Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Install a heat pump, natural gas auxiliary furnace with new 96. 2% fau. Air seal, repair/ replace subvloor insulation with new vapor barrier in side yard outside setback requirements. Date: May 28, 2014 Contractor: Sebastopol Heat And Cool Inc Permit status: Finaled | Permit id: B14-1908 | |||||
SCORE 95 Install roof mounted pv system - 5kw Date: February 17, 2015 Contractor: Vivint Solar Developer Llc Permit type: Roof | Permit status: Issued | Permit id: B15-0646 | |||||
SCORE 59 Tear off, reroof 15 square of sfd with new class a comp, replace plumbing at vanity and shower, and replace fan and light in bathroom. Subject to field inspection for energy eff. Date: June 12, 2013 Contractor: Jireh Maintenance And Construction Permit type: Plumbing | Permit status: Finaled | Permit id: B13-2092 | |||||
SCORE 100 Replace (1) existing sliding glass door and (1) window. Replace existing windows with sliding glass door2 in 2 bedrooms. Date: June 11, 2015 Contractor: Ownerbuilder Permit type: Residential addition-alteration | Permit status: Finaled | Current use: Residential | Permit id: B15-2562 | Parcel: 183030028 | |||||
SCORE 95 Install roof mounted pv system, 5 kw. Permit type: Residential addition-alteration | Permit status: Finaled | Current use: Residential | Permit id: B15-0646 | Parcel: 183030028 |