Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Installation of new awning over north facing overhead door at loading dock. See adr2016-00022 for minor modification approval. Client: Boulder Ceg | Permit type: Building | Permit status: Cmp | Completion date: March 9, 2016 | Current use: Manufacturing, existing, patio cover, ad | Permit id: Pmt2016-00718 | |||||
SCORE 91 Installation of 1 permanent, non-electric, wall sign - upper line of copy inchbiinch, lower line of copy inch a geo group companyinch Client: North | Permit type: Sign | Permit status: Iss | Current use: Medical and dental clinics, existing | Permit id: Pmt2016-04734 | |||||
SCORE 95 Overlay only, on the (3) eastern most roof levels, of a commercial warehouse. 7 squares of 1 2inch hd cover board, 60-mil white tpo, mechanically fastened, on a pitch represented as 1 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: North | Permit type: Roofing | Permit status: Iss | Current use: Warehousing, existing | Permit id: Pmt2016-05545 | |||||
SCORE 95 Interior, non-structural demolition only associated with remodel proposed in pmt2017-00014. Date: January 17, 2017 Contractor: Integrated Interiors, Llc Client: I Re | Permit type: Demolition | Permit status: Cmp | Completion date: February 16, 2017 | Current use: Existing | Permit id: Pmt2017-00133 | |||||
SCORE 92 Installation of 1 permanent, non-electric, wall sign - upper line of copy inchbiinch, lower line of copy inch a geo group companyinch Client: North | Permit type: Sign | Permit status: Cmp | Completion date: October 13, 2017 | Current use: Medical and dental clinics, existing | Permit id: Pmt2016-04734 | |||||
SCORE 100 Fire sprinkler system - esfr in warehouse Client: Gunbarrel | Permit type: Fire | Permit status: Iss | Completion date: August 11, 2017 | Current use: Warehousing, existing | Permit id: Pmt2017-02137 |