Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit ![]() Permit status: Completed | Permit id: 560406 | |||||
Demolition permit ![]() Permit status: Completed | Permit id: 512406 | |||||
Alteration permit ![]() Permit status: Completed | Permit id: 521703 | |||||
Plumbing permit ![]() Permit status: Completed | Permit id: 575746 | |||||
Electrical permit ![]() Permit status: Completed | Permit id: 579583 | |||||
Administrative permit ![]() Permit status: Completed | Permit id: 536436 | |||||
Mechanical permit ![]() Permit status: Completed | Permit id: 578536 | |||||
Electrical permit ![]() Permit status: Completed | Permit id: 579583 | |||||
Alteration permit ![]() Permit status: Completed | Permit id: 554240 | |||||
Demolition permit ![]() Permit status: Completed | Permit id: 512406 | |||||
Administrative permit ![]() Permit status: Completed | Permit id: 536436 | |||||
Plumbing permit ![]() Permit status: Completed | Permit id: 575746 | |||||
SCORE 100 Wire first floor and third floor apartment, recepts, switches & lights as per 2008 nec (south district) replace fire alarm system as per nfpa72 ![]() ![]() Permit type: Electrical permit | Permit status: Completed | Completion date: October 30, 2015 | Permit id: 579583 | |||||
SCORE 100 Install 2 1 2 ton air handlers and heat pumps. Run main duct work and return wrap insulated around ouside main duct work (unit and duct work to be confined in individual space. Non penetrations through rated assys) ![]() ![]() Permit type: Mechanical permit | Permit status: Completed | Completion date: June 11, 2015 | Permit id: 578536 | |||||
SCORE 100 Ct and water service pa20143241506 (3 family)"self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" ![]() ![]() Permit type: Plumbing permit | Permit status: Completed | Completion date: June 11, 2015 | Permit id: 576460 | |||||
SCORE 100 Install 2 water closets, 2 lavy sinks, 2 bath tub, 1 kitchen sink, replace 8 of stack pipe - the installation will comply with the philadelphia plumbing code 2004 ![]() ![]() Permit type: Plumbing permit | Permit status: Completed | Completion date: June 11, 2015 | Permit id: 575746 | |||||
SCORE 100 Install 2 1 2 ton air handler with related ductwork(multi-family) ![]() ![]() Permit type: Mechanical permit | Permit status: Completed | Completion date: June 11, 2015 | Permit id: 560406 | |||||
SCORE 100 9 fixtures with piping for apt c ![]() ![]() Permit type: Plumbing permit | Permit status: Completed | Completion date: June 6, 2015 | Permit id: 555601 | |||||
Level ii interior alterations to an existing bldg with no changes to height of area as per plan. ![]() Permit type: Alteration permit | Permit status: Completed | Completion date: June 11, 2015 | Permit id: 513963 | |||||
SCORE 99 6 square feet, interior demolition in 3rd floor apartment c of non load bearing walls and ceilings only. No other work allowed under this permit. No structural changes. Must maintain all code required fire rating on wall and floor ceiling assemblies. Three sets of plans drawn to professional quality are to be submitted for review and approval by the department before work on renovation starts. Contact streets department for dumpster permit and footway closure permits. ![]() ![]() Permit type: Demolition permit | Permit status: Completed | Completion date: May 19, 2014 | Permit id: 512406 | |||||
SCORE 99 Repair ceiling & walls, replace windows the same size, refinish wood floor ![]() ![]() Permit type: Alteration permit | Permit status: Completed | Completion date: June 11, 2015 | Permit id: 521703 | |||||
Amending building permit# 513963 to reflect updated structural information, as shown on plans and structural report ![]() Permit type: Administrative permit | Permit status: Completed | Completion date: June 11, 2015 | Permit id: 536436 | |||||
Level ii alterations (no change in occupancy) to existing basement and first floor dwelling unit including new emergency escape egress well as per approved plans. Separate permits required for any mep work ![]() Permit type: Alteration permit | Permit status: Completed | Completion date: June 18, 2015 | Permit id: 554240 |