Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Total tear off and overlay of 42 squares of flat roof with fibertite membrane roofing. ![]() ![]() Client: Of City | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: August 2, 2007 | Current use: Government uses | |||||
SCORE 56 Electric and sitework permits for improvements to the water treatment facility located at boulder reservoir. ![]() ![]() Client: Of City | Applicant: Annie Noble | Permit type: Electrical, sitework | Permit status: N&v | Current use: Government uses | |||||
SCORE 94 Removal of three and replacement with four frp tanks at the water treatment plant for modernization of equipment. Assoicated process pumps and electrical controls. Client: Of City | Applicant: Paramount Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 11, 2009 | Current use: Public works/ut | |||||
SCORE 59 Construction of pretreatment improvements at water treatment facility in existing daf building with installation of flocculation units, including new concrete walls, new mixers, underground yard piping, new co2 tanks and precast vaults. See adr2010-00004 Client: Of City | Applicant: Lillard & Clark Construction | Permit type: Building, electrical | Permit status: N&v | Current use: Government uses | |||||
SCORE 95 Addition of a 4th pump and pump controls in an existing pump-station structure (pump-station moves water from boulder reservoir to boulder reservoir water treatment plant.) ![]() ![]() Client: Of City | Applicant: City Of Boulder, Pw Utilities | Permit type: Electrical | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Government uses | |||||
SCORE 100 Repair gas leak at the main ![]() ![]() Client: Of City | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Cob water treatment plant -- inchcirculation & clarifier buildinginch existing ballasted roof to be removed, remove membrane layer, add new membrane layer over existing eps insulation, lay old membrane over new membrane, reinstall a portion of the ballast. 12 lbs square foot of ballast material to be permanently removed to compensate for proposed solar array (12 lbs sf) to be installed by separate permit at a later date. Pre-reroof inspection required. Positive drainage of roof required (scuppers) ![]() ![]() Client: Of City | Applicant: Douglass Colony Group Inc | Permit type: Roofing | Permit status: Cmp | Completion date: January 16, 2014 | Current use: Government uses | |||||
SCORE 60 Cob water treatment plant -- installation of a 102. 9 kw photovoltaic system on the roof of the inchcirculation & clarifierinch building. 15 degreee tilt-up, top edges of the panels to remain below top edge of the parapet walls. (panel shadows to remain on the roof surface.) see pmt2011-025 for re-roofing permit and additional information. ![]() ![]() Client: Of City | Applicant: Namaste | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Government uses | |||||
SCORE 99 Remove and replace damaged section of roof at city water treatment facility with 1 4inch per foot tapered insulation, 1 2inch securock and epdm. 17 sqaures, flat roof. ![]() ![]() Client: Of City | Applicant: Alpine Roofing Co Inc | Permit type: Roofing | Permit status: Cmp | Completion date: May 24, 2012 | Current use: Government uses | |||||
SCORE 100 Lower gas main to install culvert ![]() ![]() Client: Of City | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 94 Removal of three and replacement with four frp tanks at the water treatment plant for modernization of equipment. Assoicated process pumps and electrical controls. Client: Of City | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 11, 2009 | Current use: Public works/utilities, remodel | Permit id: Pmt2009-01899 | |||||
Lower gas main to install culvert ![]() Client: Of City | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-00164 | |||||
SCORE 99 Remove and replace damaged section of roof at city water treatment facility with 1 4inch per foot tapered insulation, 1 2inch securock and epdm. 17 sqaures, flat roof. Client: Of City | Permit type: Roofing | Permit status: Cmp | Completion date: May 24, 2012 | Current use: Government uses, existing | Permit id: Pmt2012-02131 | |||||
SCORE 59 Construction of pretreatment improvements at water treatment facility in existing daf building with installation of flocculation units, including new concrete walls, new mixers, underground yard piping, new co2 tanks and precast vaults. See adr2010-00004 Client: Of City | Permit type: Building, electrical | Permit status: N&v | Current use: Government uses, addition and remodel | Permit id: Pmt2010-00340 | |||||
Addition of a 4th pump and pump controls in an existing pump-station structure (pump-station moves water from boulder reservoir to boulder reservoir water treatment plant.) ![]() ![]() Client: Of City | Permit type: Electrical | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Government uses, existing | Permit id: Pmt2010-01309 | |||||
Repair gas leak at the main ![]() Client: Of City | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-05612 | |||||
SCORE 100 Cob water treatment plant -- inchcirculation & clarifier buildinginch existing ballasted roof to be removed, remove membrane layer, add new membrane layer over existing eps insulation, lay old membrane over new membrane, reinstall a portion of the ballast. 12 lbs square foot of ballast material to be permanently removed to compensate for proposed solar array (12 lbs sf) to be installed by separate permit at a later date. Pre-reroof inspection required. Positive drainage of roof required (scuppers) Client: Of City | Permit type: Roofing | Permit status: Cmp | Completion date: January 16, 2014 | Current use: Government uses, existing | Permit id: Pmt2011-02580 | |||||
Cob water treatment plant -- installation of a 102. 9 kw photovoltaic system on the roof of the inchcirculation & clarifierinch building. 15 degreee tilt-up, top edges of the panels to remain below top edge of the parapet walls. (panel shadows to remain on the roof surface.) see pmt2011-025 for re-roofing permit and additional information. ![]() ![]() Client: Of City | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Government uses, existing | Permit id: Pmt2011-02597 | |||||
SCORE 62 Electric and sitework permits for improvements to the water treatment facility located at boulder reservoir. Client: Of City | Permit type: Electrical, sitework | Permit status: N&v | Current use: Government uses, existing | Permit id: Pmt2004-01024 | |||||
SCORE 95 Total tear off and overlay of 42 squares of flat roof with fibertite membrane roofing. Client: Of City | Permit type: Roofing | Permit status: Cmp | Completion date: August 2, 2007 | Current use: Government uses, existing | Permit id: Pmt2005-04769 | |||||
SCORE 95 Roofing permit for total tear off and overlay of 13. 5 sqaures of hot asphalt membrane on pump station. ![]() ![]() Client: Of City | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: December 3, 2008 | Current use: Public works/ut | |||||
SCORE 95 Roofing permit for total tear off and overlay of 45. 1 squares of hot asphalt membrane. ![]() ![]() Client: Of City | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: December 3, 2008 | Current use: Public works/ut | |||||
SCORE 95 Roofing permit for total tear off and overlay of 13. 5 sqaures of hot asphalt membrane on pump station. Client: Of City | Permit type: Roofing | Permit status: Cmp | Completion date: December 3, 2008 | Current use: Public works/utilities, existing | Permit id: Pmt2007-04987 | |||||
SCORE 95 Roofing permit for total tear off and overlay of 45. 1 squares of hot asphalt membrane. Client: Of City | Permit type: Roofing | Permit status: Cmp | Completion date: December 3, 2008 | Current use: Public works/utilities, existing | Permit id: Pmt2007-04989 |