Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp Date: March 12, 2012 Permit status: Closed | Permit id: 12-00563 | |||||
SCORE 100 Wellington mhp Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-00563 | Parcel: 6073 | |||||
SCORE 100 Wellington mhp Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-00563 | Parcel: 6073 | |||||
SCORE 96 Wellington mhp Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-00563 | Parcel: 6073 | |||||
SCORE 99 Wellington mhp Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-00563 | Parcel: 6073 | |||||
February 1, 2012 11:02:18 am kneel. Wellington mhp - new mh to lot, master zoning approval 09-6160, 78 for me permit. Location: off airport rd to wellington mhp.; february 2, 2012 12:30:29 pm kneel. Permit on hold pending payment for me permit, e-mail sent to leigh at wellington mhp.; march 12, 2012 10:27: am kneel. Wellington mhp - new mh to lot, master zoning approval 09-6160.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Sol Permit type: Permits - historical | Permit status: Closed | Permit id: 12-00563 | Parcel: 6073 | |||||
Wellington mhp Date: March 12, 2012 Value: $9,000 Permit type: Historical | Permit status: Closed | Permit id: 12-00563 | |||||
February 1, 2012 11:02:18 am kneel. Wellington mhp - new mh to lot, master zoning approval 09-6160, 78 for me permit. Location: off airport rd to wellington mhp.; february 2, 2012 12:30:29 pm kneel. Permit on hold pending payment for me permit, e-mail sent to leigh at wellington mhp.; march 12, 2012 10:27: am kneel. Wellington mhp - new mh to lot, master zoning approval 09-6160.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Sol Date: March 12, 2012 Permit type: Permits - historical | Permit status: Closed | Permit id: 12-00563 | Parcel: 6073 |