Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 1st floor is the kitchen and living room. 2nd floor has the bedroom, bathroom and laundry room. Remove, enlarge and replace window. 1st floor layout will remain the same. Finishes to be upgraded including but not limited to kitchen cabinets, stove, countertops, sink, faucet, flooring, baseboards. Exterior doors to be replaced in kind. Stairs will be reconfigured so that it goes to the 2nd floor from the other side. 2nd floor layout to be reconfigured so that there are 2 bedrooms, bathroom and laundry closet. All new electrical will be provided. The panel will be relocated and the service feeder extended to the new location. New wiring, receptacles, lighting. Plumbing - connect new stove and sink on 1st floor. 2nd floor bathroom to be replaced in new location. New bathroom fixtures. Laundry will be moved as well. Existing water heater to be relocated. Hvac - existing radiator system to be demolished. New central heating and air conditioning to be provided with rigid ducts. Date: April 6, 2017 Contractor: Joseph Garcia Client: Joseph Garcia | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1706625 | |||||
SCORE 88 Electrical Date: April 19, 2017 Contractor: Derrick A. Howard Client: Patricia Anne Witt Trustee | Permit status: Permit issued | Permit id: E1705695 | |||||
SCORE 96 Plumbing and gas Date: April 26, 2017 Contractor: Franklin T Gaines Client: Patricia Anne Witt Trustee | Permit status: Permit issued | Permit id: P1705441 | |||||
SCORE 96 Mechanical Date: April 18, 2017 Contractor: David Movafagh Client: Patricia Anne Witt Trustee | Permit status: Permit issued | Permit id: M1701960 |