Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 To continue to use premises as an open air public parking lot with a capacity of twenty-two (22) vehicles. Present use permit 10-364 expires january 21 2012. ![]() ![]() Permit type: Commercial parking | Current use: Vacld | Permit id: U49100435 | |||||
Roadway deposit for guaranteed street; 415 x 26; ![]() Permit type: Capital improvement | Permit id: Exca-39048 | |||||
Sidewalk construction; (money on deposit for sdwk);#;1406125636661; ds 2014-280-8988 ![]() Permit type: Capital improvement | Permit id: Exca-39051 | |||||
Relocation of existing sprinkler heads due to;constructon of new addition to hotel requiring head modification for temporary ceilings. Work to be done per npfpa stands. 7 cmr.; one floor zone at a time. No occupancy in impaired floor zones. Work to be done between 8 am - 5 pm. ![]() Permit status: Na | Permit id: Sprk417725 | |||||
Sidewalk deposit during construction of an addition to the hotel commonwealth in kenmore square ; deposit will be refunded if sidewalk and ramps are built to city standards -; deposit return request must be submitted within 6 months of job completion; permit fee 60. 00; inspection fee; 500. 00; deposit; 55 456. 00 ![]() Permit type: Sidewalk deposit | Permit status: Na | Permit id: Sdep-384770 | |||||
Installation of a pre engineered fire suppression system into a kitchen exhaust hood. Work to be done per nfpa stands 7 cmr to be tied to building fire alarm system on seperate zone. ![]() Permit status: Na | Permit id: Sprk476104 | |||||
Cuttingburning;for removal of ;soldier piles below grade ;so temporary shoring piles are not visible they are not a permanent component of building ![]() Permit status: Na | Permit id: Cbw458921 | |||||
To conduct the following: for storage of fuel on site quantites to be applied for by individual subcontractor permits : coordinated by the general contractor. ![]() Permit type: Bfd other | Permit status: Na | Permit id: Gp440627 | |||||
To conduct the following: to pour concrete slaba-rebar warmup proper curing temperatures and workable environment for other trades. To support construction operations during cold weather. ![]() Permit type: Temporary heat | Permit status: Na | Permit id: Gp440626 | |||||
Roadway deposit for guaranteed street; 415 x 26; ![]() Permit type: Capital improvement | Permit status: Open | Permit id: Exca-390488 | |||||
Renovations to include drywall acoustical ceilings &; finishes ![]() Permit status: Na | Permit id: Fdc442100 | |||||
Cutting / burning / welding for installation of pressure injected footings (pif) and welding of pieces of equipment;for new construction for hotel;commonwealth (dpl) ![]() Permit status: Na | Permit id: Cbw377311 | |||||
To conduct the following: for storage of gasoline ( gals) storage of propane (40lb tanks ion forklift) gas is stored eagle safety cabinets mc master carr-storage cabinet for propane ![]() Permit type: Bfd other | Permit status: Na | Permit id: Gp445061 | |||||
Sidewalk construction; (money on deposit for sdwk);#;1406125636661; ds 2014-280-8988 ![]() Permit type: Capital improvement | Permit status: Expired | Permit id: Exca-390515 |