Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 3rd floor, remove old plaster ceiling, new sheetrock, new bath, toilet, sink, shower, new rear door. Date: November 7, 2017 Contractor: Followthroughguys Client: Wolk Dennis C Litz Joanne | Permit type: Alteration permit | Permit status: Active | Completion date: November 13, 2017 | Permit id: 830137 | |||||
SCORE 100 Rewire 3rd floor bedroom,bathroom,hall,dedicated 20amp ckt for hvac unit,2 harewired smoke carbon detectors,9 fixturtes,11 outlets,7 switches and 3 arc fault breakers per 2008 nec (sfd) Date: December 4, 2017 Contractor: Dudley Hilton Electric Client: Wolk Dennis C Litz Joanne | Permit type: Electrical permit | Permit status: Active | Completion date: December 4, 2017 | Permit id: 836576 | |||||
SCORE 100 Add 1-3"soil vent stack for 1-shower stall, 1-toilet, 1-vanity, 2" waste line 1 1 2 waste line water lines the installation will comply with the philadelphia plumbing code 2004 Date: December 14, 2017 Contractor: Anthony Scorza Client: Wolk Dennis C Litz Joanne | Permit type: Plumbing permit | Permit status: Active | Completion date: December 14, 2017 | Permit id: 839364 |