Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 77 Demo entire bathroom. Remove bath tub and frame for new tile shower stall and built in storage unit. Install fire proofing as needed and install new fiberglass insulation. Blueboard and plaster. Install new tile floor. Provide and install new vanity. Toilet and sink are to remain in same location. Permit type: Addition/alteration | Completion date: February 20, 2014 | Current use: One-family | Parcel: 220184 | |||||
SCORE 77 Demo tub area for new tub and tile. Install new fan light unit above tub. Insulate all exposed out side walls. Install new shower valve and toilet. Build and install new vanity and towel niche to the left of the vanity. Apply new tile to floor. Permit type: Addition/alteration | Completion date: January 27, 2015 | Current use: One-family | Parcel: 220184 |