Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Request for certificate of occupancy to cover the ground floor of the shadd elementary school building for occupancy by dc scholars public charter school. Dc scholars public charter school serves a pre-k through 3rd grade population of 3 students with 18 teachers and will occupy the ground floor classrooms of the campus along with the adjacent kitchen and cafeteria. Kitchen is reheat only with no on-site cooking. Physical work limited to create two individual offices in the main office area. Date: August 6, 2012 Applicant: Department Of General Services | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1210406 | |||||
Electrical Date: August 15, 2012 Client: District Of Columbia | Applicant: James H Bradby | Permit status: Completed | Permit id: E1208656 | |||||
Dc scholars will be occupying seven additional classrooms on the 2nd floor of shadd elementary that have been abandoned for the last few years. Work will include general cleaning and debris removal, paint, flooring repairs, and ceiling grid/tile repairs. To increase load capcity. Date: August 9, 2013 Client: Dc Scholars | Applicant: Mcn Build | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1308275 | |||||
Request for certificate of occupancy to cover the ground and first floors of the shadd elementary school building for occupancy by dc scholars public charter school. Dc scholars public charter school serves a pre-k through 5th grade population of 394 students with 49 teachers/staff and will occupy the ground floor and a portion of the first floor classrooms along with the adjacent kitchen and cafeteria. Kitchen is reheat only with no on-site cooking. Physical work limited to improving six classrooms on the first floor. Date: July 18, 2014 Client: District Of Columbia | Applicant: Kendra Chatburn | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1408621 | |||||
Type of boring: temporary geotechnical soil boring depth of borings: three borings to ft, three borings ro 15 ft drilling method: 3. 25 inch hollow stem auger hole diameter: 5 inches abandonment procedure: tremie grouting with bentonite grout Date: November 10, 2014 Client: District Of Columbia Agent For Owner: Kendra Chatburn | Applicant: District Of Col Agent For Owner: Kendra Chatburn; Eoin Durcan Poc For Schnabel Engineering | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500048 | |||||
SCORE 59 Electrical Date: August 15, 2012 Contractor: John Homick; James H Bradby; ; John Homick Permit status: Completed | Permit id: E1208645 | |||||
SCORE 82 Electrical Date: August 15, 2012 Contractor: James H Bradby Client: District Of Columbia | Permit status: Completed | Permit id: E1208656 | |||||
SCORE 89 Electrical Date: July 31, 2015 Contractor: Brian L. Withrow Client: District Of Columbia | Permit status: Permit issued | Permit id: E1508015 | |||||
SCORE 98 Sign Date: August 4, 2015 Contractor: None Client: District Of Columbia | Permit status: Permit issued | Permit id: Sg1500369 | |||||
SCORE 96 Mechanical Date: August 6, 2015 Contractor: Brooke C Greer Client: District Of Columbia | Permit status: Completed | Permit id: M1502889 | |||||
SCORE 96 Plumbing and gas Date: August 6, 2015 Contractor: Randall W Greer Client: District Of Columbia | Permit status: Completed | Permit id: P1508023 | |||||
SCORE 96 Electrical Date: July 9, 2015 Contractor: Ralph E. Jackson Client: District Of Columbia | Permit status: Completed | Permit id: E1507335 | |||||
Plumbing and gas Date: July 10, 2015 Client: District Of Columbia | Permit status: Permit issued | Permit id: P1507401 | |||||
SCORE 56 Type of boring: temporary geotechnical soil boring depth of borings: three borings to ft, three borings ro 15 ft drilling method: 3. 25 inch hollow stem auger hole diameter: 5 inches abandonment procedure: tremie grouting with bentonite grout Date: November 10, 2014 Client: District Of Columbia Agent For Owner: Kendra Chatburn | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500048 | |||||
SCORE 56 Electrical Date: August 15, 2012 Contractor: John Homick James H Bradby John Homick Permit status: Completed | Permit id: E1208645 | |||||
SCORE 82 Electrical Date: August 15, 2012 Contractor: James H Bradby Client: District Of Columbia | Permit status: Completed | Permit id: E1208656 | |||||
SCORE 56 Type of boring: temporary geotechnical soil boring depth of borings: three borings to ft, three borings ro 15 ft drilling method: 3. 25 inch hollow stem auger hole diameter: 5 inches abandonment procedure: tremie grouting with bentonite grout Date: November 10, 2014 Client: District Of Columbia Agent For Owner: Kendra Chatburn | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500048 | |||||
SCORE 97 Request for certificate of occupancy to cover the ground floor of the shadd elementary school building for occupancy by dc scholars public charter school. Dc scholars public charter school serves a pre-k through 3rd grade population of 3 students with 18 teachers and will occupy the ground floor classrooms of the campus along with the adjacent kitchen and cafeteria. Kitchen is reheat only with no on-site cooking. Physical work limited to create two individual offices in the main office area. Date: August 6, 2012 Contractor: Department Of General Services Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1210406 | |||||
SCORE 59 Electrical Date: August 15, 2012 Contractor: John Homick; James H Bradby; ; John Homick Client: United States Of America & District Of Columiba | Permit status: Completed | Permit id: E1208645 | |||||
SCORE 82 Electrical Date: August 15, 2012 Contractor: James H Bradby Client: District Of Columbia | Permit status: Completed | Permit id: E1208656 | |||||
SCORE 98 Sign Date: August 4, 2015 Contractor: None Client: District Of Columbia | Permit status: Permit issued | Permit id: Sg1500369 | |||||
SCORE 73 Interior demolition on all levels of the building. Date: May 20, 2015 Contractor: Kendra Chatburn Client: District Of Columbia | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500556 | |||||
SCORE 56 A dc public charter school renovating a former dcps site and enhancing the entrance. This facility will host 975 students as well as 1 faculty and staff with 34 parking spaces and a reheat kitchen. Date: July 2, 2015 Contractor: Kendra Chatburn Brailsford And Dunlavey Client: District Of Columbia | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1502257 | |||||
SCORE 89 Electrical Date: July 31, 2015 Contractor: Brian L. Withrow Client: District Of Columbia | Permit status: Permit issued | Permit id: E1508015 | |||||
SCORE 89 Electrical Date: June 10, 2015 Contractor: Brian L. Withrow Client: District Of Columbia | Permit status: Completed | Permit id: E1506493 | |||||
SCORE 96 Electrical Date: July 9, 2015 Contractor: Ralph E. Jackson Client: District Of Columbia | Permit status: Completed | Permit id: E1507335 | |||||
Plumbing and gas Date: July 10, 2015 Client: District Of Columbia | Permit status: Permit issued | Permit id: P1507401 | |||||
SCORE 96 Plumbing and gas Date: August 6, 2015 Contractor: Randall W Greer Client: District Of Columbia | Permit status: Completed | Permit id: P1508023 | |||||
SCORE 96 Mechanical Date: August 6, 2015 Contractor: Brooke C Greer Client: District Of Columbia | Permit status: Completed | Permit id: M1502889 | |||||
SCORE 96 Dc scholars will be occupying seven additional classrooms on the 2nd floor of shadd elementary that have been abandoned for the last few years. Work will include general cleaning and debris removal, paint, flooring repairs, and ceiling grid/tile repairs. To increase load capcity. Date: August 9, 2013 Contractor: Mcn Build Client: Dc Scholars | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1308275 | |||||
SCORE 73 Request for certificate of occupancy to cover the ground and first floors of the shadd elementary school building for occupancy by dc scholars public charter school. Dc scholars public charter school serves a pre-k through 5th grade population of 394 students with 49 teachers/staff and will occupy the ground floor and a portion of the first floor classrooms along with the adjacent kitchen and cafeteria. Kitchen is reheat only with no on-site cooking. Physical work limited to improving six classrooms on the first floor. Date: July 18, 2014 Contractor: Kendra Chatburn Client: District Of Columbia | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1408621 | |||||
SCORE 73 Put up construction fence, demolish/excavate concrete pad to prepare area for elevator pit. Pour concrete pads inside electrical room. Date: March 17, 2015 Contractor: Kendra Chatburn Client: District Of Columbia | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1505357 | |||||
SCORE 95 Type of elevator :one (1) traction /steel/core/ passenger 4(3f/1r) Date: July 22, 2015 Contractor: Schindler Elevator Corp Client: District Of Columbia | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1502751 | |||||
SCORE 96 Type of elevator one (1) inclined lift /steel/level 1 hallway/ accessibility on level 01. Date: August 18, 2015 Contractor: Premier Lifts Inc Client: District Of Columbia | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1502719 | |||||
SCORE 96 Type of elevator one (1) inclined lift /steel/level hallway/ accessibility Date: August 18, 2015 Contractor: Premier Lifts Inc Client: District Of Columbia | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1502720 |