Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning use permit Date: December 19, 2016 Permit status: Completed | Permit id: 738671 | |||||
Plumbing permit Date: December 8, 2016 Permit status: Active | Permit id: 742143 | |||||
SCORE 100 New construction interior & exterior plumbing; four-story structure; roof deck;triplex;curb trap,lateral& 1. 5 water service pa201710770360"- the installation will comply with the philadephia plubming code 2004 Date: June 20, 2017 Contractor: Daine Barrett Permit type: Plumbing permit | Permit status: Active | Completion date: August 29, 2017 | Permit id: 775500 | |||||
SCORE 100 For the installation of a 2-inch fire service line for an automatic fire suppression sprinkler system with a fire pump and backflow prevention assembly in accordance with nfpa 13r Date: August 9, 2017 Contractor: Shannon Fire Protection Permit type: Suppression permit | Permit status: Active | Completion date: August 29, 2017 | Permit id: 785039 | |||||
Amend permit # 761891 for the new location of the fire-pump room and laundry room. Date: August 30, 2017 Permit type: Administrative permit | Permit status: Completed | Completion date: September 22, 2017 | Permit id: 809028 | |||||
Demolish existing three story structure, construct a four story, three family dwelling with cellar, rear open 2nd floor deck. Date: December 19, 2016 Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 19, 2016 | Permit id: 738671 | |||||
SCORE 100 For the complete demolition of an existing, attached, three (3) story structure. Structure to be demolished by hand and with hand held tools only. Pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. A covered walkway or sidewalk closure shall be required within 8. 5 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. 21 day posting and notice required per a-303. 2 newly exposed walls to be treated Date: February 24, 2017 Contractor: Gama Wrecking Inc Permit type: Demolition permit | Permit status: Completed | Completion date: April 5, 2017 | Permit id: 752695 | |||||
SCORE 99 Install (3) hvac systems with ductwork. (multi-family) Date: May 27, 2017 Contractor: Airtight Heating And Cooling Inc Permit type: Mechanical permit | Permit status: Active | Completion date: August 29, 2017 | Permit id: 787328 | |||||
SCORE 93 New 300amp service,3 unit with 125amp each and (1)100amp house service. All electric throughout per 2008 nec (triplex)install fire pump and fire alarm system per nfpa 72 Date: November 9, 2017 Contractor: Kieran Hughes Permit type: Electrical permit | Permit status: Active | Completion date: November 9, 2017 | Permit id: 801071 | |||||
SCORE 89 Sealing off lateral and remove curb trap pa20163431469 (sfd)self certification no longer accepted all trenches in excess of 5 ft must have approved shoring at the time of inspection. Date: December 8, 2016 Contractor: Pipeline Plumbing Llc Permit type: Plumbing permit | Permit status: Active | Completion date: June 28, 2017 | Permit id: 742143 | |||||
For the construction of a four-story structure with rear deck at second floor level, used as a three-family dwelling, as per approved plans. Date: March 30, 2017 Permit type: New construction permit | Permit status: Active | Completion date: September 5, 2017 | Permit id: 761891 |