Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Loberly mh demo Date: July 5, 2011 Permit status: Closed | Permit id: 11-03206 | |||||
Accardo, antonina Date: May 25, 2011 Permit status: Closed | Permit id: 11-01994 | |||||
SCORE 100 Accardo, antonina Date: May 25, 2011 Contractor: Dotson Plbg. And Htg Co. Inc Client: Accardo, Antonina | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 11-01994 | Parcel: 13365 | |||||
SCORE 100 Accardo, antonina Date: May 25, 2011 Contractor: Wyatt Electric Client: Accardo, Antonina | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 11-01994 | Parcel: 13365 | |||||
SCORE 70 Accardo, antonina Date: May 25, 2011 Contractor: Johnnys Manufactured And Client: Accardo, Antonina | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 11-01994 | Parcel: 13365 | |||||
April 13, 2011 10:39:56 am jfortner. Wav 3/4 5/8 tap and meter, paid 52. Ck 8291, jlf; may 19, 2011 10:06:14 am heatherr. Residential used mobile home placement for charles coberly to remove one mobile home and replace with similar unit (existing mobile home on property will be demoed by another contractor who will pull their on demo permit); har location: tunnel rd to hwy towards black mountain, turn right at reddick rd at emergency animal hospital; har; september 7, 2011 4:12:25 pm atesner. Premise number redacted phone number6; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top s Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 11-01994 | Parcel: 13365 | |||||
Loberly mh demo Date: July 5, 2011 Value: $1,500 Permit type: Historical | Permit status: Closed | Permit id: 11-03206 | |||||
April 13, 2011 10:39:56 am jfortner. Wav 3 4 5 8 tap and meter, paid 52. Ck 8291, jlf; may 19, 2011 10:06:14 am heatherr. Residential used mobile home placement for charles coberly to remove one mobile home and replace with similar unit (existing mobile home on property will be demoed by another contractor who will pull their on demo permit); har location: tunnel rd to hwy towards black mountain, turn right at reddick rd at emergency animal hospital; har; september 7, 2011 4:12:25 pm atesner. Premise number redacted phone number6; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top s Date: May 25, 2011 Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 11-01994 | Parcel: 13365 | |||||
SCORE 100 June 8, 2011 12:58:02 pm kneel. Loberly - mh demo, mh replacement 11-1994. Location: tunnel rd to reddick; june 8, 2011 12:59:11 pm kneel. Contractor to bring in ownership when premit is ready.; to request residential inspections call redacted phone number: demolition permit - building comments the issuance of this permit does not reflect approval or acceptance of building parts to remain after demolition. Adjoining public and private property shall be protected from damage during demolition work. Provisions shall be made to control water run-off and erosion during construction or demolition activities. All debris and accumulation of material resulting from demolition of any building or structure shall be removed from the premises. All utility connections shall be disconnected and secured in such manner that no unsafe or unsanitary conditions shall exist during or remain after demolition operations. Demolition area of building Client: Loberly Mh Demo | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-03206 | Parcel: 13365 |