Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Master plan for map 16019 tm 4976-rpl-4r phase 5, 7 productions units lots 22-28 for pardee homes "olive hill estates" see pds2016-tphspc-000001 for all clearances plan 4ar1 lot # 27 3846 sf sfd w/ac, fs 646 sf attached gar fin fs 158 sq ft portico porch 73 sf 289 sq ft outdoor room(patio) opt #1 - 302 sq ft 4th car garage Permit type: Tract models or prod units | Permit status: Completed | Permit id: Pds2016-Tphspm- | |||||
2017 fire emergency temporary occupancy permit valid until 06 07 2018 all wastewater generated from the emergency temporary occupancy or trailer must be disposed of in an approved onsite wastewater treatment system with all plumbing connected to the existing septic tank inlet. I certify that the emergency temporary occupancy will be connected to the existing onsite wastewater treatment system and meet all required setbacks to the septic tank and subsurface sewage disposal field. Improper disposal of sewage constitutes an immediate threat to health and safety of the public and is in violation of ca health & safety code section 17920. 3 and san diego county code section 68. 311. Date: December 14, 2017 Permit type: New residential acc structure | Permit status: Issued | Permit id: Pds2017-Resacc- | |||||
SCORE 99 2017 fire emergency temporary power permit valid until 06 07 2018 Date: December 13, 2017 Contractor: Integrity Restoration Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: February 21, 2017 Permit status: Pass | Permit id: Pds2016-Tphspm- | |||||
Lath/drywall - interior Date: December 13, 2016 Permit status: Pass | Permit id: Pds2016-Tphspm- |