Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit Date: June 3, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 449495 | |||||
Electrical permit Date: December 1, 2015 Client: Post Rittenhouse Hill Lp | Permit status: Expired | Permit id: 623604 | |||||
Demolition permit Date: September 22, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 364034 | |||||
Administrative permit Date: May 10, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 404449 | |||||
New construction permit Date: July 1, 2015 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 615195 | |||||
Alteration permit Date: August 19, 2009 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 229898 | |||||
Administrative permit Date: December 30, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 381160 | |||||
Suppression permit Date: June 1, 2007 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 70408 | |||||
Addition permit Date: August 3, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 397499 | |||||
Mechanical permit Date: October 4, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 496978 | |||||
Plumbing permit Date: November 26, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 499688 | |||||
Demolition permit Date: February 1, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 386059 | |||||
Administrative permit Date: July 11, 2008 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 164063 | |||||
Electrical permit Date: February 17, 2010 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 259435 | |||||
Plumbing permit Date: December 23, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 380300 | |||||
Zoning/use permit Date: June 12, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 404782 | |||||
Plumbing permit Date: May 25, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 407390 | |||||
Zoning/use permit Date: May 27, 2015 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 606075 | |||||
Alteration permit Date: July 22, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 343675 | |||||
Electrical permit Date: May 26, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Expired | Permit id: 340351 | |||||
Alteration permit Date: September 20, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 427586 | |||||
Administrative permit Date: August 19, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 490088 | |||||
Electrical permit Date: April 5, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 376829 | |||||
Electrical permit Date: August 13, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 452896 | |||||
Suppression permit Date: April 29, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 338222 | |||||
Suppression permit Date: October 16, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 432877 | |||||
Zoning/use permit Date: May 13, 2009 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 210719 | |||||
Demolition permit Date: January 30, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 449498 | |||||
Plumbing permit Date: November 9, 2015 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 643261 | |||||
Use permit Date: August 2, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 356077 | |||||
Suppression permit Date: July 16, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 469712 | |||||
Mechanical permit Date: December 6, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 376137 | |||||
Use permit Date: July 17, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 416847 | |||||
Zoning permit Date: January 29, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 449497 | |||||
Alteration permit Date: January 22, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 435492 | |||||
Electrical permit Date: May 23, 2008 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 151682 | |||||
Permit for the partial demolition of a one story addition and for the erection of a one story addition 24-7 " high above the garage level as part of an existing six hundred seventy two (672) dwelling units and for the increase in accessory parking spaces for a new total of seven hundred three (703) spaces including eight (8) handicap spaces (9x18 each). Date: February 23, 2012 Client: Post Rittenhouse Hill Lp | Applicant: Carl Primavera, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: March 19, 2012 | Permit id: 17297 | |||||
Permit for the erection of two (2) accessory free standing signs 3-10" high each as part of an existing six hundred twenty four (624) dwelling units accessory parking spaces (size and location as shown in the application). Date: April 22, 2013 Client: Post Rittenhouse Hill Lp | Applicant: Ronald J. Patterson, Esq | Permit type: Appeal | Permit status: Granted | Completion date: June 12, 2013 | Permit id: 20315 | |||||
The notice refers to alleged violations related to asbestos control. All of appellants work on the site has been conducted in compliance with all asbestos laws and regulations, and appellant denies all alleged violations. Date: March 8, 2012 Client: Post Rittenhouse Hill Lp | Applicant: Julie Beddingfield | Permit type: Appeal | Permit status: Withdrawn | Permit id: 17246 | |||||
Demolition permit Date: May 27, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 343673 | |||||
Zoning use permit Date: May 13, 2009 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 210719 | |||||
Demolition permit Date: January 30, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 449498 | |||||
Plumbing permit Date: May 25, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 407390 | |||||
Electrical permit Date: April 22, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 466511 | |||||
Plumbing permit Date: November 9, 2015 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 643261 | |||||
Mechanical permit Date: December 6, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 376137 | |||||
Administrative permit Date: December 30, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 381160 | |||||
Electrical permit Date: April 5, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 376829 | |||||
Zoning use permit Date: June 30, 2015 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 621367 | |||||
Administrative permit Date: May 10, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 404449 | |||||
Suppression permit Date: June 1, 2007 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 70408 | |||||
Administrative permit Date: December 6, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 509872 | |||||
Plumbing permit Date: December 23, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 375276 | |||||
Plumbing permit Date: August 8, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 488007 | |||||
Alteration permit Date: June 12, 2009 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 216829 | |||||
Addition permit Date: August 3, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 397499 | |||||
Mechanical permit Date: October 4, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 496978 | |||||
Electrical permit Date: May 23, 2008 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 151682 | |||||
Alteration permit Date: August 3, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 413378 | |||||
Alteration permit Date: July 22, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 343675 | |||||
Alteration permit Date: January 22, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 435492 | |||||
Use permit Date: July 17, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 416847 | |||||
Electrical permit Date: May 26, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Expired | Permit id: 340351 | |||||
Demolition permit Date: February 1, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 386059 | |||||
Zoning use permit Date: June 3, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 449495 | |||||
Suppression permit Date: October 16, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 432877 | |||||
Use permit Date: August 2, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 356077 | |||||
Electrical permit Date: December 1, 2015 Client: Post Rittenhouse Hill Lp | Permit status: Expired | Permit id: 623604 | |||||
Suppression permit Date: April 29, 2011 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 338222 | |||||
Electrical permit Date: February 17, 2010 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 259435 | |||||
Zoning permit Date: January 29, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 449497 | |||||
Zoning use permit Date: March 28, 2012 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 378807 | |||||
Administrative permit Date: July 11, 2008 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 164063 | |||||
New construction permit Date: July 1, 2015 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 615195 | |||||
Suppression permit Date: July 16, 2013 Client: Post Rittenhouse Hill Lp | Permit status: Completed | Permit id: 469712 | |||||
The notice refers to alleged violations related to asbestos control. All of appellants work on the site has been conducted in compliance with all asbestos laws and regulations, and appellant denies all alleged violations. Date: March 8, 2012 Client: Post Rittenhouse Hill Lp | Applicant: Julie Beddingfield | Permit type: Appeal | Permit status: Withdrawn | Permit id: 17246 | |||||
Permit for the erection of two (2) accessory free standing signs 3-10" high each as part of an existing six hundred twenty four (624) dwelling units accessory parking spaces (size and location as shown in the application). Date: April 22, 2013 Client: Post Rittenhouse Hill Lp | Applicant: Ronald J. Patterson, Esq | Permit type: Appeal | Permit status: Granted | Completion date: June 12, 2013 | Permit id: 20315 | |||||
Permit for the partial demolition of a one story addition and for the erection of a one story addition 24-7 " high above the garage level as part of an existing six hundred seventy two (672) dwelling units and for the increase in accessory parking spaces for a new total of seven hundred three (703) spaces including eight (8) handicap spaces (9x18 each). Date: February 23, 2012 Client: Post Rittenhouse Hill Lp | Applicant: Carl Primavera, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: March 19, 2012 | Permit id: 17297 | |||||
For the partial demolition of a one story addition and for the erection of a one story addition 24-7 ?" high above the garage level as part of an existing six hundred seventy two (672) dwelling units and for the increase in accessory parking spaces for a new total of seven hundred three (703) spaces including eight (8) handicap spaces (9x18 each) (size and location as shown in the application). Date: March 28, 2012 Client: Post Rittenhouse Hill Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 28, 2012 | Permit id: 378807 | |||||
SCORE 100 164 fixters with piping for 12 floor plans are with ap # 375276 Date: December 23, 2011 Contractor: Terry Abrams Client: Post Rittenhouse Hill Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 30, 2015 | Permit id: 380300 | |||||
SCORE 100 Permit to remove five underground storage tanks, all previously closed-in -place. Date: February 1, 2012 Contractor: React Environmental Prof Servi Client: Post Rittenhouse Hill Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: March 14, 2012 | Permit id: 386059 | |||||
SCORE 100 Install 13. 2v service, distribution, transformers, meter banks, feeders & panels per plans & 2008 nec. Date: July 13, 2012 Contractor: Major Electric Systems Inc Client: Post Rittenhouse Hill Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 4, 2015 | Permit id: 391886 | |||||
SCORE 92 Creation of addition and interior renovations. Separate permit is required for certificate of occupancy. Date: August 3, 2012 Contractor: Apollo Cmg Client: Post Rittenhouse Hill Lp | Permit type: Addition permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 397499 | |||||
SCORE 92 Install 2 roof top air conditioning units, associated ductwork and diffusers, and bathroom exhast systems (fans, duct and registers) for hi-rise residential tower to comply violation case #402697. Date: October 4, 2013 Contractor: Apollo Cmg Client: Post Rittenhouse Hill Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 496978 | |||||
SCORE 88 Complete demolition of four (4) one story, masonry, concrete & wood accessory pool buildings by mechanical methods. All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with philadelphia administrative code. No sidewalk closure required. Any deviation will require an amended building permit. Permit received from downstairs Date: July 28, 2017 Contractor: Alliance Environmental Sys Inc Client: Post Rittenhouse Hill Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: September 19, 2017 | Permit id: 796017 | |||||
Remove 3 antennas and 2 equipment cabinets, erect 3 antennas and 9 rrns, retrofit 1 equipment cabinet Date: July 30, 2012 Client: Post Rittenhouse Hill Lp | Permit type: Alteration permit | Permit status: Revoked | Completion date: June 5, 2014 | Permit id: 417331 | |||||
T. C. O. For 1st thru 7th floors, days. Date: August 7, 2013 Client: Post Rittenhouse Hill Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: January 16, 2015 | Permit id: 487684 | |||||
SCORE 92 Interior demolition - 295 apartments interior demolition of non load bearing walls and ceilings only. No other work allowed under this permit. Contact streets department for dumpster permit and footway closure. No demolition to fire rated assemblies. Three sets of plans drawn to professional quality are to be submitted for review and approval by the department before work on renovation starts. Date: April 5, 2012 Contractor: Apollo Cmg Client: Post Rittenhouse Hill Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: August 12, 2013 | Permit id: 397826 | |||||
Increase number of units from 576 to 672 Date: August 2, 2011 Client: Post Rittenhouse Hill Lp | Permit type: Use permit | Permit status: Completed | Completion date: August 2, 2011 | Permit id: 356077 | |||||
SCORE 93 Interior demolition non load bearing interior partitions only. Date: September 22, 2011 Contractor: Ccp Construction Co Llc Client: Post Rittenhouse Hill Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: October 23, 2012 | Permit id: 364034 | |||||
SCORE 100 Remodel existing apts, 384 water closets, 288 kitchen sinks, 384 showers, 384 lavs, 288 washing machines (apartment building) Date: December 23, 2011 Contractor: Terry Abrams Client: Post Rittenhouse Hill Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 20, 2015 | Permit id: 375276 | |||||
SCORE 96 New construction of a two (2) story, one hundred thirty-nine (139) car open parking garage as per approved plans. Building not required to be sprinklered. Separate permits required for any mep work Date: July 1, 2015 Contractor: Post General Contracting Llc Client: Post Rittenhouse Hill Lp | Permit type: New construction permit | Permit status: Completed | Completion date: December 29, 2015 | Permit id: 615195 | |||||
SCORE 88 For the complete demolition of four (4) existing detached accessory structures. Size and location as shown in application. See a p 796017 for plans Date: July 28, 2017 Contractor: Alliance Environmental Sys Inc Client: Post Rittenhouse Hill Lp | Permit type: Zoning permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 796014 | |||||
For the erection of a detached structure. Size and location as shown in application. For use as accessory parking [reconfiguration of existing surface parking and creation of new garage parking; new total of seven hundred ninety-one (791) parking spaces including seventeen (17) existing accessible spaces and forty (40) new compact spaces] for an existing multi-family household living. No signs on this permit. Date: June 30, 2015 Client: Post Rittenhouse Hill Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 30, 2015 | Permit id: 621367 | |||||
SCORE 100 Convert six dry standpipes to automatic wet standpipes. Install fire pump and backflow preventer. Date: March 2, 2007 Contractor: Oliver Sprinkler Co Inc Client: Post Rittenhouse Hill Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: September 16, 2008 | Permit id: 54607 | |||||
For the creation of one(1) story addition a top of an existing accessory surface parking spaces (upper level parking deck) ; for the creation of eighty-five new off-street parking spaces ( 74 parking spaces including with 18 compact spaces at 2nd floor and eleven(11) proposed parking spaces and existing 54 off-street parking spaces at first floor ( total 65 parking spaces at first floor ) on the same lot existing 706 accessory parking spaces including with 17 h c spaces as previously approved.( total 791 parking spaces on lot ). Size and location as shown in the application. For an existing multi-family household living ( six hundred twenty four (624) dwelling units ) with total 791 parking spaces including with 17 h c spaces with all other uses including with signage as previously approved. Date: May 27, 2015 Client: Post Rittenhouse Hill Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 10, 2015 | Permit id: 606075 | |||||
SCORE 93 Temporary certificate of occupancy for 10th and 11th floors in tower a. Date: May 31, 2012 Contractor: Ccp Construction Co Llc Client: Post Rittenhouse Hill Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 4, 2014 | Permit id: 407904 | |||||
SCORE 96 Remove cabana building demolition activity not to commence prior to 2 20 13 Date: January 30, 2013 Contractor: Post General Contracting Llc Client: Post Rittenhouse Hill Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: October 11, 2014 | Permit id: 449498 | |||||
Interior demolition of non-load bearing walls for multi-family dwelling. Date: May 27, 2011 Client: Post Rittenhouse Hill Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: August 13, 2013 | Permit id: 343673 | |||||
Interior renovation as per plan to include new bearing interior partitions and finishes within portion of apartment building Date: July 22, 2011 Client: Post Rittenhouse Hill Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: November 9, 2012 | Permit id: 343675 | |||||
SCORE 100 Replace the hot, cold and hot water return water supply mains in the basement Date: April 13, 2012 Contractor: Adelphia Plumbing And Htng Corp Client: Post Rittenhouse Hill Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 3, 2015 | Permit id: 398161 | |||||
SCORE 100 Lower level pump room - installation of (3)three hi-efficiency domestic hot water heaters Date: May 25, 2012 Contractor: Adelphia Plumbing And Htng Corp Client: Post Rittenhouse Hill Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 2, 2013 | Permit id: 407390 | |||||
SCORE 100 (pa. Phl 5846) 2 outdoor telco cabinets, 6 lines of 1 5 8 commscope coax, all lines runs 215 ft 1 gps antenna with 1 2" coax 2 as per 2005 nec. Date: February 17, 2010 Contractor: Landair Wireless Ltd Client: Post Rittenhouse Hill Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: April 13, 2010 | Permit id: 259435 | |||||
SCORE 100 Installation of fire supression system in lobby in accordance with nfpa 13 Date: July 16, 2013 Contractor: B. M. Consulting Services Inc Client: Post Rittenhouse Hill Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 469712 | |||||
SCORE 100 Installing (3) gallon solar holding tanking for pool heater (mixed use) Date: August 8, 2013 Contractor: Thomas Quagliarello Client: Post Rittenhouse Hill Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 26, 2013 | Permit id: 488007 | |||||
SCORE 96 Installation of hvac equipment and associated duct work for lobby and two fitness rooms at rittenhouse hill apartments Date: October 2, 2013 Contractor: Post General Contracting Llc Client: Post Rittenhouse Hill Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 27, 2014 | Permit id: 496689 | |||||
SCORE 100 Remove curb trap, seal lateral in grass area pa one call# 2017-164 3864 Date: July 12, 2017 Contractor: Suburban Heating And Plumbing Client: Post Rittenhouse Hill Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 14, 2017 | Permit id: 798834 | |||||
Make safe permit - remove debris from collapsed retaining wall to comply case #578895. No other work on this permit. Permit received from downstairs 7 17 17 Date: July 17, 2017 Client: Post Rittenhouse Hill Lp | Permit type: Alteration permit | Permit status: Active | Completion date: July 28, 2017 | Permit id: 800504 | |||||
SCORE 100 Install new kitchens, bathrooms, laundry rms in each apt throughout bldg, install new waste stacks, small fixture waste lines, new cold & hot risers & supplies (high rise apts) Date: November 20, 2012 Contractor: Ferman Mc Gee Client: Post Rittenhouse Hill Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 29, 2014 | Permit id: 437160 | |||||
SCORE 100 Relocate existing sprinkler heads Date: October 16, 2012 Contractor: B. M. Consulting Services Inc Client: Post Rittenhouse Hill Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 432877 | |||||
SCORE 79 Reconstruction of an existing outdoor swimming pool as per plan. Date: January 22, 2013 Contractor: Armond Pools Inc Client: Post Rittenhouse Hill Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 5, 2014 | Permit id: 435492 | |||||
Temporay certificate of occupancy for days. .... Date: August 16, 2012 Client: Post Rittenhouse Hill Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 420917 | |||||
SCORE 92 Erosion and sediment site work as per submitted sealed plans. Plumbing work requires additional permits. Call the inspector prior to starting work. Date: September 20, 2012 Contractor: Apollo Cmg Client: Post Rittenhouse Hill Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 427586 | |||||
SCORE 100 Site work install catch basins and piping (apt bldg) - note: this permit was amended by administrative permit #509872 on 12 06 2013 to reduce the original scope of work - note: this permit was amended under administrative building permit #509872 to show that the contractor is only installing inlets "n" & "m" - the failure to complete the original approved storm sitework plan may affect the ability of the owner to received a certificate of occupancy under building permit #363737 Date: November 26, 2013 Contractor: Anthony S. Rachuba Jr Client: Post Rittenhouse Hill Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 499688 | |||||
Application for a temporay certificate of occupancy ( days) for floors 7 , 8 & 9. Date: July 11, 2012 Client: Post Rittenhouse Hill Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 415450 | |||||
SCORE 92 Alterations renovations tower b 312 apartment units to include 7 type a accessible units (phase two)in accordance w chapter 34 - section 34 compliance alternatives Date: August 3, 2012 Contractor: Apollo Cmg Client: Post Rittenhouse Hill Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 413378 | |||||
SCORE 99 2 level car garage with 4 rain conductors and 2 area drains (all work to comply with the 2004 philadelphia plumbing code) Date: November 9, 2015 Contractor: Falcone And Truman Plumbing Inc Client: Post Rittenhouse Hill Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 4, 2016 | Permit id: 643261 | |||||
SCORE 100 Install new wiring for 308 apts(studio, 1 & 2 bedroom)connect appliances light fixtures ( recepts, dishwasher, switches, 6 light fixtures , dryer & washer outlet) as per 2008 nec (north district) high rise residential Date: April 5, 2012 Contractor: Vtech Electric Inc Client: Post Rittenhouse Hill Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 6, 2014 | Permit id: 376829 | |||||
SCORE 100 Furn install a fa pnl to monitor the new fa devices for a sprin standpipe. New fa pnl shall be monitored by existing fa contr pnl. Furn install fa cabling dev. To mon. The new fire pump sprink. Points,prov. Elect to jockey pump, as per 2005 nec nfpa-72 (north dist) Date: May 23, 2008 Contractor: Electracom Inc Client: Post Rittenhouse Hill Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: June 3, 2010 | Permit id: 151682 | |||||
SCORE 100 Install electrical wiring for 312 apts at tower b", install recepts, switches, light fixtures as per 2008 nec (apt bldg w comm) Date: August 13, 2013 Contractor: Vtech Electric Inc Client: Post Rittenhouse Hill Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 6, 2014 | Permit id: 452896 | |||||
SCORE 99 Installation of new pool wiring, bonding & grounding as per article 6 of the 2008 nec addl permits required for feeders to this new equipment as per nec 2008 (comm) Date: April 22, 2013 Contractor: Gulliford Electric Company Client: Post Rittenhouse Hill Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 27, 2013 | Permit id: 466511 | |||||
SCORE 100 Amend existing plumbing storm sitework permit #499688 to show that the contractor is only installing inlets "n" & "m" - note: the failure to complete the original approved storm sitework plan may affect the ability of the owner to received a certificate of occupancy under building permit #363737 Date: December 6, 2013 Contractor: Anthony S. Rachuba Jr Client: Post Rittenhouse Hill Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 509872 | |||||
: certificate of occupancy not required memo for an existing single family dwelling (r-3) to be used as a residence for two unrelated persons living as a family(r-3). Date: July 11, 2008 Client: Post Rittenhouse Hill Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 7, 2008 | Permit id: 164063 | |||||
SCORE 100 Apt. Building - replace 15 sprinkler heads. Date: April 29, 2011 Contractor: B. M. Consulting Services Inc Client: Post Rittenhouse Hill Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: August 27, 2012 | Permit id: 338222 | |||||
SCORE 100 Installation of horns - existing fire system, as per nfpa-72 Date: May 26, 2011 Contractor: B H Holding Company Client: Post Rittenhouse Hill Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 5, 2017 | Permit id: 340351 | |||||
SCORE 99 Install new amp electrical panel, install surface mounted & post mounted light fixtures in new garage structure Date: December 1, 2015 Contractor: Hi Lite Electrical Contractors Client: Post Rittenhouse Hill Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: December 1, 2015 | Permit id: 623604 | |||||
SCORE 100 Branch wiring and fixtures throughout 1st floor lobby and landscaping lights in the back yard as per 2008 nec (apt bldg) Date: July 3, 2013 Contractor: Major Electric Systems Inc Client: Post Rittenhouse Hill Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: March 11, 2014 | Permit id: 474727 | |||||
SCORE 100 Install 2 ada ladies and men rooms install new drinking fountains install new mop sink, fountain sink and 3" floor drain install new 4" stack vent Date: April 10, 2013 Contractor: Ferman Mc Gee Client: Post Rittenhouse Hill Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 458110 | |||||
SCORE 100 Install (3) fire hydrants and piping for towers Date: June 1, 2007 Contractor: Oliver Sprinkler Co Inc Client: Post Rittenhouse Hill Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: September 16, 2008 | Permit id: 70408 | |||||
SCORE 93 Alterations renovations tower a 311 apartment units to include 7 type a accessible units (phase one)in accordance w chapter 34 - section 34 compliance alternatives Date: October 27, 2011 Contractor: Ccp Construction Co Llc Client: Post Rittenhouse Hill Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 363737 |