Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 Install fire alarm detection system Date: February 10, 2000 Contractor: Foothills Security Systems Inc Client: Tree Burning | Applicant: Foothills Security Systems Inc | Permit type: Fire | Permit status: Cmp | Completion date: May 24, 2000 | Current use: Existing | |||||
SCORE 90 Tenant remodel of 18 square feet. Client: Llc 5735.0 | Applicant: Buffalo Enterprises, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 27, 2010 | Current use: Manufacturing, | |||||
SCORE 90 Tenant remodel of 10 square feet in unit f. Client: Llc 5735.0 | Applicant: Buffalo Enterprises, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 28, 2010 | Current use: Manufacturing, | |||||
SCORE 90 Tenant remodel of to remove the wall between units a and g to creat one large unit. The removal of the wall will add an additionl 20 sq. Ft. To unit a. The original size of unit a is unknown. A building permit was not submitted for the original tenant improvements. Client: Llc 5735.0 | Applicant: Buffalo Enterprises, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 16, 2011 | Current use: Manufacturing, | |||||
SCORE 59 Tenant remodel of 8 sf to include creation of an accessible restroom, (existing restroom -- walls to be moved to create sufficiently sized restroom utilizing existing plumbing fixtures) framing modfications, includes mechanical and electrical modifications Client: Llc 5735.0 | Applicant: Llc 5735.0 | Permit type: Building, electrical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 90 Tenant remodel (unit d) - for manufacturing area to include two (2) new ada bathrooms. Includes electrical, mechanical, and plumbing. Client: Llc 5735.0 | Applicant: Buffalo Enterprises, Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 90 Tenant remodel (unit c) - for manufacturing area and conversion of existing bathroom to ada. Includes electrical, mechanical, and plumbing. Client: Llc 5735.0 | Applicant: Buffalo Enterprises, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Manufacturing, | |||||
SCORE 90 Tenant remodel (unit b) - for manufacturing area on two (2) floors, conversion of two (2) existing bathroom to ada, and new stairwell to secong floor. Includes electrical, mechanical, and plumbing. Client: Llc 5735.0 | Applicant: Buffalo Enterprises, Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 99 Inspection of suite a for an anticipated meter release. Date: September 25, 2013 Contractor: Tru Craft Electric Corporation Client: Arapahoe 5735.0 | Applicant: Tru Craft Electric Corporation | Permit type: Electrical | Permit status: Cmp | Completion date: October 2, 2013 | Current use: Manufacturing, | |||||
SCORE 99 Inspection of suite a for an anticipated meter release. Client: Arapahoe | Permit type: Electrical | Permit status: Cmp | Completion date: October 2, 2013 | Current use: Manufacturing, existing | Permit id: Pmt2013-04904 | |||||
SCORE 95 Tenant remodel of 18 square feet. Client: Llc | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: September 27, 2010 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2010-02306 | |||||
SCORE 95 Tenant remodel of 10 square feet in unit f. Client: Llc | Permit type: Building, electrical, mechanical, plumbing, water, flood accessory/remodel | Permit status: Cmp | Completion date: December 28, 2010 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2010-03736 | |||||
SCORE 95 Tenant remodel of to remove the wall between units a and g to creat one large unit. The removal of the wall will add an additionl 20 sq. Ft. To unit a. The original size of unit a is unknown. A building permit was not submitted for the original tenant improvements. Client: Llc | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: March 16, 2011 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2011-00108 | |||||
SCORE 95 Tenant remodel of 8 sf to include creation of an accessible restroom, (existing restroom -- walls to be moved to create sufficiently sized restroom utilizing existing plumbing fixtures) framing modfications, includes mechanical and electrical modifications Client: Llc | Permit type: Building, electrical, mechanical, water, wastewater, flood accessory/remodel | Permit status: N&v | Current use: Manufacturing, tenant remodel | Permit id: Pmt2011-00200 | |||||
SCORE 95 Tenant remodel (unit c) - for manufacturing area and conversion of existing bathroom to ada. Includes electrical, mechanical, and plumbing. Client: Llc | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Iss | Current use: Manufacturing, tenant remodel | Permit id: Pmt2011-00433 | |||||
SCORE 84 Install fire alarm detection system Client: Tree Burning | Permit type: Fire | Permit status: Cmp | Completion date: May 24, 2000 | Current use: Existing | Permit id: Pmt2000-00589 | |||||
SCORE 95 Tenant remodel (unit d) - for manufacturing area to include two (2) new ada bathrooms. Includes electrical, mechanical, and plumbing. Value: $58,486 Contractor: Buffalo Enterprises, Inc Client: Llc | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: N&v | Current use: Manufacturing, tenant remodel | Permit id: Pmt2011-00432 | |||||
SCORE 95 Tenant remodel (unit b) - for manufacturing area on two (2) floors, conversion of two (2) existing bathroom to ada, and new stairwell to secong floor. Includes electrical, mechanical, and plumbing. Value: $130,000 Contractor: Buffalo Enterprises, Inc Client: Llc | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: N&v | Current use: Manufacturing, tenant remodel | Permit id: Pmt2011-00435 | |||||
SCORE 96 Electrical permit - for replacement of existing 8 amp service with 2,4 amp service for warehouse building. Date: November 1, 2010 Contractor: H B Electric Client: Llc 5735.0 | Applicant: H B Electric (hank Brothers Inc) | Permit type: Electrical, flood fe | Permit status: N&v | Current use: Warehousing, ex | |||||
SCORE 72 Tap install new 1inch domestic water service line and meter. New service to be tapped from main in easement to west of building. Existing 3 4inch service to be abandoned at the main in arapahoe (((to be done under separate permit))) (see pmt2011-002 for fees and meter) Date: February 24, 2011 Contractor: Rio Llc Client: Llc 5735.0 | Applicant: Rio Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 99 Installation of three a c units, seer rating of at least 13. 0, includes associated electrical. Mechanical equipment must be installed at 5226. 3foot or higher, ngvd 1929. See cpl2011-01131 for additional information. Date: April 6, 2011 Contractor: Bagi Mechanical Llc Client: Llc 5735.0 | Applicant: Bagi Mechanical, Llc | Permit type: Electrical, mechanic | Permit status: Iss | Current use: Manufacturing, | |||||
SCORE 59 Install replacement gfci outlet in bathroom and remove section of single wall vent piping on furnace vent and replace with double wall to provide required clearnace to combustibles. Client: Llc 5735.0 | Applicant: Llc 5735.0 | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: October 13, 2011 | Current use: Manufacturing, | |||||
SCORE 95 Replace forced air furnace and air conditioner in unit a. Date: September 29, 2011 Contractor: Timberline Mechanical Systems Client: Llc 5735.0 | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: October 7, 2011 | Current use: Existing | |||||
SCORE 100 Interior remodel of existing manufacturing facility, including addition of new dividing walls, ada upgrades to bathrooms, and associated meps. Client: Arapahoe 5735.0 | Applicant: Weins Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 1, 2014 | Current use: Manufacturing, | |||||
SCORE 95 Unit a: repair of existing electric circuits and installation of additional lighting. Date: January 16, 2014 Contractor: Bishop Electric Client: Arapahoe 5735.0 | Applicant: Bishop Electric | Permit type: Electrical | Permit status: Cmp | Completion date: August 13, 2014 | Current use: Warehousing, ex | |||||
SCORE 95 Interior remodel of 3 square feet for new interior demizing walls to separate office space for the boulder democratic party administrative offices. Includes associated electrical. Client: Arapahoe 5735.0 | Applicant: Agr Building, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 13, 2014 | Current use: Office - techni | |||||
SCORE 100 Tenant interior finish for grow facility to include partition walls and addition of two accessible bathrooms. Client: Arapahoe 5735.0 | Applicant: Weins Construction, Inc. | Permit type: Building, electrical | Permit status: Den | Current use: Manufacturing, | |||||
SCORE 100 Tear-off and re-roof of flat roof on commercial building ( squares). New assembly to include 6inch of poly-iso, 1 4inch densdeck, and tpo singleply. Client: Arapahoe | Permit type: Roofing | Permit status: Iss | Current use: Manufacturing, existing | Permit id: Pmt2016-04078 | |||||
SCORE 95 Interior remodel of existing manufacturing facility, including addition of new dividing walls, ada upgrades to bathrooms, and associated meps. Client: Arapahoe | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: April 1, 2014 | Current use: Manufacturing, remodel | Permit id: Pmt2013-06819 | |||||
SCORE 95 Unit a: repair of existing electric circuits and installation of additional lighting. Client: Arapahoe | Permit type: Electrical | Permit status: Cmp | Completion date: August 13, 2014 | Current use: Warehousing, existing | Permit id: Pmt2014-00232 | |||||
SCORE 95 Interior remodel of 3 square feet for new interior demizing walls to separate office space for the boulder democratic party administrative offices. Includes associated electrical. Client: Arapahoe | Permit type: Building, electrical, flood accessory/remodel | Permit status: Cmp | Completion date: August 13, 2014 | Current use: Office - technical, tenant remodel | Permit id: Pmt2014-02516 | |||||
SCORE 96 Electrical permit - for replacement of existing 8 amp service with 2,4 amp service for warehouse building. Client: Llc | Permit type: Electrical, flood fence flood permit | Permit status: N&v | Current use: Warehousing, existing | Permit id: Pmt2010-04528 | |||||
SCORE 95 Installation of three a c units, seer rating of at least 13. 0, includes associated electrical. Mechanical equipment must be installed at 5226. 3foot or higher, ngvd 1929. See cpl2011-01131 for additional information. Client: Llc | Permit type: Electrical, mechanical | Permit status: Iss | Current use: Manufacturing, existing | Permit id: Pmt2011-01329 | |||||
SCORE 96 Install replacement gfci outlet in bathroom and remove section of single wall vent piping on furnace vent and replace with double wall to provide required clearnace to combustibles. Client: Llc | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: October 13, 2011 | Current use: Manufacturing, existing | Permit id: Pmt2011-03906 | |||||
SCORE 95 Replace forced air furnace and air conditioner in unit a. Client: Llc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 7, 2011 | Current use: Existing | Permit id: Pmt2011-04170 | |||||
SCORE 95 Tenant interior finish for grow facility to include partition walls and addition of two accessible bathrooms. Client: Arapahoe | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: September 1, 2016 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2015-01164 | |||||
SCORE 59 Electrical service replacement, 12 amp. Associated temporary construction power covered under the scope of this permit. Value: $75,969 Contractor: Ess Electric Client: Arapahoe | Permit type: Electrical, flood accessory/remodel | Permit status: Iss | Current use: Warehousing, existing | Permit id: Pmt2017-04033 | |||||
SCORE 99 Re-set electrical meter for unit f1, disconnected by xcel in 2011. Date: March 12, 2013 Contractor: Tru Craft Electric Corporation Client: Llc 5735.0 | Applicant: Tru Craft Electric Corporation | Permit type: Electrical | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Existing | |||||
SCORE 99 Re-set electrical meter for unit f1, disconnected by xcel in 2011. Client: Llc | Permit type: Electrical | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Existing | Permit id: Pmt2013-01086 | |||||
SCORE 95 Re-set electrical meter for unit d, disconnected by xcel. Date: January 14, 2014 Contractor: Bishop Electric Client: Arapahoe 5735.0 | Applicant: Bishop Electric | Permit type: Electrical | Permit status: Cmp | Completion date: January 17, 2014 | Current use: Warehousing, ex | |||||
SCORE 95 Re-set electrical meter for unit d, disconnected by xcel. Client: Arapahoe | Permit type: Electrical | Permit status: Cmp | Completion date: January 17, 2014 | Current use: Warehousing, existing | Permit id: Pmt2014-00179 | |||||
SCORE 95 Re-set electrical meter for unit g2, disconnected by xcel. Date: January 14, 2014 Contractor: Bishop Electric Client: Arapahoe 5735.0 | Applicant: Bishop Electric | Permit type: Electrical | Permit status: Cmp | Completion date: January 17, 2014 | Current use: Manufacturing, | |||||
SCORE 95 Re-set electrical meter for unit g2, disconnected by xcel. Client: Arapahoe | Permit type: Electrical | Permit status: Cmp | Completion date: January 17, 2014 | Current use: Manufacturing, existing | Permit id: Pmt2014-00181 | |||||
SCORE 95 Re-set electrical meter for unit b3, disconnected by xcel. Date: January 14, 2014 Contractor: Bishop Electric Client: Arapahoe 5735.0 | Applicant: Bishop Electric | Permit type: Electrical | Permit status: Cmp | Completion date: August 11, 2014 | Current use: Warehousing, ex | |||||
SCORE 95 Re-set electrical meter for unit b3, disconnected by xcel. Client: Arapahoe | Permit type: Electrical | Permit status: Cmp | Completion date: August 11, 2014 | Current use: Warehousing, existing | Permit id: Pmt2014-00182 |