Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 Add 5 devices to existing system 2 pull stations and 3 speaker strobes doc20111341 Date: January 9, 2012 Contractor: Paul Dunphy Harvard University Permit status: Na | Permit id: Bfdf110756 | |||||
Welding of elevator equipment;in fxb-bldg (dpl) bfd paid detail required Date: August 30, 2012 Permit status: Na | Permit id: Cbw170473 | |||||
Burning &; welding to install new piping;(dpl) bfd paid detail required Date: January 22, 2010 Permit status: Na | Permit id: Cbw11024 | |||||
Installation of upho Date: June 21, 2014 Permit status: Na | Permit id: Chm374903 | |||||
Install tie back anchors and fall protection systems bfd paid detail required Date: May 11, 2012 Permit status: Na | Permit id: Cbw137356 | |||||
Cutting &; welding metal equipment skids and bracketing for equipment replacement bfd paid detail required Date: October 1, 2013 Permit status: Na | Permit id: Cbw289151 | |||||
Cutting / burning / welding of piping for relocation of a natural gas meter (dpl) for each separate location bfd paid detail required Date: November 26, 2013 Permit status: Na | Permit id: Cbw307148 | |||||
SCORE 96 Remove and replace exterior facade sealants at the metal panels windows and masonry facade Permit type: Other | Current use: Comm | Permit id: Sf142316 | |||||
SCORE 100 Relocate elevator disconnect switches in machine room. Install cab light disconnects at harvard school of public health. Client: President & Fellows | Permit type: Electrical | Current use: Other | Permit id: E195378 | Parcel: 401880000 |