Content |
---|
SCORE 100 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 1(kw) solar photovoltaic system will be installed on roof of residence. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: November 14, 2014 | Expiration date: November 11, 2015 | Current use: Single family / duplex | Permit id: 6445719 |
SCORE 100 Replace 2 amp panel in basement, correct wiring grounding bonding. 2 22 jcb; add (9) outlets, (4) 15-25 amp ckts and (1) 1 amp feeder. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: June 10, 2010 | Expiration date: February 15, 2011 | Current use: Single family / duplex | Permit id: 6240671 |