Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 94 (6) outlets, (20) fixtures, (1) evaporative cooler, (2) motors Date: September 2, 2010 Contractor: Caballero Electric Permit type: Electrical | Permit status: Inspection | Permit id: Ele10-04676 | |||||
SCORE 100 Install an evap. Cooler and exhaust Date: July 14, 2010 Contractor: B And G Air Conditioning Permit type: Mechanical | Permit status: Inspection | Permit id: Mec10-03619 | |||||
SCORE 99 Gas line Date: November 29, 2010 Contractor: Payless Plumbing Permit type: Plumbing | Permit status: Inspection | Permit id: Plm10-05798 | |||||
SCORE 100 Install an evap. Cooler and exhaust Date: July 14, 2010 Contractor: B And G Air Conditioning Permit type: Mechanical | Permit status: Inspection | Permit id: Mec10-03619 | |||||
Historic Date: May 13, 2002 Permit status: Iss | Permit id: 95 Lft |