Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Elec. Only to replace meter for sfd Date: February 8, 2010 Permit type: Electrical : 80 - ac | Permit status: Permit expired | Permit id: Pds2010-1007-20 | |||||
SCORE 86 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: January 11, 2016 Contractor: Bill Howe Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 89 Elec. Only to replace meter for sfd Date: February 8, 2010 Contractor: Mc Wire Electric Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2010-1007-20 | |||||
Final Date: June 17, 2010 Permit status: Pass | Permit id: Pds2009-1030-20 | |||||
Underground electrical Date: December 11, 2009 Permit status: Pass | Permit id: Pds2009-1030-20 | |||||
SCORE 89 Elec. Only to replace meter for sfd Date: February 8, 2010 Contractor: Mc Wire Electric Permit type: Residential alterati | Permit status: Issued expired | Permit id: Pds2010-1007-20 | Parcel: 269-183-34-00 | |||||
SCORE 86 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: January 11, 2016 Contractor: Bill Howe Heating And Air Conditioning Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 93 Hra -solar water heather -roof mounted ( 2 collectors, one 1 gal tank w open loop) for existing sfd. Date: December 9, 2008 Contractor: Son Energy Permit type: Solar water heater (hra) | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 269-183-34-00 | |||||
SCORE 93 Ground mount residential solar pv for existing sfd no. Of modules: 86 no. Of inverters: 4 (48 watt) total system size in kilowatts: 18 - dc 6 2 10... Plan change... Typo in original plans, changing from 400amps to 125amps. Adding 100amp for solar to run on... No line-side tap... Mls Date: November 24, 2009 Contractor: Son Energy Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 269-183-34-00 |