Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 75 Crane, boom, pump truck Date: May 6, 2009 Contractor: Colantonio Inc Permit id: Cbp11384 | |||||
SCORE 100 Excavation Date: November 4, 2013 Contractor: Cambridge Water Department Permit id: Exc18742 | |||||
Excavation Date: November 17, 2009 Permit id: Exc13783 | |||||
SCORE 60 Remove existing horsehair plaster and laths from 6 ceilings. Reframe ceiling spaces by sistering with 2x8 framing . Strapping of ceilings, insulation with roxul 3 inches thick. 1 2 inch sheetrock will be installed on all ceilings. Tape and joint compound. Permit type: Addition/alteration | Completion date: August 2, 2016 | Current use: Two-family | Permit id: 0 | Parcel: 25826 | |||||
SCORE 95 Install 4 replacement windows no structural changes Permit type: Addition/alteration | Completion date: February 6, 2017 | Current use: Townhouse | Permit id: 0 | Parcel: 258453 | |||||
SCORE 65 Excavation Date: November 17, 2009 Contractor: Joseph Botti Co., Inc Permit id: Exc13783 |