Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
1st extension to building permit b92884 to expire november 5, 2012 Date: June 4, 2012 Applicant: Robert Sockwell | Permit type: New building | Permit status: Permit issued | Permit id: B1209633 | |||||
2nd extension of building permit b92884, to expire on may 5, 2013. Date: November 2, 2012 Applicant: Robert Sockwell | Permit type: New building | Permit status: Permit issued | Permit id: B1301082 | |||||
3rd and final extension of building permit b92884, to expire on november 5, 2013. Date: May 30, 2013 Applicant: Robert Sockwell | Permit type: New building | Permit status: Permit issued | Permit id: B1307339 | |||||
A hollow stem auger(hsa) will install sixteen temporary dewatering wells by advancing a 14 inch outer diameter/ inch inner diameter bore hole to a depth of feet. At depth, a 4 inch pvc flush joint, threaded well assembly will be set and select filter placed. Into each well will be installed a 2 hp turbine sunmersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharged as detailed on the temporary discharge authority permit. Date: September 17, 2014 Client: Republic Porperties Corporation | Applicant: Allison Johnson | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400411 | |||||
A hollow stem auger will install four temporary dewatering wells by advancing a 14 inch outer diameter and inch inner diameter bore hole to a depth of feet. At depth, a 4 inch pvc well assembly will be set and select filter placed. Into each well will be installed a 2 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling and discharged per tda permit. Date: November 6, 2014 Client: Republic Properties Corporation | Applicant: Allison Johnson | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500015 | |||||
ôhollow stem auger (hsa) will install ten (10) gravel packed wells by advancing an 18 inch outer diameter/12 1/4 inch inner diameter bore hole to a depth of feet. At depth, a 6 inch pvc well assembly will be set and select filter placed. Into each well will be installed a 5 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharge as detailed on the temporary discharge authorization permit 0714-1001.?? Date: December 1, 2014 Client: Republic Properties Corporation | Applicant: Allison Johnson | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500058 | |||||
Revise building permit no. B92884 -5/5/11 - a new 8-floor office building with a 2nd extension permit # b1301082 - 11/2/12 will be expired 5/5/13. Revisions include exterior facade redesign, and miscelaneous m/p/e and structural modifications, as per plans. No increase in scope of work, or size of building. Date: May 6, 2014 Applicant: Robert Sockwell | Permit type: New building | Permit status: Permit issued | Permit id: B1308464 | |||||
Minor revisions to issued sheeting and shoring permit sh140071, dated 7/3/14. Project under construction. Includes: revised tiebacks along north capitol street, delete inclinometers along north capitol street as unnecessary, and, provide drilled soldier beams on north capitol street, part of g street, and part of south interior property line, as per plans. No increase in excavation area and no change in projections or dimensions of work. All work below finished grade. Date: December 23, 2014 Applicant: Robert Sockwell | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1500011 | |||||
Install sheeting and shoring and excavate for new office building, as per plans, includes vault along g street nw Date: May 22, 2014 Applicant: Robert Sockwell | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1000021 | |||||
Towercrane for jobsite use Date: November 26, 2014 Client: Miller?long | Applicant: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tc1500003 | |||||
Revise permit sh1000021 dated 5/16/14. Minor change to bracing system at sw corner of property, revise tiebacks on north capitol street, extend soldier beam height on north capitol street and remove layback, add 6 foot wide 1:1 layback along south property line, add inclinometers on north capitol street and g street shoring lines - four at each street. Date: July 3, 2014 Applicant: Robert Sockwell | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1400071 | |||||
Electrical Date: October 1, 2014 Applicant: Michael F. Dugan | Permit status: Permit issued | Permit id: E1500021 | |||||
Plumbing and gas Date: November 6, 2015 Applicant: Joseph M Magnolia | Permit status: Permit issued | Permit id: P1601128 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile6hnnune%2f%2b6mj7olykcuaj Date: October 15, 2015 Applicant: Richard Collins; 6 North Capit Property; Robert Dike | Permit type: Electrical | Permit status: Permit issued | Permit id: E38998605 | |||||
A hollow stem auger(hsa) will install sixteen temporary dewatering wells by advancing a 14 inch outer diameter/ inch inner diameter bore hole to a depth of feet. At depth, a 4 inch pvc flush joint, threaded well assembly will be set and select filter placed. Into each well will be installed a 2 hp turbine sunmersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharged as detailed on the temporary discharge authority permit. Date: September 17, 2014 Client: Republic Porperties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400411 | |||||
A hollow stem auger will install four temporary dewatering wells by advancing a 14 inch outer diameter and inch inner diameter bore hole to a depth of feet. At depth, a 4 inch pvc well assembly will be set and select filter placed. Into each well will be installed a 2 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling and discharged per tda permit. Date: November 6, 2014 Client: Republic Properties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500015 | |||||
Hollow stem auger (hsa) will install ten (10) gravel packed wells by advancing an 18 inch outer diameter/12 1/4 inch inner diameter bore hole to a depth of feet. At depth, a 6 inch pvc well assembly will be set and select filter placed. Into each well will be installed a 5 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharge as detailed on the temporary discharge authorization permit 0714-1001. Date: December 1, 2014 Client: Republic Properties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500058 | |||||
SCORE 96 Electrical Date: October 1, 2014 Contractor: Michael F. Dugan Permit status: Completed | Permit id: E1500021 | |||||
SCORE 96 Electrical Date: August 7, 2014 Contractor: Michael F. Dugan Permit status: Permit issued | Permit id: E1407942 | |||||
SCORE 96 Plumbing and gas Date: November 3, 2014 Contractor: Joseph M Magnolia Permit status: Completed | Permit id: P1500915 | |||||
SCORE 96 Plumbing and gas Date: December 17, 2014 Contractor: Joseph M Magnolia Permit status: Completed | Permit id: P1502093 | |||||
A hollow stem auger will install an additional temporary dewatering wells to a depth of feet. At depth, a 6 inch well assembly will be set and select filter placed. Into each well will be installed a 5 hp submersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharged per temporary discharge authorization permit 0714-1001. Date: April 22, 2015 Client: Republic Properties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500189 | |||||
Abandonment of temporary dewatering wells. Date: July 16, 2015 Client: Republic Properties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500330 | |||||
Plumbing and gas Date: May 5, 2015 Permit status: Permit issued | Permit id: P1505607 | |||||
SCORE 96 Mechanical Date: September 14, 2015 Contractor: Andrew Correll Sickler Permit status: Completed | Permit id: M1503303 | |||||
SCORE 96 Plumbing and gas Date: December 24, 2015 Contractor: Joseph M Magnolia Permit status: Permit issued | Permit id: P1602420 | |||||
SCORE 96 Mechanical Date: April 26, 2016 Contractor: Timothy L Pepper Permit status: Permit issued | Permit id: M1601871 | |||||
SCORE 96 Plumbing and gas Date: April 26, 2016 Contractor: Thomas A Kelleher Permit status: Permit issued | Permit id: P1605733 | |||||
SCORE 96 Electrical Date: August 7, 2014 Contractor: Michael F. Dugan Permit status: Permit issued | Permit id: E1407942 | |||||
SCORE 96 Plumbing and gas Date: November 3, 2014 Contractor: Joseph M Magnolia Permit status: Completed | Permit id: P1500915 | |||||
SCORE 96 Plumbing and gas Date: December 17, 2014 Contractor: Joseph M Magnolia Permit status: Completed | Permit id: P1502093 | |||||
Hollow stem auger (hsa) will install ten (10) gravel packed wells by advancing an 18 inch outer diameter/12 1/4 inch inner diameter bore hole to a depth of feet. At depth, a 6 inch pvc well assembly will be set and select filter placed. Into each well will be installed a 5 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharge as detailed on the temporary discharge authorization permit 0714-1001. Date: December 1, 2014 Client: Republic Properties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500058 | |||||
A hollow stem auger(hsa) will install sixteen temporary dewatering wells by advancing a 14 inch outer diameter/ inch inner diameter bore hole to a depth of feet. At depth, a 4 inch pvc flush joint, threaded well assembly will be set and select filter placed. Into each well will be installed a 2 hp turbine sunmersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharged as detailed on the temporary discharge authority permit. Date: September 17, 2014 Client: Republic Porperties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400411 | |||||
A hollow stem auger will install four temporary dewatering wells by advancing a 14 inch outer diameter and inch inner diameter bore hole to a depth of feet. At depth, a 4 inch pvc well assembly will be set and select filter placed. Into each well will be installed a 2 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling and discharged per tda permit. Date: November 6, 2014 Client: Republic Properties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500015 | |||||
SCORE 100 Electrical Date: October 20, 2016 Contractor: Ralph Threatt Permit status: Permit issued | Permit id: E1700489 | |||||
SCORE 96 Mechanical Date: April 26, 2016 Contractor: Timothy L Pepper Permit status: Permit issued | Permit id: M1601871 | |||||
SCORE 96 Plumbing and gas Date: April 26, 2016 Contractor: Thomas A Kelleher Permit status: Permit issued | Permit id: P1605733 | |||||
SCORE 96 Plumbing and gas Date: April 13, 2016 Contractor: Thomas A Kelleher Permit status: Completed | Permit id: P1605375 | |||||
SCORE 100 Electrical Date: October 20, 2016 Contractor: Ralph Threatt Permit status: Permit issued | Permit id: E1700489 | |||||
SCORE 96 Plumbing and gas Date: November 3, 2014 Contractor: Joseph M Magnolia Permit status: Completed | Permit id: P1500915 | |||||
SCORE 96 3rd and final extension of building permit b92884, to expire on november 5, 2013. Date: May 30, 2013 Contractor: Robert Sockwell Permit type: New building | Permit status: Permit issued | Permit id: B1307339 | |||||
SCORE 89 Towercrane for jobsite use Date: November 26, 2014 Contractor: Miller Long Client: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tc1500003 | |||||
SCORE 96 2nd extension of building permit b92884, to expire on may 5, 2013. Date: November 2, 2012 Contractor: Robert Sockwell Permit type: New building | Permit status: Permit issued | Permit id: B1301082 | |||||
SCORE 92 A hollow stem auger will install four temporary dewatering wells by advancing a 14 inch outer diameter and inch inner diameter bore hole to a depth of feet. At depth, a 4 inch pvc well assembly will be set and select filter placed. Into each well will be installed a 2 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling and discharged per tda permit. Date: November 6, 2014 Contractor: Allison Johnson Client: Republic Properties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500015 | |||||
SCORE 92 A hollow stem auger(hsa) will install sixteen temporary dewatering wells by advancing a 14 inch outer diameter inch inner diameter bore hole to a depth of feet. At depth, a 4 inch pvc flush joint, threaded well assembly will be set and select filter placed. Into each well will be installed a 2 hp turbine sunmersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharged as detailed on the temporary discharge authority permit. Date: September 17, 2014 Contractor: Allison Johnson Client: Republic Porperties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400411 | |||||
SCORE 92 Hollow stem auger (hsa) will install ten (10) gravel packed wells by advancing an 18 inch outer diameter 12 1 4 inch inner diameter bore hole to a depth of feet. At depth, a 6 inch pvc well assembly will be set and select filter placed. Into each well will be installed a 5 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharge as detailed on the temporary discharge authorization permit 0714-1001. Date: December 1, 2014 Contractor: Allison Johnson Client: Republic Properties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500058 | |||||
SCORE 96 Electrical Date: August 7, 2014 Contractor: Michael F. Dugan Permit status: Permit issued | Permit id: E1407942 | |||||
SCORE 96 Electrical Date: October 1, 2014 Contractor: Michael F. Dugan Permit status: Completed | Permit id: E1500021 | |||||
SCORE 96 Plumbing and gas Date: November 3, 2014 Contractor: Joseph M Magnolia Permit status: Completed | Permit id: P1500915 | |||||
SCORE 96 Plumbing and gas Date: December 17, 2014 Contractor: Joseph M Magnolia Permit status: Completed | Permit id: P1502093 | |||||
SCORE 92 Abandonment of temporary dewatering wells. Date: July 16, 2015 Contractor: Allison Johnson Client: Republic Properties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500330 | |||||
SCORE 92 A hollow stem auger will install an additional temporary dewatering wells to a depth of feet. At depth, a 6 inch well assembly will be set and select filter placed. Into each well will be installed a 5 hp submersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharged per temporary discharge authorization permit 0714-1001. Date: April 22, 2015 Contractor: Allison Johnson Client: Republic Properties Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500189 | |||||
SCORE 96 Plumbing and gas Date: November 6, 2015 Contractor: Joseph M Magnolia Permit status: Permit issued | Permit id: P1601128 | |||||
SCORE 96 Plumbing and gas Date: December 24, 2015 Contractor: Joseph M Magnolia Permit status: Permit issued | Permit id: P1602420 | |||||
Plumbing and gas Date: May 5, 2015 Permit status: Permit issued | Permit id: P1505607 | |||||
SCORE 96 Mechanical Date: September 14, 2015 Contractor: Andrew Correll Sickler Permit status: Completed | Permit id: M1503303 | |||||
SCORE 93 Interior demolition to part of 4th elevator lobby for national assoc. Of counties demolition interior only. No change in use. No structural work involved. Approx. 3 sf. Date: March 3, 2016 Contractor: John Giusepperamco Permit type: Demolition | Permit status: Permit issued | Permit id: D1600397 | |||||
SCORE 89 Interior demolition on part of 1st and 5th floors for national league of cities interior work only, no struct. Work. No change in use. Approx. 3 sf. Date: March 3, 2016 Contractor: John Giuseppe Ramco Permit type: Demolition | Permit status: Permit issued | Permit id: D1600396 | |||||
SCORE 59 Preliminary permit for floor slab opening on the 4th floor for future convenience stair being installed under permit tl1600044, naco, per the attached arch. And struct. Dwgs. Interior work only. Date: March 14, 2016 Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1605516 | |||||
SCORE 59 Preliminary permit for floor slab opening on the 5th floor for future convenience stair being installed under permit tl1600045,nlc as shown on the attached arch. And struct. Dwgs. Interior work only. Date: March 14, 2016 Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1605515 | |||||
SCORE 56 New tenant construction on the 8th floor partial floor, structural scope with mechanical, electrical, plumbing. Approx. 8476 sf Date: September 6, 2016 Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1610090 | |||||
SCORE 56 After hours permit to work from 5am to 11pm saturday and sunday inconjunction with d-dot permit # 10252837 leave mobile crane in parking lane overnight Date: May 20, 2016 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600721 | |||||
SCORE 89 Tenant layout, first time construction of new office space for the national league of cities located on parts of the 4th floors and all of the 5th floor with a conference center located on part of the 1st floor along with a convenience stair between the 4th & 5th floors all as shown on the electronically submitted third party reviewed and approved mechanical, plumbing, electrical, fire protection, architectural and structural dwgs by aon. Interior work only. Date: April 8, 2016 Contractor: John Giuseppe Ramco Permit type: Tenant layout | Permit status: Completed | Permit id: Tl1600045 | |||||
SCORE 67 Tenant layout, construction of the first time office space for the national assoc. Of counties on all the the 3rd floor and part of the 4th floor with const. Of a new convenience stair between the 3rd and 4th floors all as shown on the third party reviewed and approved mech.,plumb., elect., fire protection, arch., and structural dwgs. By aon. Interior work only. Date: April 19, 2016 Contractor: John Giusepp Ramco Permit type: Tenant layout | Permit status: Permit issued | Permit id: Tl1600044 | |||||
SCORE 100 Electrical Date: October 20, 2016 Contractor: Ralph Threatt Permit status: Completed | Permit id: E1700489 | |||||
SCORE 96 Plumbing and gas Date: April 26, 2016 Contractor: Thomas A Kelleher Permit status: Completed | Permit id: P1605733 | |||||
SCORE 96 Plumbing and gas Date: April 13, 2016 Contractor: Thomas A Kelleher Permit status: Completed | Permit id: P1605375 | |||||
SCORE 96 Mechanical Date: April 13, 2016 Contractor: Timothy L Pepper Permit status: Completed | Permit id: M1601723 | |||||
SCORE 96 Revise building permit no. B92884 -5/5/11 - a new 8-floor office building with a 2nd extension permit # b1301082 - 11/2/12 will be expired 5/5/13. Revisions include exterior facade redesign, and miscelaneous m/p/e and structural modifications, as per plans. No increase in scope of work, or size of building. Date: May 6, 2014 Contractor: Robert Sockwell Permit type: New building | Permit status: Permit issued | Permit id: B1308464 | |||||
SCORE 96 Minor revisions to issued sheeting and shoring permit sh140071, dated 7/3/14. Project under construction. Includes: revised tiebacks along north capitol street, delete inclinometers along north capitol street as unnecessary, and, provide drilled soldier beams on north capitol street, part of g street, and part of south interior property line, as per plans. No increase in excavation area and no change in projections or dimensions of work. All work below finished grade. Date: December 23, 2014 Contractor: Robert Sockwell Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1500011 | |||||
SCORE 96 Revise permit sh1000021 dated 5/16/14. Minor change to bracing system at sw corner of property, revise tiebacks on north capitol street, extend soldier beam height on north capitol street and remove layback, add 6 foot wide 1:1 layback along south property line, add inclinometers on north capitol street and g street shoring lines - four at each street. Date: July 3, 2014 Contractor: Robert Sockwell Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1400071 | |||||
SCORE 86 Type of elevator one (1) traction /steel/central/ vertrical transportation (13th floor). Elevator #3. Date: August 7, 2015 Contractor: Mark A Dorsey Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1502824 | |||||
SCORE 86 Type of elevator one (1) traction /steel/central/ vertrical transportation (10th floor) elev #2. Date: August 7, 2015 Contractor: Mark A Dorsey Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1502825 | |||||
SCORE 86 Type of elevator three (3) traction /steel/centrally/ vertrical transportation (9th floor) Date: August 26, 2015 Contractor: Mark A Dorsey Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1502657 | |||||
SCORE 86 Type of elevator two (2) traction /steel/centrally/passenger (5th floor). Date: September 2, 2015 Contractor: Mark A Dorsey Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1503092 | |||||
SCORE 89 Afterhours to pour concrete with pump truck 2/24/2015 and 2/25/2015 from 11pm to 7am Date: February 24, 2015 Contractor: Miller Long Client: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500260 | |||||
SCORE 89 Afterhours to pour concrete with pump truck 2/4/2015 and 2/5/2015 from 11pm to 7am also 2/5/2015 and 2/6/2015 from 11pm to 7am Date: February 4, 2015 Contractor: Miller Long Client: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500228 | |||||
SCORE 89 Afterhours to pour concrete with pump truck friday 1/30/2015 at 10pm to 1/31/2015 till 11pm Date: January 30, 2015 Contractor: Miller Long Client: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500222 | |||||
SCORE 89 Afterhours to pour concrete from 1/23/2015 to 2/23/2015 from 1201am to 1159pm Date: January 22, 2015 Contractor: Miller Long Client: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500207 | |||||
SCORE 89 Afterhours to put up tower crane with 2 ton mobile crane saturday 1/31/2015 from 5am to 2/1/2015 to 9pm Date: January 27, 2015 Contractor: Miller Long Client: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500213 | |||||
SCORE 89 Afterhours to pour concrete on jobsite 2/11/2015 at 11pm till 7am 2/12/2015 Date: February 11, 2015 Contractor: Miller Long Client: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500240 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile6hnnune%2f%2b6mj7olykcuaj Date: March 22, 2016 Permit type: Electrical | Permit status: Completed | Permit id: E38998605 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildwqlf0h6h1ovmu0qgvwac%2f Date: May 20, 2016 Permit type: Electrical | Permit status: Permit issued | Permit id: E99357526 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilef9ku2dj5v51kjj4ha%2fjaz Date: June 22, 2016 Permit type: Electrical | Permit status: Permit issued | Permit id: E87622607 | |||||
SCORE 96 Revise issued building permit b1308464 dated 5/6/14 for new building under construction includes minor architectural, structural, and mep revision for coordination and integration of as-built conditions. No change to building height, area lot coverage, or volume. No change to approved use narrative provided to describe revision by sheet number Date: July 7, 2016 Contractor: Robert Sockwell Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1602614 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildbiborgnok9yx7e%2bnb8wml Date: April 25, 2016 Permit type: Electrical | Permit status: Permit issued | Permit id: E45120458 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcdiwuvl6qe2brx4g6iiuh2 Date: April 13, 2016 Contractor: Gary Mcvey; Alex Swan; Gary Mcvey Client: Alex Swan | Permit type: Electrical | Permit status: Permit issued | Permit id: E11087848 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/eservices. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc3wimx7uuzwtmdzkzbtn%2b2 Date: September 9, 2016 Client: Hyundai Rebublic Properties | Permit type: Electrical | Permit status: Permit issued | Permit id: E51894727 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/eservices. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc3wimx7uuzwbtkpx%2fifblt Date: September 14, 2016 Client: Republic Properties | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: P48732783 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/eservices. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilezjf8st%2f3fp4yt33lodh%2fe Date: October 27, 2016 Permit type: Electrical | Permit status: Permit issued | Permit id: E74360344 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https: ospi. Dcra. Dc. Gov ospi printpermit. Aspx? Param=zi8iggjeilfg%2f7wm%2bavphnacpb9ou4gz Date: August 2, 2016 Contractor: Daniel Bajer; Henry Bajer; Daniel Bajer Client: Henry Bajer | Permit type: Electrical | Permit status: Application canceled | Permit id: E60123880 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilef9ku2dj5v59dufua0qszd Date: July 6, 2016 Permit type: Electrical | Permit status: Completed | Permit id: E12255947 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcdiwuvl6qe2fuvon29xvvh Date: July 6, 2016 Permit type: Electrical | Permit status: Completed | Permit id: E14013256 | |||||
SCORE 96 Install sheeting and shoring and excavate for new office building, as per plans, includes vault along g street nw Date: May 22, 2014 Contractor: Robert Sockwell Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1000021 | |||||
SCORE 96 1st extension to building permit b92884 to expire november 5, 2012 Date: June 4, 2012 Contractor: Robert Sockwell Permit type: New building | Permit status: Permit issued | Permit id: B1209633 | |||||
SCORE 93 Plumbing and gas Date: May 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1606334 | |||||
SCORE 93 Plumbing and gas Date: May 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1606334 | |||||
SCORE 93 Plumbing and gas Date: May 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1606334 | |||||
SCORE 93 Plumbing and gas Date: May 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1606335 | |||||
SCORE 93 Plumbing and gas Date: May 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1606335 | |||||
SCORE 96 Electrical Date: May 17, 2016 Contractor: David C. Williams Permit status: Completed | Permit id: E1606487 | |||||
SCORE 96 Electrical Date: May 17, 2016 Contractor: David C. Williams Permit status: Completed | Permit id: E1606487 | |||||
SCORE 96 Electrical Date: May 17, 2016 Contractor: David C. Williams Permit status: Completed | Permit id: E1606487 | |||||
SCORE 93 Plumbing and gas Date: April 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1605460 | |||||
SCORE 93 Plumbing and gas Date: April 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1605460 | |||||
SCORE 93 Plumbing and gas Date: April 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1605460 | |||||
SCORE 93 Plumbing and gas Date: April 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1605461 | |||||
SCORE 93 Plumbing and gas Date: April 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1605461 | |||||
SCORE 93 Plumbing and gas Date: April 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1605461 | |||||
SCORE 93 Plumbing and gas Date: April 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1605463 | |||||
SCORE 93 Plumbing and gas Date: April 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1605463 | |||||
SCORE 93 Plumbing and gas Date: April 18, 2016 Contractor: Rob Hohl Permit status: Permit issued | Permit id: P1605463 |