Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Installation of [1] ductless heat pump lineset Date: July 9, 2015 Contractor: Evergreen Refrigeration Llc Applicant: Evergreen Refrigeration Llc | Permit type: Refrigeration | Permit status: Permit issued | Expiration date: January 9, 2017 | Current use: Single family / duplex | Permit id: 6482821 | |||||
SCORE 95 Installation of [1] ductless heat pump Date: July 9, 2015 Contractor: Evergreen Refrigeration Llc Applicant: Evergreen Refrigeration Llc | Permit type: Mechanical | Permit status: Permit issued | Expiration date: January 9, 2017 | Current use: Single family / duplex | Permit id: 6482820 | |||||
SCORE 86 Repair side sewer. Date: July 30, 2003 Contractor: R S Searle Contracting Applicant: R S Searle Contracting | Permit type: Side sewer | Permit status: Permit finaled | Completion date: July 31, 2003 | Expiration date: October 30, 2003 | Current use: Single family / duplex | Permit id: 6019419 | |||||
SCORE 86 Installation of side sewer Date: July 23, 2003 Contractor: R S Searle Contracting Applicant: R S Searle Contracting | Permit type: Side sewer | Permit status: Permit finaled | Completion date: July 28, 2003 | Expiration date: October 23, 2003 | Current use: Single family / duplex | Permit id: 6019031 | |||||
SCORE 93 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 6. 87 kw pv system on roof. Perform 2 amp service upgrade. 6/25/15 jle add [1] 1 amp sub-panel, [1] 240v 20amp ckt., [1] 240v 50amp ckt. Date: June 24, 2015 Contractor: Solterra Systems Permit type: Electrical | Permit status: Permit closed | Completion date: July 28, 2015 | Expiration date: June 23, 2016 | Current use: Single family / duplex | Permit id: 6480920 | |||||
SCORE 96 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 6. 87 kw pv system on roof. Perform 2 amp service upgrade. 6 25 15 jle add [1] 1 amp sub-panel, [1] 240v 20amp ckt., [1] 240v 50amp ckt. Date: June 24, 2015 Contractor: Earl Childs Permit type: Electrical | Permit status: Permit closed | Completion date: July 28, 2015 | Expiration date: June 23, 2016 | Current use: Single family / duplex | Permit id: 6480920 |