Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 To construct a new single family res at 2522 sqft with porches and decks.... Front setback min 54... Side min 5... And note easement on the other side..... 1. See setbacks of 4 closest houses. An hpr counts as only one setback and not 2 2. See note 15 on the plat. Shared driveway and no parking allowed between house and street. 3. See note 16 required raised foundation 18 to 36.. 4. Max ht 2 stories and 35... Measured from the natural grade.. Natural grade shall be determined based on the average elevation of most exterior corners of the front facade, to the very top of the structure.. Natural grade is the base ground elevation prior to grading. And definition of . Story means a portion of a building between the surface of any floor and the surface of the floor above it, or, if there is no floor above it, the space between such floor and the ceiling above it. A basement or cellar shall not be deemed a story if the finished floor level directly above is not more than six feet above the ave Permit type: Building residential - new | Permit id: 2016065624 | Parcel: 09106043300 | |||||
SCORE 84 To demo existing house on property... Work on this demolition permit must commence within thirty (30) days of issuance and be completed sixty (60) days after commencement. This permit expires days after the permit is issued. Please call 811 before you dig.... Pursuant ordinance # 2006-1263 metropolitan code of laws, i (the holder on this permit) hereby certify that all construction & demolition waste generated by any & all activities governed by this permit shall be disposed of in an approved landfill. Further, i certify that no construction & demolition waste shall be stored on the property in violation of any provision of metropolitan code. Per ordinance bl2016-178.... An affidavit shall be submitted to the director certifying the date of demolition has commenced and describing the nature of the work performed to date. If no such affidavit is submitted within thirty days of issuance, the demolition permit shall be deemed invalid... Permit type: Building demolition permit | Permit id: 2016050352 | Parcel: 09106009600 | |||||
SCORE 84 To construct a 18 x 18 (324 sq ft) ft detached carport to rear of existing single family residence. Not to be used as living quarters or for commercial use. See sewer easement on side property line.... Minimum 3 ft side setbacks and 3 ft minimum rear setback. Must conform with all easements on property... Within the uzo may have vertical walls rising no higher than 16 ft... Slope height of roof not to exceed that of primary residence.. Maximum building coverage on total parcel not to exceed 50%.... Pursuant # 2006-1263 metro code of laws, i (holder of permit) hereby certify that all construction & demolition waste generated by any & all activities governed by this permit shall be disposed of in an approved landfill. Further, i certify that no construction & demolition waste shall be stored on the property in violation of any provision of metro code.; for every feet of street frontage, or fraction thereof, one 2 inch caliper tree as listed in the urban forestry approved tree list shall be Permit type: Building residential - new | Permit id: 2017055738 | Parcel: 09106043300 |