Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit Date: March 17, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Completed | Permit id: 676796 | |||||
Alteration permit Date: March 17, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Active | Permit id: 663560 | |||||
Suppression permit Date: September 12, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Active | Permit id: 721220 | |||||
Electrical permit Date: September 8, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Active | Permit id: 694104 | |||||
Demolition permit Date: March 14, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Completed | Permit id: 676150 | |||||
Plumbing permit Date: June 20, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Active | Permit id: 693038 | |||||
Alteration permit Date: December 6, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Completed | Permit id: 741596 | |||||
Plumbing permit Date: June 20, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Completed | Permit id: 693038 | |||||
Mechanical permit Date: August 2, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Completed | Permit id: 687214 | |||||
Electrical permit Date: September 8, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Completed | Permit id: 694104 | |||||
Demolition permit Date: March 14, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Completed | Permit id: 676150 | |||||
Suppression permit Date: September 12, 2016 Client: Ho Steve Lam Bobby Lun | Permit status: Completed | Permit id: 721220 | |||||
SCORE 96 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: March 14, 2016 Contractor: Binh Construction Llc Client: Ho Steve Lam Bobby Lun | Permit type: Demolition permit | Permit status: Completed | Completion date: November 22, 2016 | Permit id: 676150 | |||||
SCORE 96 For the installation of security gates & grills as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Proposed for 3 window roller gates, one on castor street and two on side yard, proposed for one door roller gate Date: November 8, 2016 Contractor: Binh Construction Llc Client: Ho Steve Lam Bobby Lun | Permit type: Alteration permit | Permit status: Completed | Completion date: January 12, 2017 | Permit id: 734674 | |||||
SCORE 99 To install a new fire suppression system for a 12-0" hood. Date: September 12, 2016 Contractor: Reliable Fire Protection Inc Client: Ho Steve Lam Bobby Lun | Permit type: Suppression permit | Permit status: Completed | Completion date: January 12, 2017 | Permit id: 721220 | |||||
SCORE 62 For the installation of an hvac system to include supply exhaust ductwork, register diffusers, and all other work as per approved plans. Separate permit required for kitchenhoods and associated exhaust fan and make up air fan. Date: March 17, 2016 Contractor: Qd Designs Client: Ho Steve Lam Bobby Lun | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 22, 2016 | Permit id: 676796 | |||||
SCORE 62 No change in use and occupancy classification. Level ii interior alterations and framing work to an existing restaurant and single family dwelling above. Separate permit required for mechanical, electrical, plumbing, and kitchen hood permits. Certificate of occupancy on this permit for documentation. Date: March 17, 2016 Contractor: Qd Designs Client: Ho Steve Lam Bobby Lun | Permit type: Alteration permit | Permit status: Completed | Completion date: January 12, 2017 | Permit id: 663560 | |||||
SCORE 100 4-water closet, three comp sink, 1 pot sink, 1 mop sink, 1 wok, 4 lav sink, 1 floor drain, 1 floor sink, 1 hand sink, 1 roof drain, 2 showers & install 3 4 rpz back flow preventer water heater the installation will comply with the philadelphia plumbing code 2004 Date: June 20, 2016 Contractor: Marc Daniels Dba Daniel Inc Me Client: Ho Steve Lam Bobby Lun | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 12, 2017 | Permit id: 693038 | |||||
SCORE 96 Proposed for installation of new kitchen exhaust hood system to include associated ductwork and exhaust make-up air fans as per plans. (note: partition walls surrounding kitchen appliances shall be non-combustible per imc 2009, sec 507. 12, exception.) separate permit required for kitchen fire suppression system installation. Date: August 2, 2016 Contractor: Binh Construction Llc Client: Ho Steve Lam Bobby Lun | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 12, 2017 | Permit id: 687214 | |||||
SCORE 100 Wire for 28 lights, outlets and emergency lights per 2008 ne (restaurant)east district install fire alarm system per nfpa 72 Date: September 8, 2016 Contractor: Dameon Carty Client: Ho Steve Lam Bobby Lun | Permit type: Electrical permit | Permit status: Completed | Completion date: January 12, 2017 | Permit id: 694104 | |||||
SCORE 96 Ez permit security gates & grills- for the installation of security gates & grills as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Proposed for 1 window roller gate, one on side yard, with pfreviously approved window gate on castor ave and two previously approved on side yard (total 3 on side yard) proposed for one door roller gate Date: December 6, 2016 Contractor: Binh Construction Llc Client: Ho Steve Lam Bobby Lun | Permit type: Alteration permit | Permit status: Completed | Completion date: January 12, 2017 | Permit id: 741596 |