Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: March 7, 2016 Contractor: Solaire Energy Systems Inc Permit type: Mechanical - hvac change out | Permit status: Completed | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Roof mount residential solar pv with 125amp subpanel for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 6, 2015 Contractor: Solaire Energy Systems Inc Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2015-Resalt- | Parcel: 5903201600 |