Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Installation of a whole house fan -- includes associated electrical (switch leg & j-box). Fan will slip in between existing framing -- no framing modifications allowed. Date: December 7, 2009 Contractor: Dda Heating And Air Client: Sara Steen,Douglas Steen | Applicant: Dda Heating & Air | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: October 18, 2010 | Current use: Single family d | |||||
SCORE 59 Tear-off & reroof of sfd, 33. 2 squares of composition shingles on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Date: June 6, 2013 Contractor: Eagle Ents Llc Inc Client: Sara Steen,Douglas Steen | Applicant: Eagle Ents Llc Inc | Permit type: Roofing | Permit status: Cmp | Completion date: June 12, 2013 | Current use: Single family d | |||||
SCORE 95 Installation of rooftop, flushmounted, grid-tied, 5. 88 kw, photovoltaic solar energy system on residence. Date: June 20, 2013 Contractor: Solarcity Corporation Client: Sara Steen,Douglas Steen | Applicant: Solarcity Corporation | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 19, 2013 | Current use: Single family d | |||||
SCORE 56 Owner contractor-kitchen remodel to include framing, electrical, plumbing, mechanical as required. Client: Sara Steen,Douglas Steen | Applicant: Nasir Rizvi | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d | |||||
SCORE 98 Installation of a whole house fan -- includes associated electrical (switch leg & j-box). Fan will slip in between existing framing -- no framing modifications allowed. Client: Sara Steen | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: October 18, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04979 | |||||
SCORE 59 Tear-off & reroof of sfd, 33. 2 squares of composition shingles on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Client: Sara Steen | Permit type: Roofing | Permit status: Cmp | Completion date: June 12, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-02599 | |||||
SCORE 95 Installation of rooftop, flushmounted, grid-tied, 5. 88 kw, photovoltaic solar energy system on residence. Client: Sara Steen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 19, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-02863 | |||||
Owner contractor-kitchen remodel to include framing, electrical, plumbing, mechanical as required. 9 29 15 - scope of work increased to include 6 new ceiling can lights in the office and a replacement handrail to existing stairs. The 3 new skylights and larger replacement window will be under separate permit after engineer letter is presented Date: August 18, 2015 Value: $5,350 Client: Sara Steen | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: January 6, 2016 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2015-03472 | |||||
Owner contractor-add three skylight above dining room, replace window in old dining room with same size and enlarge window opening in old kitchen. Scope of work also includes converting kitchen pantry into new closet in office (252 s. F. Of remodeled area). Date: October 2, 2015 Value: $150 Client: Sara Steen | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 6, 2016 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2015-04352 |