Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Project includes the build-out of existing unfinished shell space and the remodel of other finished spaces. New spaces include: wash room, storage rooms, and several pharmaceutical manufacturing production clean rooms. These spaces will be served by new mechanical units located on the mezzanine above, and future boilers in a new 1-hour rated room, also on the mezzanine. Penetrations for new doors will be made in the existing 3-hour rates wall on the south. Date: July 28, 2014 Permit type: Permit | Permit status: Pass | Completion date: December 4, 2014 | Current use: Commercial | Permit id: Bld2014-05355 | |||||
SCORE 64 Fire suppresion system - area b and room 1190 Date: December 1, 2014 Permit type: Fire | Permit status: Completed | Completion date: December 11, 2014 | Current use: Commercial | Permit id: Bld2014-08789 | |||||
SCORE 74 Provide waste, vent, water, and gas piping. Date: December 12, 2014 Permit type: Plumbing | Permit status: Closed | Completion date: July 9, 2015 | Current use: Commercial | Permit id: Bld2014-09097 | |||||
SCORE 74 Provide vav boxes, exhaust fans, and pumps. Date: December 12, 2014 Permit type: Mechanical | Permit status: Closed | Completion date: July 8, 2015 | Current use: Commercial | Permit id: Bld2014-09100 | |||||
SCORE 64 Electrical for b575 production core expansion for actavis Date: December 22, 2014 Contractor: Ampd Electric Llcb575 Production Core Expansion Permit type: Electrical | Permit status: Pass | Completion date: May 26, 2015 | Current use: Commercial | Permit id: Bld2014-09347 | |||||
SCORE 64 Add a nac extender next to the existing fire alarm panel on the second floor. Use circuits on the nac panel for the expansion of area c on the first floor as shown on the drawings. Add a duct smoke detector on ahu- located on the mezzanine and connect to existing idnet circuit maintaining class a circuits. Add a new gentex a/v to the existing circuit located in room 1190, maintain class a circuiting. Date: January 20, 2015 Contractor: Simplexgrinnellactavis B575 Permit type: Low voltage | Permit status: Completed | Completion date: March 23, 2015 | Current use: Commercial | Permit id: Bld2015-00377 | |||||
Fire sprinklers Date: February 20, 2015 Permit type: Fire | Permit status: Completed | Completion date: March 25, 2015 | Current use: Commercial | Permit id: Bld2015-01146 | |||||
SCORE 74 Installing miscellaneous process piping. Date: July 22, 2015 Contractor: Kemp And Hilton Inc.Actavis Permit type: Plumbing | Permit status: Reviews not require | Completion date: July 22, 2015 | Current use: Commercial | Permit id: Bld2015-05675 | |||||
SCORE 74 Relocating fan coil box. Date: July 22, 2015 Contractor: Kemp And Hilton Inc.Actavis Permit type: Mechanical | Permit status: Accepted | Completion date: July 22, 2015 | Current use: Commercial | Permit id: Bld2015-05678 | |||||
Electrical modifications to existing facility Date: November 25, 2013 Permit type: Electrical | Permit status: Pass | Completion date: January 23, 2014 | Current use: Commercial | Permit id: Bld2013-08755 | |||||
SCORE 91 Re-roof. Date: October 17, 2013 Contractor: Capitol Roofing Service Inc Permit type: Roofing | Permit status: Pass | Completion date: October 17, 2013 | Current use: Commercial | Permit id: Bld2013-07670 | |||||
1 - monument 32 sq ft Date: August 27, 2013 Permit type: Sign | Permit status: Pass | Completion date: October 22, 2013 | Permit id: Bld2013-06128 | |||||
Addition of h-rated storage closet in room 1504, including associated mechanical, plumbing, and electrical work. Also, we are making changes to existing doors and adding others. Date: August 8, 2013 Permit type: Permit | Permit status: Pass | Completion date: January 23, 2014 | Current use: Commercial | Permit id: Bld2013-05626 | |||||
SCORE 64 Add 3 av devices and door holders to existing panel Date: July 3, 2013 Contractor: Simplexgrinnell Lpwatson Labs Strage Area Permit type: Low voltage | Permit status: Pass | Completion date: September 3, 2013 | Current use: Commercial | Permit id: Bld2013-04609 | |||||
SCORE 64 Electrical for new storage areas Date: July 1, 2013 Permit type: Electrical | Permit status: Pass | Completion date: August 26, 2013 | Current use: Commercial | Permit id: Bld2013-04496 | |||||
SCORE 64 This is a small t. I. Project. The fire sprinkler system is existing with quick response uprights being fed off of a fire pump. They will be installing a few walls with a hard lid ceiling, our intent is to simply turn the existing sprig-ups down and install new 155 degree quick response pendants. Date: June 25, 2013 Contractor: Watson Labs Storage Room Permit type: Fire | Permit status: Pass | Completion date: August 9, 2013 | Current use: Commercial | Permit id: Bld2013-04321 | |||||
SCORE 64 Fire alarm renovation for watson labs. Date: July 11, 2012 Contractor: Fire Protection Serviceswatson Labs Permit type: Low voltage | Permit status: Pass | Completion date: July 26, 2012 | Current use: Commercial | Permit id: Bld2012-05009 | |||||
SCORE 64 5 appliances & 1 exhaust fan Date: June 21, 2012 Contractor: C And C Sheet Metalwatson Lab Permit type: Mechanical | Permit status: Pass | Completion date: July 26, 2012 | Current use: Commercial | Permit id: Bld2012-04552 | |||||
SCORE 64 Add and relocate existing fire sprinkler heads 6/18 Date: June 18, 2012 Contractor: Certified Fire Protectionwatson Labs Permit type: Fire | Permit status: Pass | Completion date: August 16, 2012 | Current use: Commercial | Permit id: Bld2012-04443 | |||||
Locker and restroom remodel, lobby remodel Date: February 27, 2012 Permit type: Permit | Permit status: Pass | Completion date: August 29, 2012 | Current use: Commercial | Permit id: Bld2012-01601 | |||||
SCORE 64 Fire sprinklers for area a & c, levels 1 & 2 Date: September 19, 2011 Contractor: Fire Engineering Company Incwatson Labs Permit type: Fire | Permit status: No certificate req | Completion date: April 16, 2012 | Current use: Commercial | Permit id: Bld2011-05978 | |||||
SCORE 64 Fire alarm Date: August 25, 2011 Contractor: Simplexgrinnellwatson Labs Hydrogel Project Permit type: Low voltage | Permit status: Pass | Completion date: April 23, 2012 | Current use: Commercial | Permit id: Bld2011-05355 | |||||
SCORE 64 Remodel of area b only. (see plan) Date: July 5, 2011 Permit type: Fire | Permit status: Completed | Completion date: April 9, 2012 | Current use: Commercial | Permit id: Bld2011-04096 | |||||
SCORE 74 Install 2 sinks, 1 water heater, 65 drains, and medical gas piping Date: May 24, 2011 Contractor: Koch Incwatson Labs Hydrogel Project Permit type: Plumbing | Permit status: Completed | Completion date: April 9, 2012 | Current use: Commercial | Permit id: Bld2011-02977 | |||||
SCORE 74 Install 2 air handlers, 8 appliances. Date: May 24, 2011 Contractor: Koch Incwatson Labs Hydrogel Project Permit type: Mechanical | Permit status: Pass | Completion date: January 27, 2014 | Current use: Commercial | Permit id: Bld2011-02976 | |||||
Elec work for watson labs research park area a, b & c fitout. Any modifications to fire alarm, or need to temp power or power to panel are authorized by seperate permits. Date: May 13, 2011 Permit type: Electrical | Permit status: Completed | Completion date: April 9, 2012 | Current use: Commercial | Permit id: Bld2011-02770 | |||||
SCORE 64 Watson labs research park area a, b & c fitout permit issue. This will be the second of two permit applications for this project. Date: January 19, 2011 Contractor: Okland Construction Cowatson Labs Permit type: Permit | Permit status: Completed | Completion date: April 23, 2012 | Current use: Commercial | Permit id: Bld2011-00370 | |||||
SCORE 76 Note: address change. 1-suspended unit heater 2-exhaust fans 6-terminal air units 6-reheat coils. B575 new compounding suite Date: January 14, 2016 Contractor: Mechanical Service And Systems Inc.Actavis Permit type: Mechanical | Permit status: Inspections | Completion date: January 14, 2016 | Current use: Commercial | Permit id: Bld2016-00308 | |||||
SCORE 59 Project includes the build-out of existing unfinished shell space and the remodel of other finished spaces. New spaces include: wash room, storage rooms, and several pharmaceutical manufacturing production clean rooms. These spaces will be served by new mechanical units located on the mezzanine above, and future boilers in a new 1-hour rated room, also on the mezzanine. Penetrations for new doors will be made in the existing 3-hour rates wall on the south. Date: July 28, 2014 Permit status: Closed | Completion date: October 6, 2015 | Current use: Commercial | Permit id: Bld2014-05355 | |||||
Fire sprinklers Date: February 20, 2015 Permit type: Fire | Permit status: Closed | Completion date: October 5, 2015 | Current use: Commercial | Permit id: Bld2015-01146 | |||||
Interior t. I. (rhm signed for tb on 7/10/2013, called tb to verify), no zoning issues a. M. Date: March 8, 2013 Permit type: Permit | Permit status: Pass | Completion date: August 26, 2013 | Current use: Commercial | Permit id: Bld2013-01360 | |||||
SCORE 66 Racking permit t. B. Zone: rp interior work only n. L. Conditional: man doors reqd every 1 with 1-1/2" outlets within 3 of latch side of each door (east half) d. W. Date: December 6, 2011 Contractor: S. S. P. Inc.Watson Labs Permit type: Permit | Permit status: Pass | Completion date: January 12, 2012 | Current use: Commercial | Permit id: Bld2011-07990 |