Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Addition permit Date: May 12, 2016 Permit status: Active | Permit id: 666125 | |||||
Zoning/use permit Date: January 29, 2016 Permit status: Completed | Permit id: 663734 | |||||
Alteration permit Date: August 16, 2016 Permit status: Active | Permit id: 715100 | |||||
Suppression permit Date: August 9, 2016 Permit status: Active | Permit id: 710739 | |||||
Zoning/use permit Date: December 12, 2014 Permit status: Completed | Permit id: 575345 | |||||
Plumbing permit Date: September 7, 2016 Permit status: Active | Permit id: 692570 | |||||
Zoning permit Date: November 14, 2014 Permit status: Completed | Permit id: 569447 | |||||
Zoning use permit Date: January 29, 2016 Permit status: Completed | Permit id: 663734 | |||||
Addition permit Date: May 12, 2016 Permit status: Active | Permit id: 666125 | |||||
Zoning permit Date: November 14, 2014 Permit status: Completed | Permit id: 569447 | |||||
Alteration permit Date: August 16, 2016 Permit status: Active | Permit id: 715100 | |||||
Zoning use permit Date: December 12, 2014 Permit status: Completed | Permit id: 575345 | |||||
Suppression permit Date: August 9, 2016 Permit status: Active | Permit id: 710739 | |||||
Plumbing permit Date: September 7, 2016 Permit status: Active | Permit id: 692570 | |||||
SCORE 96 Addition: interior & exterior plumbing for a 3-story building with vacant commercial on the 1st floor and (13) dwelling unit on the 2nd & 3rd floors (mixed-use). The installation includes a 2" domestic water distribution service & (2)-6" sanitary sewer laterals to the street mains. Self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection". The installation will comply with the philadelphia plumbing code, 2004. Fuel gas piping and equipment is not part of this permit and will require a mechanical permit. Date: September 7, 2016 Contractor: Frankie D And Benny G Plumbing And Client Company: 6 Federal Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 3, 2017 | Permit id: 692570 | |||||
SCORE 99 Masonry rear wall - remove entire existing 1 story rear masonry wall 55x 11 x 12". Replace with new 8 inch masonry wall, ( 8" block) on existing foundation. Windows and door same location & shall comply with the 2009 international energy efficiency code, u factor of . 35, and with emergency egress standards as per irc. New door opening for 36 inch door. Horizontal reinforcement (durawall) every 24 inches or equivalent. Install returns into party walls for structural connection. Flash and seal roof to new front. No other work allowed under this permit. Remove wall-vacant parking garage Date: August 16, 2016 Contractor: Turn Key Realty Llc Client Company: 6 Federal Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 28, 2017 | Permit id: 715100 | |||||
SCORE 86 Partial demolation of the structure includes removal of entire roof and second floor and associated walls and approx 5 feet of the front,rear and east walls. Removal all drywall and mechanicals. Separate street closure permit required prior to start of work Date: April 20, 2016 Contractor: Terrence Froman Inc Client Company: 6 Federal Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: July 7, 2017 | Permit id: 678044 | |||||
Tco for the main lobby, second and third floors. Date: July 19, 2017 Client Company: 6 Federal Lp | Permit type: Administrative permit | Permit status: Active | Completion date: July 26, 2017 | Permit id: 801293 | |||||
Tco for one unit on the ground floor. Date: September 7, 2017 Client Company: 6 Federal Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: September 8, 2017 | Permit id: 814208 | |||||
SCORE 99 Install (14) hvac systems with ductwork. (mixed use) Date: July 25, 2017 Contractor: Airtight Heating And Cooling Inc Client Company: 6 Federal Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 3, 2017 | Permit id: 802843 | |||||
For a business and professional at first floor front (within the first ft of building depth , measured from the front building line) and single family household living at first floor rear in the same building with multi-family household living ( 12 dwelling units from second floor through third floor ( total 13 dwelling units on lot. Date: September 22, 2017 Client Company: 6 Federal Lp | Permit type: Use permit | Permit status: Completed | Completion date: September 22, 2017 | Permit id: 818643 | |||||
For lot consolidation into one lot as per plans. For the additionof a second and third story to the existing structure, to be used as (13) family dwelling, first floor commercial, with (9) off=street parking accessory parking stalls. Date: November 14, 2014 Client Company: 6 Federal Lp | Permit type: Zoning permit | Permit status: Completed | Completion date: November 14, 2014 | Permit id: 569447 | |||||
For the demolition of existing second story; for the relocation of previously approved tower( to be used for roof maintenance access only)accessory parking garage for eight(8) cars. Including with one(1) accessible space. Size and location as shown in the application. Date: January 29, 2016 Client Company: 6 Federal Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 29, 2016 | Permit id: 663734 | |||||
Complete change in use and occupancy classification of the 1st floor with level iii interior alterations and for the erection of a 2nd and 3rd floor addition with pilot houses. Asbestos abatement required prior to commencement of work. Entire building to be fully sprinklered per nfpa 13. Separate permit required for any mechanical electrical, plumbing and fire suppression work. Separate permit required for selective demolition. Date: May 12, 2016 Client Company: 6 Federal Lp | Permit type: Addition permit | Permit status: Completed | Completion date: October 3, 2017 | Permit id: 666125 | |||||
SCORE 100 Wiring and installing all light fixtures,devices,smoke detectors,gfi,800amp 3 phase service with 125amp to each apt 13 and 1 commerical space. All common house wiring,all phone,tv,intercom and camera system. Hook-ups all heating and a c units per 2008 nec (mixed use)a new fire alarm system per nfpa 72 Date: July 18, 2017 Contractor: Harte Electrics Client Company: 6 Federal Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: October 4, 2017 | Permit id: 768183 | |||||
SCORE 93 Install 5" sewer lateral for rain water (mixed use)20170860709self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: April 12, 2017 Contractor: M E B Plumbing Client Company: 6 Federal Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 8, 2017 | Permit id: 774603 | |||||
SCORE 100 New 4" fire service. New pipe, hangers, and fittings. New city approved backflow prevention assembly,new fire department connection. Sprinklers system throughout building in accordance with nfpa 13 Date: August 9, 2016 Contractor: Elite Fire Protection Client Company: 6 Federal Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: October 3, 2017 | Permit id: 710739 | |||||
For the addition of a second and third story to the existing structure, to be used as (13) family dwelling, first floor commercial, with (9) off=street parking accessory parking stalls. Date: December 12, 2014 Client Company: 6 Federal Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 19, 2016 | Permit id: 575345 |