Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Remodel repair existing finished basement. Client: Timothy Prodanovich,Martha Prodanovich | Applicant: Timberline Builders | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 14, 2001 | Current use: Single family d | |||||
SCORE 93 Total tear-off & reroof of sfd, 27 squares of asphalt shingles on a pitch represented as 7 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Date: October 7, 2014 Contractor: Buzz Roofing Inc Client: Timothy Prodanovich, Prodanovich | Applicant: Buzz Roofing Inc | Permit type: Roofing | Permit status: Iss | Current use: Single family d | |||||
SCORE 95 Remodel repair existing finished basement. Client: Timothy Prodanovich | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 14, 2001 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2001-04572 | |||||
SCORE 93 Total tear-off & reroof of sfd, 27 squares of asphalt shingles on a pitch represented as 7 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Timothy Prodanovich | Permit type: Roofing | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-04622 |