Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 97 Ground mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 21, 2013 Contractor: All Phase Electric Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2013-Resalt- | Parcel: 284-110-31-00 | |||||
30 sqft det. Metal garage form 2 for sfd w misc. Elec & upgrade service on well to 4 amps (which will feed 2 amp sub-panel to sfd & 2 amp sub-panel to garage) 10 25 13 renew permit @25%... Vmd must call for inspection within 1 days Date: March 1, 2007 Value: $79,830 Permit type: New residential acc | Permit status: Completed | Permit id: Pds2007-1006-20 | Parcel: 284-110-31-00 | |||||
SCORE 59 2851 sf new sfd with attached garage 962 sf fin fs 2 amp and existing sfd to be used for temporary occupancy during construction only (demo permit and removal of existing sfd required before final of new sfd) notice to permittee temp power shall be inspected prior to framing inspection 09 23 16 plan change, add existing sfd as temp occupancy, see cofa -drw Permit type: New primary residential structure | Permit status: Issued | Permit id: Pds2016-Respri- | Parcel: 2841103100 |