Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 62 For the complete demolition of a two-story attached structure as per site safety & demolition plan. Mechanical demolition to be performed outside of the structure. A covered walkway or sidewalk closure shall be required within 9-6" of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. Air waived as per l+i imminently dangerous violation (case no. 556346. ![]() ![]() Client: J Addison Henry Mem Presby Church | Permit type: Demolition permit | Permit status: Expired | Completion date: July 28, 2017 | Permit id: 753076 | |||||
SCORE 91 For the complete demolition of all structures on site. Size and location as shown in plans. For use as a vacant lot. Permit issued to comply l+i violation (case no. 556346). ![]() ![]() Client: J Addison Henry Mem Presby Church | Permit type: Zoning/use permit | Permit status: Completed | Completion date: February 8, 2017 | Permit id: 753075 |