Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 17, 2014 Contractor: Hector R Castellon Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: December 10, 2014 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 17, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 10, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 17, 2014 Contractor: Herca Solar Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 10, 2014 | Permit id: Pds2014-Resalt- | |||||
Foundation/steel/holdowns/abs/2nd Date: September 26, 2005 Permit status: Pass | Permit id: Pds2004-1004-20 | |||||
Final Date: December 9, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
Final Date: November 15, 2007 Permit status: Pass | Permit id: Pds2004-1004-20 | |||||
Combo frame Date: December 18, 2006 Permit status: Pass | Permit id: Pds2004-1004-20 |