Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Mechanical permit for forced-air furnace ![]() ![]() Applicant: Welzig Mechanical | Permit type: Mechanical | Permit status: Cmp | Completion date: December 26, 2006 | Current use: Single family a | |||||
SCORE 95 New 1. 5 in backflow preventor for building 16 ![]() ![]() Client: Authority Housing | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwe | |||||
SCORE 79 Building twenty at the bridgewalk complex -- installation of four disconnects, associated wiring and circuit breakers for four proposed a c units in this four-plex. Installation of four a c units by separate mechanical permit. ![]() ![]() Applicant: Colorado Mountain Electric | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Multifamily dwe | |||||
SCORE 100 Installation of a flush mount grid-tie 2. 34 kw photovoltaic system on two roofs of this quadplex. Arrays to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. ![]() ![]() Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 16, 2012 | Current use: Multifamily dwe | |||||
SCORE 82 Tear-off & reroof of a multifamily structure -- 27 squares of asphalt shingles on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed. Approved per applicable sections of 2006 ibc and brc 1981 as amended. Mid-roof inspection required if any portion of the roof is below a 4 12 pitch. ![]() ![]() Applicant: L H L Contractors | Permit type: Roofing | Permit status: Cmp | Completion date: April 13, 2012 | Current use: Multifamily dwe | |||||
SCORE 82 Tear-off & reroof of a multifamily structure -- 27 squares of asphalt shingles on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed. Approved per applicable sections of 2006 ibc and brc 1981 as amended. Mid-roof inspection required if any portion of the roof is below a 4 12 pitch. Permit type: Roofing | Permit status: Cmp | Completion date: April 13, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-01496 | |||||
SCORE 95 New 1. 5 in backflow preventor for building 16 Client: Authority Housing | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05266 | |||||
SCORE 79 Building twenty at the bridgewalk complex -- installation of four disconnects, associated wiring and circuit breakers for four proposed a c units in this four-plex. Installation of four a c units by separate mechanical permit. Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05356 | |||||
SCORE 100 Installation of a flush mount grid-tie 2. 34 kw photovoltaic system on two roofs of this quadplex. Arrays to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 16, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05461 | |||||
SCORE 95 Mechanical permit for forced-air furnace Permit type: Mechanical | Permit status: Cmp | Completion date: December 26, 2006 | Current use: Single family attached dwelling, existin | Permit id: Pmt2006-03954 |