Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Date: May 24, 2001 Permit status: Closed | Permit id: 00-03959 | |||||
SCORE 90 Comment date: fri aug 18 00:00: edt 20 - single family residence, head master, basement not included at this time; comment date: mon aug 28 00:00: edt 20 - amendment to add full basement. Pmd 8/28/00; Client: Head Master Residence | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 00-03959 | Parcel: 49884 | |||||
Single family residence, head master, basement not included at this time; amendment to add full basement. Pmd 8/28/00; 6 faculty drive jsb; front setbacks to be measured from the existing right of way line. Side and rear setbacks are to be measured from property lines. Setbacks also apply to porches, decks, etc.; approved by natalie berry under original zoning approval permit # 00-3132. Pmd; building comments the approved plans with the review checklist and review comments are required to be on the jobsite for use by the field inspector(s). The building permit is required to be posted on the jobsite before an inspection can be made. The "energy compliance worksheet" attached to the approved plans shall be completed, signed, and returned to the building inspector before the insulation inspection can be approved. Refer to the review comments attached to the drawings re: 1. Anchor bolts 2. Footing drain detail 3. Under-slab termite treatment 4. M Permit type: Permits - historical | Permit status: Closed | Permit id: 00-03959 | Parcel: 49884 | |||||
Historical Date: May 24, 2001 Value: $249,643 Permit status: Closed | Permit id: 00-03959 | |||||
SCORE 100 Comment date: fri aug 18 00:00: edt 20 - single family residence, head master, basement not included at this time; comment date: mon aug 28 00:00: edt 20 - amendment to add full basement. Pmd 8/28/00; Client: Head Master Residence | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 00-03959 | Parcel: 49884 | |||||
SCORE 100 Comment date: fri aug 18 00:00: edt 20 - single family residence, head master, basement not included at this time; comment date: mon aug 28 00:00: edt 20 - amendment to add full basement. Pmd 8/28/00; Client: Head Master Residence | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 00-03959 | Parcel: 49884 | |||||
Single family residence, head master, basement not included at this time; amendment to add full basement. Pmd 8 28 00; 6 faculty drive jsb; front setbacks to be measured from the existing right of way line. Side and rear setbacks are to be measured from property lines. Setbacks also apply to porches, decks, etc.; approved by natalie berry under original zoning approval permit # 00-3132. Pmd; building comments the approved plans with the review checklist and review comments are required to be on the jobsite for use by the field inspector(s). The building permit is required to be posted on the jobsite before an inspection can be made. The "energy compliance worksheet" attached to the approved plans shall be completed, signed, and returned to the building inspector before the insulation inspection can be approved. Refer to the review comments attached to the drawings re: 1. Anchor bolts 2. Footing drain detail 3. Under-slab termite treatment 4. M Date: May 24, 2001 Permit type: Permits - historical | Permit status: Closed | Permit id: 00-03959 | Parcel: 49884 | |||||
SCORE 100 Comment date: fri aug 18 00:00: edt 20 - single family residence, head master, basement not included at this time; comment date: mon aug 28 00:00: edt 20 - amendment to add full basement. Pmd 8/28/00; Client: Head Master Residence | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 00-03959 | Parcel: 49884 |