Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 To remove the existing roof deck boards put deck frame aside to acess roof. Put frame back in place and install new 2 inch by six pressure treated boards after new roof application is done. Remove top layer of rubber roofing and replace it with a new single-ply epdm (rubber) roof system. Remove rotted wood at threshold and replace it with new wood and new metal threshold plate. Work to be done at second floor rear roof section. Permit type: Roofing | Permit status: Expired | Current use: 1-3fam | Permit id: Sf295673 |