Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
As per rc #2005001338404 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: September 15, 2005 Permit type: Delead | Permit id: E607916 | |||||
As per requirement contract apt. #45 supply and install (2) window guards complete at kitchen (1), bathroom (1). Repair total (3) existing wind Date: October 2, 2012 Permit type: Gc | Permit id: Ed06737 | |||||
Apartment 31, bathroom: trace & repair the nuisance consisting of concealed water leaks (stop leaks) from the ceiling. Ceiling plaster: repair Date: June 9, 2011 Permit type: Gc | Permit id: Eb33210 | |||||
Public area : at public hall 4th sty in front of apt #44 : demolish all loose and defective ceramic floor approx. 4 sq. Ft. Provide and supply new cer Date: April 14, 2009 Permit type: Gc | Permit id: E934319 | |||||
Public part,vestibule: properly install moulding to cover up the remaining portion of exposed electrical wiring on the ceiling. Vendor scope note Date: August 29, 2014 Permit type: Elec | Permit id: Ef05432 | |||||
SCORE 93 Equipment work Date: October 24, 1991 Contractor: New York Heating Co Permit status: Permit issued | Permit id: 10032899501 | |||||
Public area : at public hall stair case landing : replace with new the broken or defective marble tread forth from bottom to west court yard. Remove Date: October 15, 2007 Permit type: Gc | Permit id: E809230 | |||||
Public stair- ways, 1st. Story: replace with new the defective mable treads as follows: 3rd, 4th, 8th, 9th, 10th, 11th and 12th from bottom up. Date: October 16, 2012 Permit type: Gc | Permit id: Ed07858 | |||||
3rd. Story public hallway, properly repair with similar material the ceramic floor tiles approx 2 sqft at 3 different locations for a total of 6sqft. Date: December 31, 2014 Permit type: Gc | Permit id: Ef12397 | |||||
Ist floor p. H. Stairs: replace defective marble treads #5 & #7, respectively from bottom up. Remove work related debris. Date: February 17, 2015 Permit type: Gc | Permit id: Ef14785 | |||||
Public hallway: 1st story: repair 1 window guard with one -way screws and stops. 1 1/2 st story: repair 1 window guard with one -way screws and st Date: April 15, 2004 Permit type: Gc | Permit id: E421106 | |||||
At 3rd. Intermidiate landing of public hallway stairway properly repair the broken concrete pavement and install tiles approx 1 sq. Ft. At the tim Date: May 5, 2011 Value: $194 Permit type: Gc | Permit id: Eb30766 | |||||
Provide and install new shut off valve to the radiator in the living room, 2nd room from north. At the time of this invitation to bid, it is not ant Date: June 29, 2010 Value: $32 Permit type: Plumb | Permit id: Eb01087 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: August 20, 2010 Permit type: Delead | Permit id: Eb07772 | |||||
SCORE 100 Date: October 24, 1991 Contractor: Joseph Caputo Client: Hummer Johann | Client Address: 29 Broadway, Suite 1607 New York Ny 10006 | Client Phone: (212) 509-1242 | Client Company: Gga Realty Corp. | Permit status: Initial | Permit id: 100328995 | |||||
As per the requirement contract with h. P. D and h. P. D/doh guidelines, install/repair window guards: at public parts/public hall/ public ha Permit type: Gc | Permit id: Eh06411 | |||||
Public hallway: 1st story: repair 1 window guard with one -way screws and stops. 1 1 2 st story: repair 1 window guard with one -way screws and st Date: April 15, 2004 Permit type: Gc | Permit id: E421106 | |||||
As per the requirement contract with h. P. D and h. P. D doh guidelines, install repair window guards: at public parts public hall public ha Date: December 8, 2016 Permit type: Gc | Permit id: Eh06411 | |||||
As per rc #2005001338404 (enviro-probe inc), perform total lead analysis of 14 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: September 15, 2005 Permit type: Delead | Permit id: E607920 | |||||
As per the requirement contract with hpd apartment # 53 supply and install the missing or repair/replace the defective window guards throughout Date: October 8, 2014 Permit type: Gc | Permit id: Ef07895 | |||||
As per the requirement contract with hpd apartment # 53 supply and install the missing or repair replace the defective window guards throughout Date: October 8, 2014 Permit type: Gc | Permit id: Ef07895 | |||||
Apt#55, room north 2. Ceiling, properly repair with similar material and paint in uniform color the broken or defective plastered surface approx 35 s Date: October 15, 2012 Permit type: Gc | Permit id: Ed07806 | |||||
At apt # 65- bathroom- provide and install new ceramic tiles approx: sq. Ft above the bathtub area. To prevent any leaks into the downstairs bath Date: July 13, 2010 Permit type: Gc | Permit id: Eb01129 | |||||
(apt. #43) at room north-2: trace, locate, and repair concealed water leak. At room north-2 demolish and repair 154 sq. Ft. Of ceiling, and 99 sq. Date: August 22, 2007 Permit type: Gc | Permit id: E803689 | |||||
As per rc # 20080000809 (eastern analyt. Svc.,inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8 Date: August 10, 2007 Permit type: Delead | Permit id: E803883 | |||||
As per rc #2005001338404 (enviro-probe inc), perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: September 15, 2005 Permit type: Delead | Permit id: E607913 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: November 17, 2016 Permit type: Delead | Permit id: Eh06485 |