Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Strip single layer of roof shingles off roofs. Install ice/water shield at lower edges. Install 15 lb. Roof paper over remaining sheathing. Aluminum drip edge along perimeters. Nail architectural shingles to roofs. Install new lead counter flashing in chimney. Remove debris with our trailer in driveway. Permit type: Roof | Completion date: June 4, 2014 | Parcel: 12196 | |||||
SCORE 93 Strip single layer of roof shingles off roofs. Install ice water shield at lower edges. Install 15 lb. Roof paper over remaining sheathing. Aluminum drip edge along perimeters. Nail architectural shingles to roofs. Install new lead counter flashing in chimney. Remove debris with our trailer in driveway. Permit type: Roof | Completion date: June 4, 2014 | Permit id: 0 | Parcel: 12196 |