Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning use permit ![]() Client: Desantis Development Corp | Permit status: Completed | Permit id: 218155 | |||||
Zoning permit ![]() Client: Spinelli Alfonso | Permit status: Completed | Permit id: 259095 | |||||
Electrical permit ![]() Client: Spinelli Alfonso | Permit status: Completed | Permit id: 295190 | |||||
Zoning permit ![]() Client: Desantis Development Corp | Permit status: Completed | Permit id: 211087 | |||||
Mechanical permit ![]() Client: Spinelli Alfonso | Permit status: Completed | Permit id: 295497 | |||||
Plumbing permit ![]() Client: Spinelli Alfonso | Permit status: Completed | Permit id: 283698 | |||||
New construction permit ![]() Client: Spinelli Alfonso | Permit status: Completed | Permit id: 261128 | |||||
Zoning admin review ![]() Client: Desantis Development Corp | Permit status: Completed | Permit id: 253335 | |||||
Permit for the complete demolition of all existing structures; for the relocation of lot lines to create twenty-one (21) new lots from twenty-seven (27) existing lots (thirteen (13) existing brt addresses); lots 1-19: for the erection of a three (3) story attached structure (38-3 " high, no cellar or basement, with a cathedral ceiling) to include a rear yard deck at the second floor level and an interior garage, for use as a single family dwelling on each lot, all lots having a driveway easement to access the rear interior garage; lots 3, 8, 10, 12, 14, 16 and 18 having a front balcony at the second floor level; lot shall remain vacant for storm water management and lot 21 shall remain vacant; and for the extension and widening of keely street in accordance with ordinance #080903. ![]() Client: Desantis Development Corp | Applicant: Carl S. Primavera, Esquire | Permit type: Appeal | Permit status: Granted | Permit id: 8920 | |||||
Requesting an administrative review to increase lot # (to manage storm water) in order to meet water dept. Requirements. In order to increase the size of lot # the rear portion of lots #8 thru #18 will be reduced and allocated to lot#20. Minor changes to lot area on lots #1 thru #7 have occured due to the placement on the new keely court by the city surveyor. ![]() Client: Esantis Development Corp | Permit type: Zoning permit | Permit status: Completed | Completion date: February 1, 2010 | Permit id: 259091 | |||||
Relocate lot lines to create (21) lots from (27) (13 brt addresses) and the former houston st. Erect (19) sfds on lots 1 thru 19 one on each lot with driveway easement ot access rear garage, with rear yard deck, lots #3,8,10,12,14,16, and 18 to have balcony at 2nd fl. Front with roof. Lot to remain vacant for storm water management. Lot 21 to remain vacant ordinance #080903 is widening and extending keely st. ![]() Client: Esantis Development Corp | Permit type: Zoning permit | Permit status: Completed | Completion date: June 3, 2009 | Permit id: 218082 | |||||
SCORE 89 Install one 75,0 btu, gas fired, plus, warm air hvac unit within single family dwelling. Permit to include related system ductwork. ![]() ![]() Client: Spinelli Alfonso | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 23, 2011 | Permit id: 295497 | |||||
SCORE 100 New construction of sfd: install (24)switches, 2 amp service, (31)lights, (1)a c unit- power only, smoke detectors...... In accordance with 2008 nec ![]() ![]() Client: Spinelli Alfonso | Permit type: Electrical permit | Permit status: Completed | Completion date: April 27, 2011 | Permit id: 295190 | |||||
SCORE 89 Ct,tai,md,3wc, 1ks, 1 storm pipe, 3 shower bathroom, 3 lavatories ![]() ![]() Client: Spinelli Alfonso | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 23, 2011 | Permit id: 283698 | |||||
Construction of a single family dwelling ![]() Client: Spinelli Alfonso | Permit type: New construction permit | Permit status: Completed | Completion date: February 23, 2011 | Permit id: 261128 |