Content |
---|
SCORE 95 Installation of a flush mount, grid-tied, 3. 64 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. ![]() ![]() Client: Frank Bryan,Katherine Noll | Applicant: Rec Solar Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 13, 2014 | Current use: Single family d |
SCORE 95 Installation of a flush mount, grid-tied, 3. 64 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Frank Bryan | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 13, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-00273 |
SCORE 100 Tear-off & reroof of sfd, 31 squares of asphalt shingles on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. ![]() ![]() Client: Frank Bryan,Katherine Noll | Applicant: Premier Roofing | Permit type: Roofing | Permit status: Cmp | Completion date: January 14, 2014 | Current use: Single family d |
SCORE 100 Tear-off & reroof of sfd, 31 squares of asphalt shingles on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Client: Frank Bryan | Permit type: Roofing | Permit status: Cmp | Completion date: January 14, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-04176 |
Contractor Rank | Contractor Details | Number of Projects | Avg. Project Cost | Years in Business | Photos |
---|---|---|---|---|---|
SCORE 100 | John Mclaughlin | 6,734 Projects | $132,014 Avg. Project Cost | 10 Years in Business | ![]() |
SCORE 100 | Renewal By Andersen | 2,766 Projects | $7,573 Avg. Project Cost | 12 Years in Business | ![]() |
SCORE 99 | Richard Taylor | 238 Projects | $51,490 Avg. Project Cost | 18 Years in Business | ![]() |
SCORE 99 | Brian Field | 161 Projects | $73,354 Avg. Project Cost | 16 Years in Business | ![]() |
SCORE 99 | John Ryan | 1,271 Projects | $37,669 Avg. Project Cost | 21 Years in Business | ![]() |