7, 2017 | Current use: Comm | Permit id: E715421 | Parcel: 0401882000
2017/06/071000079677 Huntington Av Boston MaDonald Fess Cfps Set
SCORE
100
Erect temporary tents 80x1 & 20x to be used for a vendor show on wednesday & thursday september 22nd & september 23rd 2010. Install sat/sun 9/18 & 9/19/2010. Remove sat/sun 9/25 & 9/26/2010. Occupancy 500
Date:  September 14, 2010
Value:   $10,525
Contractor: Keith Wauters

Client: Harvard College | Permit type: Short form bldg permit | Expiration date: March 14, 2011 | Current use: Other | Permit id: Sf41682 | Parcel: 0401882000
2010/09/1410525100677 Huntington Av Boston MaKeith Wauters
SCORE
89
Offices laboratory and school coo for computer room (l06) alt415526 issued: 11/21/2014
Date:  January 26, 2015
Contractor: Salvatore Motta

Client: Harvard College | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo442158 | Parcel: 0401882000
2015/01/26089677 Huntington Av Boston MaSalvatore Motta
SCORE
59
Perform demolition of non-structural partitions casework and disposal of all materials as detailed in drawings by janovsky/hurley architects. Cslic# 84316 (781)-603-9046; bond bros. Is to file longform for renovation work.
Date:  December 29, 2009
Value:   $22,000
Contractor: Richard J Bradley

Client: Harvard College | Permit type: Short form bldg permit | Expiration date: June 29, 2010 | Current use: Comm | Permit id: Sf2781 | Parcel: 0401882000
2009/12/292200059677 Huntington Av Boston MaRichard J Bradley
SCORE
88
Offices laboratory and school certificate of; occupancy;for office;- ground level - only alt420289 issued 11/14/14
Date:  April 29, 2015
Value:   $200,000
Contractor: Sal Motta

Client: Harvard College | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo453458 | Parcel: 0401882000
2015/04/2920000088677 Huntington Av Boston MaSal Motta
SCORE
92
Harvard university - school of public health - kresge bldg - lower level -construct new steel platform above existing unlevel floor surface.; infill / pour a new leveling slab; as per plans.; all work will be in full compliance with 780cmr 521cmr. No changes to egress no changes to life safety systems. No changes to far.; modify existing mep / fa/ sprinklers; appl cost ?? Changed from sf400743.; already paid for sf application.
Date:  November 21, 2014
Contractor: Michael Haynes

Client: Harvard College | Permit type: Long form/alteration permit | Expiration date: May 21, 2015 | Current use: Comm | Permit id: Alt415526 | Parcel: 0401882000
2014/11/21092677 Huntington Av Boston MaMichael Haynes
SCORE
100
Hsph - rm502 - lighting retrofit 59 light fixtures - led retrofits - ap 164089
Date:  December 27, 2016
Value:   $14,900
Contractor: Paul Guarracino

Client: Harvard College | Permit type: Electrical permit | Expiration date: June 27, 2017 | Current use: Comm | Permit id: E668253 | Parcel: 0401882000
2016/12/2714900100677 Huntington Av Boston MaPaul Guarracino
SCORE
100
Temporary bagging of smoke detectors
Date:  July 10, 2017
Contractor: Paul Mcdonald

Permit type: Bfd bag smoke detectors | Permit id: Bsd726334
2017/07/100100677 Huntington Av Boston MaPaul Mcdonald
SCORE
100
Hsph bldgs 1 3 and fxb misc. Low voltage hvac control wiring - pag 174390
Date:  March 22, 2017
Value:   $15,000
Contractor: Paul Guarracino

Client: Harvard College | Permit type: Electrical low voltage | Expiration date: September 22, 2017 | Current use: Comm | Permit id: Elv689675 | Parcel: 0401882000
2017/03/2215000100677 Huntington Av Boston MaPaul Guarracino
SCORE
82
Relocate sprinklers on the 1st floor.
Date:  November 21, 2016
Contractor: Anne Hayes

Client: Harvard College | Permit type: Bfd sprinkler system | Permit id: Sprk655293 | Parcel: 0401882000
2016/11/21082677 Huntington Av Boston MaAnne Hayes
SCORE
100
New lab work of lab and office space. New dw closed open ceilings. There will be minor demo included to existing space to prep for new work. This is a small space dedicated to a specific lab type.
Date:  July 19, 2017
Contractor: Paul Mcdonald

Permit type: Bfd construction demo reno | Expiration date: July 14, 2018 | Permit id: Fdc726327
2017/07/190100677 Huntington Av Boston MaPaul Mcdonald
SCORE
64
Perform work identified in drawings prepared by janovsky hurley architects dated 7/21/ sph-3 tenth floor relocate existing modular partitions install new partitions where indicated. Repair ceilings install flooring and paint where necessary. Reuse exisiting electric as is. Milwork and office furniture as per plan. All fire sprinkler electric plumbing and hvac to remain the same.
Date:  July 29, 2010
Value:   $125,400
Contractor: Robert H Bray

Client: Harvard College | Permit type: Short form bldg permit | Expiration date: January 29, 2011 | Current use: Comm | Permit id: Sf36090 | Parcel: 0401882000
2010/07/2912540064677 Huntington Av Boston MaRobert H Bray
SCORE
92
Office fitout of approx. 4 8 sf of shell space on the ground level including mep/fp/fa partitioms and finishes.
Date:  November 14, 2014
Value:   $200,000
Contractor: Michael Haynes

Client: Harvard College | Permit type: Long form/alteration permit | Expiration date: May 14, 2015 | Current use: Comm | Permit id: Alt420289 | Parcel: 0401882000
2014/11/1420000092677 Huntington Av Boston MaMichael Haynes
SCORE
100
Minor renovations to existing fire alarm system. Building 2 4th floor: add 1 smoke detector and 1 a/v device into existing system. Building fxb 3rd floor: add 1 smoke detector and 1 a/v device into existing system. Work to be done per nfpa stands. 7 cmr.
Date:  November 28, 2015
Contractor: Francis Averill

Client: Harvard College | Permit type: Bfd fire alarm installations | Permit id: Bfdf528154 | Parcel: 0401882000
2015/11/280100677 Huntington Av Boston MaFrancis Averill
SCORE
100
Offices laboratory and school coo for classrooms (2nd floor) alt446312 issued 2/19/2015
Date:  January 29, 2016
Value:   $1,150,000
Contractor: Jack Moriarty

Client: Harvard College | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo555414 | Parcel: 0401882000
2016/01/291150000100677 Huntington Av Boston MaJack Moriarty
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.