Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 This project involves the new construction of a steel framed boathouse at southshore harbor in new orleans. The boathouse will be the home of a restored wwii-era pt boat owned by the national wwii museum. The boathouse will be an open-air space with sliding doors on the long sides to open it up to exterior breezes. The boathouse will also be built below the fema base flood elevation (in order to serve its function as a boathouse) and the walls will therefore be built as break-away panels. See diagram on sheet 1. 2 of attached drawings. This project includes no mechanical or plumbing systems and the electrical portions of the project are estimated to cost less than 15,0 therefor stamped electrical drawings are not included. See sheet e1 for more information on the limited electrical scope of work. This project is phase 1 in a larger development called "lakeshore landing" seeking to reenergize southshore harbor over the coming years. Later phases will include renovation of the adjacent form Permit type: New construction | Permit status: Permit issued | Expiration date: January 18, 2017 | Current use: Mixed use | Permit id: 16-17927-Newc | |||||
SCORE 59 This project involves the new construction of a steel framed boathouse at southshore harbor in new orleans. The boathouse will be the home of a restored wwii-era pt boat owned by the national wwii museum. The boathouse will be an open-air space with sliding doors on the long sides to open it up to exterior breezes. The boathouse will also be built below the fema base flood elevation (in order to serve its function as a boathouse) and the walls will therefore be built as break-away panels. See diagram on sheet 1. 2 of attached drawings. This project includes no mechanical or plumbing systems and the electrical portions of the project are estimated to cost less than 15,0 therefor stamped electrical drawings are not included. See sheet e1 for more information on the limited electrical scope of work. This project is phase 1 in a larger development called "lakeshore landing" seeking to reenergize southshore harbor over the coming years. Later phases will include renovation of the adjacent form Permit type: New construction | Permit status: Permit issued | Expiration date: January 18, 2017 | Current use: Mixed use | Permit id: 16-17927-Newc | |||||
SCORE 77 Construct 26 sq ft raised retail use with covered deck areas as per plans. Permit type: New construction | Permit status: Application submitted | Current use: Business use | Permit id: 16-33163-Newc | |||||
SCORE 98 Basic lights, receptacles & a c unit 16-17927-newc Date: April 3, 2017 Contractor: Torriono Kelly Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Expiration date: October 3, 2017 | Current use: Business use | Permit id: 17-11222-Erpr |